Korea is a global steel producer and a major consumer while iron ore producing is very low compared to the demand. On the other hand, North Korea holds tremendous amount of iron reserves and, however, its producing rate is limited. Moreover, the data regarding mineral resources of North Korea is very limited and uncertain because of political isolation. This study estimated the amount of iron ore resource and production amount for the Musan Iron mine, the world-known open-pit mine of North Korea, using satellite imagery(Landsat MSS, ASTER) and digital maps between 1976 to 2007. As a result, the mining area of Musan mine was increased by $6.1km^2$ during the 30 years and the mining sector was estimated as $4.9km^2$. We estimated the iron resources and production amount of 0.7 and 0.2 billion metric tons, respectively based on 3D modeling and average iron ore density of Anshan formation in China. This amount indicates 8.1 million tons of annual average production and it coincides well with previous reports. We expect this study would be utilized significantly on inter-Korean exchange programs by providing trustable preliminary data.
In rock drilling, the most important characteristic to clarify is the wear of the drill bits. The reason that the rock drill bits fail with time is wear. In dry sliding contact adhesive wear deteriorates the materials in contact, quickly, and is the result of shear fracture in the momentary contact joins between the surfaces. This paper aims at presenting an overview of the assessment of WC/Co cemented carbide (CC) tricone bit in rotary drilling. To study wear of these bits, two approaches have been used in this research. Firstly, the new bits were weighted before they mounted on the drill rigs and also after completion their useful life to obtain bit weight loss percentage. The characteristics of the rock types drilled by using such this bit were measured, simultaneously. Alternatively, to measure contact wear, namely, matrix wear a micrometer has been used with a resolution of 0.02 mm at different direction on the tricone bits. Equivalent quartz content (EQC), net quartz content (QC), muscovite content (Mu), coarseness index (CI) of drill cuttings and compressive strength of rocks (UCS) were obtained along with thin sections to investigate mineralogical properties in detail. The correlation between effective parameters and bit wear were obtained as result of this study. It was observed that UCS shows no significant correlation with bit wear. By increasing CI and cutting size of rocks wear of bit increases.
It is only possible through the image analysis of borehole wall and the core recovered from borehole constructed in rock mass that the real information about geologic characteristics in rock mass is directly obtained in primary research. Monitoring apparatus with multi-functional utility has implemented and applied in-situ condition for finding the geologic condition of target area. But, this apparatus is very expensive to be applied at the risk of loss during monitoring and cause hard work for moving them to the determined position. This paper shows the underground imaging from the borehole information obtained by a borehole camera with the simple utility and low cost enough to investigate the characteristics of borehole wall. Monitoring for this has been done in open-pit mine located at the northeastern part of Fukuoka Prefecture in Japan, and finally the three dimensional imaging of geological discontinuity was discussed relative to the field condition.
We have verified applicability of UAV(Unmanned Aerial Vehicle) photogrammetry to a mining engineering. The test mine is a smectite mine located at Gyeongju city in Gyeongnam province, Koera. 448 photos over area of $600m{\times}380m$ were taken with overlapped manner using Cannon Mark VI equipped to multicopter DJI S1000, which were processed with AgiSoft Photoscan software to generate orthophoto and DEM model of the study area. photogrammetry data with 10 cm resolution were generated using 6 ground control positions, which were exported to the 3D geological modeling software to make a topographic surface object. Monitoring of amount of ore production and landsliding could be done with less than 1 hours photographing as well as low cost. A direct link between UAV photogrammetry and 3D geological modeling technology might increase productivity of a mine due to appling the topographical surface change immediately according to the mining operation.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.1
/
pp.768-773
/
2020
In large-scale land development for the rational use and management of national land resources, the use of geospatial information is essential for the efficient management of projects. Recently, drone LiDAR (Light Detection And Ranging) has attracted attention as an effective geospatial information construction technique for large-scale development areas, such as housing site construction and open-pit mines. Drone LiDAR can be classified into a method using SLAM (Simultaneous Localization And Mapping) technology and a GNSS (Global Navigation Satellite System)/IMU (Inertial Measurement Unit) method. On the other hand, there is a lack of analytical research on the application of drone LiDAR or the characteristics of each method. Therefore, in this study, data acquisition, processing, and analysis using SLAM and GNSS/IMU type drone LiDAR were performed, and the characteristics and utilization of each were evaluated. As a result, the height direction accuracy of drone LiDAR was -0.052~0.044m, which satisfies the allowable accuracy of geospatial information for mapping. In addition, the characteristics of each method were presented through a comparison of data acquisition and processing. Geospatial information constructed through drone LiDAR can be used in several ways, such as measuring the distance, area, and inclination. Based on such information, it is possible to evaluate the safety of large-scale development areas, and this method is expected to be utilized in the future.
미 $\cdot$ 일에서 기 개발 운영되고 있는 대형 노천 광산 및 광산 장비 제작 공장에 대한 전반적인 실태 파악을 통하여 향후 대형화로 국제 규모화될 당사 석회석 광산의 운영 및 기술적인 방향을 모색코저 함이 금번 출장의 목적이었다. 이에 당사 광산분야 기술자 6명으로 team을 구성, 76년 하반기에 약 1개월은 미국에서, 약 1개월은 일본에서 양국 굴지의 10여 open pit mine 및 3개 장비 메이카를 방문 견학하였다. 금번 방문결과 다음과 같은 점을 느꼈다. 첫째 금번 당사의 560만톤 증설은 사실상 미 $\cdot$ 일을 앞지르고 국제적으로 굴지의 규모임을 확인할 수 있었고 둘째 광상의 지리적 여건 비교에서는 미국의 것에는 뒤지나 일본의 조건에 비해서는 우리의 것이 결코 악조건이 아니며 세계 특히 일본 석회석 광산업계가 안고 있는 제반문제점의 심각성(광구 경계 인접에 따른 분쟁, 시가지 인접에 따른 공해문제, 개발 여건의 불량 등)에 비추어 볼 때 국내광산 기술자들의 노력 여하에 따라 일본은 충분한 경쟁대상이 될 수 있으며 국내 시멘트업계, 광산의 지리적 지질적 여건상 일본광산보다 더욱 우수한 광산을 만들 수 있다는 자신감을 얻었다. 그러나 첫째 장기적인 측면에서의 광산 개발의 결여, 둘째 맥석과 폐토 처리 및 quarry QC의 불가피성, 셋째 사회적 요소의 낙후(M.S 뇌관부재, 메이카 출장에 의한 장비의 수리, 화약류의 산원(山元) 혼합사용 등) 등은 두드러진 우리의 결함이라고 느꼈으며 이들 결함의 시정, 보완을 위해서 사내외적으로 기존질서의 재검토가 이루어져야 할 것으로 생각된다. 미 $\cdot$ 일 광산에서 일반화되어 있는 radio(walkie-talkie) system 및 electric shovel, 주우시멘트사 산구사무소에서 시도된 belt반전장치, 인력의 확대관리 등은 조기도입하여 실용화 할 수 있는 대상이라 생각하며 일철의 조형산개발(72년 생산 개시, 광산 개발비 200억원, 년산능력 800만톤)은 괄목할만한 것이었다. 또한 앞으로 국내업계 여건이 허락하는 한 광산 기술자의 해외파견 회수를 증가시켜 더 많은 사람들이 직접 보고 느끼어 우리의 것을 개선 창조해 나갈 수 있는 기회를 많이 가져 국내는 물론, 국제 경쟁에 대처할 수 있는 업계 기술자의 자질 향상을 바란다.
미$\cdot$일에서 기 개발 운영되고 있는 대형 노천광산 및 광산장비 제작 공장에 대한 전반적인 실태 파악을 통하여 향후 대형화로 국제규모화될 당사 석회석 광산의 운영 및 기술적인 방향을 모색코자 함이 금번 출장의 목적이었다. 이에 당사 광산분야 기술자 6명으로 팀을 구성, 76년 하반기에 약 1개월은 미국에서, 약 1개월은 일본에서 양국 굴지의 10여 open pit mine 및 3개 장비 메이커를 방문 견학하였다. 금번 방문 결과 다음과 같은 점을 확인할 수 있었다. 첫째 금번 당사의 560만톤 증설은 사실상 미$\cdot$일을 앞지르고 국제적으로 굴지의 규모임을 확인할 수 있었고, 둘째 deposit(광상)의 지리적 여건비교에서는 미국의 것에는 뒤지나 일본의 조건에 비해서는 우리의 것이 결코 악조건이 아니며, 세째 특히 일본 석회석 광산업계가 안고 있는 제반문제점의 심각성(광구 경계 인접에 따른 분쟁, 시가지 인접에 따른 공해문제, 개발 여건의 불량 등)에 비추어 볼 때 국내 광산 기술자들의 노력 여하에 따라 일본은 충분한 경쟁대상이 될 수 있으며 국내시멘트업계 광산의 지리적, 지질적 여건상 일본광산보다 더욱 우수한 광산을 만들 수 있다는 자신감을 얻었다. 그러나 (1) long term 한 측면에서의 광산개발의 결여 (2) dyke와 폐토 처리 및 quarry QC의 불가피성 (3) 사회적 요소의 낙후(M.S 뇌관부재, 메이커 출장에 의한 장비의 수리, 화약류의 산원 혼합사용 등)등은 두드러진 우리의 결함이라고 느꼈으며 이들 결함의 시정, 보완을 위해서 사내외적으로 기존질서의 재검토가 이루어져야 할 것으로 사료된다. 미$\cdot$일 광산에서 일반화되어 있는 radio(walkie-talkie) system 및 electric shovel 주우 Cement Co., 산구사업소에서 시도된 belt 반전장치, 인력의 확대관리 등은 조기도입하여 실용화할수 있는 대상이라 생각하며 일철의 조형산 개발(72년 생산 개시, 광산 개발비 200억원, 연산 능력 800만톤)은 괄목할만한 것이었다. 또한 앞으로 국내업계 여건이 허락하는 한 광산 기술자의 해외파견 회수를 증가시켜 더 많은 사람들이 직접 보고 느끼어 우리의 것을 개선 창조해 나갈 수 있는 기회를 많이 가져 국내는 물론 국제 경쟁에 대처할 수 있는 업계 직원의 자질 향상을 바란다.
S. Benarous;A. Azbouche;B. Boumehdi;S. Chegrouche;N. Atamna;R. Khelifi
Nuclear Engineering and Technology
/
v.54
no.11
/
pp.4253-4264
/
2022
Since the implementation of the phosphate project in Bled El-Hadba (BEH) deposit, western region of Tébessa, no detailed study has been conducted to assess the natural radioactivity distribution and the associated radiological risk parameter for this open-pit mine. For the sake of determining a credible premining reference database for the region of interest, 21 samples were collected from different geological layers of the above-mentioned deposit. Gamma Spectrometry was applied for measuring radioactivity using a high resolution HPGe semiconductor detector. The obtained activity results have shown a significant broad variation in the radioactive contents for the different phosphate samples. The total average concentrations (in Bq·kg-1) for 226Ra, 238U, 235U, 232Th and 40K computed for the different type of phosphate layers were found to be 570 ± 169, 788 ± 280, 52 ± 18, 66 ± 6 and 81 ± 18 respectively. The mean activity concentrations of the measured radionuclides were compared to other regional and worldwide deposits. The ratios between the detected radioisotopes have been calculated for spatial distribution of natural radionuclides in the study area. Based on the aforementioned activity concentrations, the corresponding radiation hazard parameters were assessed. Correlations between the obtained parameters were drawn and a multivariate statistical analysis (Pearson Correlation, Cluster and Factor analysis) was carried out in order to identify the existing relationships.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.12
/
pp.638-643
/
2017
The 3D laser scanner operates by measuring the distance from the sensor to the target and operates on the same principle as Electronic Distance Measuring (EDM). Recently, 3D laser scanning technology has been rapidly developed in line with the strongly increasing demand for 3D information acquisition. Therefore, it is now possible to more easily acquire geometric information of various objects existing in real space. In this study, we constructed geospatial information by using new equipment which integrated 3D laser scanner and total station, and we suggest the possibility of using new technology for geospatial information construction by comparing and analyzing with existing methods. In the study result, we demonstrated the efficiency of the geospatial information constructed by integration of 3D laser scanner and total station. The proposed method is expected to shorten the time required for data acquisition compared to the existing method using the existing total station. Furthermore, it is possible to use various methods such as cross section analysis and volume calculation using the acquired data. In the future, spatial information construction by integration of 3D laser scanner and total station will help improve work efficiency in related fields.
The surveyed mines are located in a polymetallic vein, replacement, and skarn mineral district in the central Andes of Peru. Iscaycruz, which includes underground and open pit mines that produce zinc and lead concentrates, was the largest mineral deposit of an important group of base metal deposits in the Andes of central Peru. The deposits are sub-vertical seams of polymetallic ores(Zn, Cu, and Pb). These seams are hosted by Jurassic and Cretaceous sedimentary rock formation. The intrusion of igneous rocks in these formations originated metallic deposits of metasomatic and skarn types. The Raura mine is composed of polymetallic deposit of veins and replacement orebodies. The main sedimentary unit in the area is Cretaceous Machay Limestone. The Raura depression contains several orebodies each with different mineralization: predominantly Pb-Zn bearing Catuvo orebody; Ag-rich galena-bearing Lake Ninacocha orebody; Cu-Ag bearing Esperanza and Restauradora orebody. Huaron is a hydrothermal polymetallic deposit of silver, lead, zinc, and copper mineralization hosted within structures likely related to the intrusion of monzonite dikes, principally located within the Huaron anticline. Mineralization is encountered in veins parallel to the main fault systems, in replacement bodies known as "mantos" associated with the calcareous sections of the conglomerates and other favourable stratigraphic horizons, and as dissemination in the monzonitic intrusions at vein intersections.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.