• Title/Summary/Keyword: One-stage operation

Search Result 516, Processing Time 0.029 seconds

A Study on The IC Design of 1[V] CMOS Operational Amplifier with Rail-to-rail Output Ranges (Rail-to-rail 출력을 갖는 1[V] CMOS Operational Amplifiler 설계 및 IC 화에 관한 연구)

  • Jeon, Dong-Hwan;Son, Sang-Hui
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.461-466
    • /
    • 1999
  • A CMOS op amp with rail-to-rail input and output ranges is designed in a one-volt supply. The output stage of the op amp is used in a common source amplifier that operates in sub-threshold region to design a low voltage op amp with rail-to-tail output range. To drive heavy resistor and capacitor loads with rail-to-rail output ranges, a common source amplifier which has a low output resistance is utilized. A bulk-driven differential pair and a bulk-driven folded cascode amplifier are used in the designed op amp to increase input range and achieve 1 V operation. Post layout simulation results show that low frequency gain is about 58 ㏈ and gain bandwidth I MHz. The designed op amp has been fabricated in a 0.8${\mu}{\textrm}{m}$ standard CMOS process. The measured results show that this op amp provides rail-to-rail output range, 56㏈ dc gain with 1 MΩ load and has 0.4 MHz gain-bandwidth with 130 ㎊ and 1 kΩ loads.

  • PDF

A 32-bit Microprocessor with enhanced digital signal process functionality (디지털 신호처리 기능을 강화한 32비트 마이크로프로세서)

  • Moon, Sang-ook
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • v.9 no.2
    • /
    • pp.820-822
    • /
    • 2005
  • We have designed a 32-bit microprocessor with fixed point digital signal processing functionality. This processor, combines both general-purpose microprocessor and digital signal processor functionality using the reduced instruction set computer design principles. It has functional units for arithmetic operation, digital signal processing and memory access. They operate in parallel in order to remove stall cycles after DSP or load/store instructions, which usually need one or more issue latency cycles in addition to the first issue cycle. High performance was achieved with these parallel functional units while adopting a sophisticated five-stage pipeline stucture.

  • PDF

Multiobjective Optimal Reactive Power Flow Using Elitist Nondominated Sorting Genetic Algorithm: Comparison and Improvement

  • Li, Zhihuan;Li, Yinhong;Duan, Xianzhong
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.1
    • /
    • pp.70-78
    • /
    • 2010
  • Elitist nondominated sorting genetic algorithm (NSGA-II) is adopted and improved for multiobjective optimal reactive power flow (ORPF) problem. Multiobjective ORPF, formulated as a multiobjective mixed integer nonlinear optimization problem, minimizes real power loss and improves voltage profile of power grid by determining reactive power control variables. NSGA-II-based ORPF is tested on standard IEEE 30-bus test system and compared with four other state-of-the-art multiobjective evolutionary algorithms (MOEAs). Pareto front and outer solutions achieved by the five MOEAs are analyzed and compared. NSGA-II obtains the best control strategy for ORPF, but it suffers from the lower convergence speed at the early stage of the optimization. Several problem-specific local search strategies (LSSs) are incorporated into NSGA-II to promote algorithm's exploiting capability and then to speed up its convergence. This enhanced version of NSGA-II (ENSGA) is examined on IEEE 30 system. Experimental results show that the use of LSSs clearly improved the performance of NSGA-II. ENSGA shows the best search efficiency and is proved to be one of the efficient potential candidates in solving reactive power optimization in the real-time operation systems.

A Hardware Implementation of Fingerprint Identification Thinning Algorithm (지문인식 세선화 알고리즘의 하드웨어 구현)

  • Woo, Yun-Hee;Ha, Mi-Na;Jung, Seung-Min
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2010.05a
    • /
    • pp.493-496
    • /
    • 2010
  • This paper proposes an effective hardware scheme for thinning stage processing of a fingerprint identification algorithm based on minutiae with 40% cycle occupation of 32-bit RISC microprocessor. The thinning step is needed to be processed by hardware block, because it is performed repeatedly by processing the same operation using an image window masking method. It can reduce the burden of the system and improve speed. The hardware is implemented by HDL and simulated. The result is compared with a conventional one.

  • PDF

A Study on High Performances Floating Point Unit (고성능 부동 소수점 연산기에 대한 연구)

  • Park, Woo-Chan;Han, Tack-Don
    • The Transactions of the Korea Information Processing Society
    • /
    • v.4 no.11
    • /
    • pp.2861-2873
    • /
    • 1997
  • An FPU(Floating Point unit) is the principle component in high performance computer and is placed on a chip together with main processing unit recently. As a Processing speed of the FPU is accelerated, the rounding stage, which occupies one of the floating point Processing steps for floating point operations, has a considerable effect on overall floating point operations. In this paper, by studying and analyzing the processing flows of the conventional floating point adder/subtractor, multipler and divider, which are main component of the FPU, efficient rounding mechanisms are presented. Proposed mechanisms do not require any additional execution time and any high speed adder for rounding operation. Thus, performance improvement and cost-effective design can be achieved by this approach.

  • PDF

Clinical Application of the Delayed Procedure in the Distally Based Sural Flap (원위기저비복피판에서 지연처치의 임상적 적용)

  • Yim, Hyung-Woo;Park, Yong-Joon
    • Archives of Plastic Surgery
    • /
    • v.37 no.6
    • /
    • pp.775-778
    • /
    • 2010
  • Purpose: Reconstruction of soft tissue defects with osteomyelitis in the lower third of the leg represents a challenge to plastic surgeons. Moreover, it is more arduous in multimorbid patients. One excellent option for reconstruction of these defects is to use a delayed distally based sural flap. Methods: We successfully used delayed distally based sural flap with a two-step procedure. During the first operation, radical debridement and elevation of flap were performed. The raised flap was fixed again at the donor site. The delay period ranged from seven to ten days. Between August 2008 and July 2009, we underwent operations for five patients using this technique. The size of flap varied from $10{\times}6\;cm$ to $12{\times}14\;cm$. Results: All flaps successfully survived. Partial skin loss of the grafted site was seen in two patients but no further surgical procedure was required for wound healing. Complaints of hypoesthesia on the lateral part of the foot was observed. In a three month follow-up period, hypoesthesia was resolved spontaneously. Conclusion: Delayed procedure improves the viability of distally based sural flap in high risk, critically multimorbid patients. We recommend that, if a two-stage operative approach is required, the delayed procedure should be considered.

A Huge Trigeminal Schwannoma in a Child with Neurofibromatosis Type II (신경섬유종증 II형 소아에서 발생한 거대 삼차신경초종)

  • Lee, Mun Young;Kim, Tae Young;Moon, Seong Keun;Kim, Jong Moon
    • Journal of Korean Neurosurgical Society
    • /
    • v.30 no.sup1
    • /
    • pp.140-143
    • /
    • 2001
  • We report a case of huge trigeminal schwannoma in a 10-year-old boy with neurofibromatosis type II, extending into the three spaces of the left middle, posterior, and infratemporal fossa. Initially we thought the child had a solitary trigeminal schwannoma, and most of the mass was resected successfully through one-stage operation, cranio-orbito-zygomatic intradural approach. However during the follow-up of the patient we found radiographically other multiple intracranial tumors of bilateral acoustic schwannomas, right trigeminal schwannoma, and foramen magnum tumor. Eventually the patient was diagnosed as neurofibromatosis type II presenting multiple intracranial tumors. We think childhood trigeminal schwannoma, even though in the case of solitary tumor, should be considered as possible initial manifestation of neurofibromatosis type II and that careful follow-up for the possibility of occurrence of other brain tumors such as schwannomas or meningiomas is necessary.

  • PDF

A study on the optimum operation of model ice in Maritime & Ocean Engineering Research Institute(MOERI) (빙수조 모형빙 활용 최적화 방안 연구)

  • Kim, Hyun Soo;Lee, Chun-Ju;Jeong, Uh-Cheul
    • Journal of the Korean Society of Mechanical Technology
    • /
    • v.13 no.4
    • /
    • pp.109-115
    • /
    • 2011
  • The ice tank is important facility to check the performance of the ship and offshore in ice condition before the construction. MOERI(Maritime & Ocean Engineering Research Institute) constructed ice model basin on the end of 2010. The ice technology to know the phenomena of ice near the ship and to estimate power of the ship in model scale is the main characteristic of the ice model basin. To achieve this goal in one ice sheet, making of test plan and feasibility check of test possibility have to review in the beginning stage of the every test. This paper describes the number of maximum resistance and self propulsion test in a sheet of level ice and proposes the methodology to optimize pack ice, rubble ice, brash ice and ice ridge test in MOERI ice tank. The feasibility of free running test to know maneuvering performance in ice field and some specific idea to measuring ice thickness and ice ridge shape was proposed.

A Study on the Standards of Open Information About Telecommunications Facilities for Promoting FTTH Investment (FTTH망 투자 촉진을 위한 전기통신설비의 정보제공 기준에 관한 연구)

  • Cho, Eun-jin;Kweon, Soo-cheon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.674-677
    • /
    • 2009
  • The one of the big issues in fixed markets is the investment of next generation networks. The nation-wide incumbent has provided the copper cable based access networks in so far. However in the future multiple providers participant in investing network in first stage of the network investment like mobile networks. Each NRA makes efforts on the resolving construction cost of civil engineering costs through the opening conduits. To smooth operation, information opening service is needed then NRAs must determined the level of opened information and cost of usage information and so on. This paper proposed the alternation of the issues to boost the investment of the next generation networks.

  • PDF

Risk-informed design optimization method and application in a lead-based research reactor

  • Jiaqun Wang;Qianglong Wang;Jinrong Qiu;Jin Wang;Fang Wang;Yazhou Li
    • Nuclear Engineering and Technology
    • /
    • v.55 no.6
    • /
    • pp.2047-2052
    • /
    • 2023
  • Risk-informed approach has been widely applied in the safety design, regulation, and operation of nuclear reactors. It has been commonly accepted that risk-informed design optimization should be used in the innovative reactor designs to make nuclear system highly safe and reliable. In spite of the risk-informed approach has been used in some advanced nuclear reactors designs, such as Westinghouse IRIS, Gen-IV sodium fast reactors and lead-based fast reactors, the process of risk-informed design of nuclear reactors is hardly to carry out when passive system reliability should be integrated in the framework. A practical method for new passive safety reactors based on probabilistic safety assessment (PSA) and passive system reliability analyze linking is proposed in this paper. New three-dimension frequency-consequence curve based on risk concept with three variables is used in this method. The proposed method has been applied to the determination optimization of design options selection in a 10 MWth lead-based research reactor(LR) to obtain one optimized system design in conceptual design stage, using the integrated reliability and probabilistic safety assessment program RiskA, and the computation resources and time consumption in this process was demonstrated reasonable and acceptable.