• 제목/요약/키워드: On Line Maintenance

검색결과 630건 처리시간 0.026초

시멘트모르터 충진형 포장궤도의 실물 반복재하특성에 관한 연구 (Study on the Full-Scale Cyclic Loading Characteristics for Cement Mortar Pouring type Paved Track)

  • 이일화;장승엽;김은
    • 한국철도학회논문집
    • /
    • 제9권3호
    • /
    • pp.305-312
    • /
    • 2006
  • Gravel ballasted tracks are used as a basic structure for the domestic railway tracks. However, such kind of tracks has few disadvantages with service life of the structure, such as rapid deterioration of the tracks. Due to this reason, there is a need to develop low maintenance track to improve the service life of the conventional line tracks. CMP paved tacks are one of the kind of concrete tracks those were manufactured by using the prepacked concrete techniques. The purpose to develop paved tracks is to reduce the maintenance cost. The most important controlling factors to design the paved tracks are surrounding environmental condition and repeated train loading. In this study, in order to investigate the deformation characteristics such as displacement, earth pressure, strain ratio, and crack along the repeated loading cycle, cyclic loading test through real scale model was carried out.

퍼지신경망을 이용한 철근콘크리트 교량의 손상도 평가 (Damage Assessment of RC Bridge Using Neural-Fuzzy System)

  • 성영준;김기봉
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제3권4호
    • /
    • pp.129-137
    • /
    • 1999
  • Assessment of structural damage is a complex subject imbued with uncertainty and vagueness. This complexity arises from the use of subjective opinion and imprecise numerical data. Recently several active researches have been performed using new methods such as neural network approach or on-line damage detection. In this paper, Damage assessment (diagnosis) of the concrete bridges is studied by a new approach utilizing a neural fuzzy system that combined a neural network and a fuzzy logic. By applying this system to actual in-service bridges, it has been verified that the neural fuzzy method is effective for the bridge diagnosis.

  • PDF

Commercial Office의 Facility Management(FM) 업무 현황 분석을 통한 성과 평가체계 구축 방안 (A Study On the Development of Facility Management Performance Evaluation system by Analyzing Current FM Practices of Commercial Office Buildings)

  • 윤종한;차희성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.89-90
    • /
    • 2016
  • Despite the rise of importance of Facility Management(FM), relatively little attention was paid to evaluate FM efficiency and drive for greater FM efficiency. The purpose of the present paper is to offer a quantitative analysis of 14 Key Success Factors(KSF) and 22 detailed maintenance practices in order to develop FM evaluation system. In addition, from survey with Owner/Property Manager group and Facility Manager group, the present paper measures both importance of detailed maintenance practices and performance satisfaction. It is expected that by using the result of this survey, this paper helps increase efficiency in FM. Moreover, It is expected that this paper will be used as base line data in developing FM practice evaluation system.

  • PDF

레일 피로수명 예측에 따른 레일 연마의 효용성 평가 (Evaluation on Effectiveness of Rail Grinding by Prediction of Rail Fatigue Life)

  • 김만철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.255-261
    • /
    • 2008
  • The importance of maintenance of rail surface defects is increasing according to the KTX operation. That is because during high speed operation of rolling stocks, rail surface defects shorten fatigue life of rail, accelerate track degradation and deteriorate ride comfort. Rail grinding has been applied for effective rail maintenance in Kyeong-Bu HS line. This paper evaluates the effectiveness of rail grinding in term of rail fatigue life. To this end, the stresses of the ground rail are measured under KTX running and the equivalent stress range is calculated by RMC after the frequency analysis done with Rainflow counting method. Also, Pamglen-Miner rule is applied to predict the fatigue life of ground rail. The result of the analysis shows that the fatigue life of ground rail is increased by 15%.

  • PDF

자동열차제어장치 AF궤도회로 S-BOND의 사용신뢰도 분석 (Field Reliability Analysis of S-Bond of AF Track Circuit for Automatic Train Control System)

  • 최규형;고영환
    • 전기학회논문지
    • /
    • 제58권2호
    • /
    • pp.308-313
    • /
    • 2009
  • This paper presents a reliability analysis of S-bonds for AF track circuits, which detect train movement and transmit a speed control signal to the train. Field survey shows that S-bonds are exposed to very large vibrations transferred from rail, and suffer from frequent failures when they were installed on ballasted track. We collected the time-to-failure data of S-bonds from the maintenance field of Seoul metro line 2, and made a parametric approach to estimate the statistical distribution that fits the time-to-failure data. The analysis shows that S-bonds have time-to-failure characteristics described by Weibull distribution. The estimated shape parameter of Weibull distribution is 1.1, which means the distribution has constant failure rate characteristics like exponential distribution. The reliability function, hazard function, percentiles and mean lifetime are derived for maintenance support.

영상처리를 이용한 가동브래킷 변형 검사 기법에 대한 연구 (A Study on Cantilever Deformation Inspection Method Using Image Processing)

  • 한승훈;조민수;유영기;이병곤
    • 전기학회논문지
    • /
    • 제66권6호
    • /
    • pp.988-994
    • /
    • 2017
  • The risk of facilities in catenary is increasing because the railway section extension and high-speed train service. And visual check of workforce is not enough time to maintain the extensive railway facilities. Accordingly, The technical development trend of maintenance of railway facilities can be seen by automation and application of IT technology, especially the mechanization work and the information technology are spreading in the maintenance work of the train line solved by manpower. In this paper, we describe the method by obtaining the cantilever image using acquisition device and pole inspection system in high speed vehicle, to check the variation of the cantilever component using image processing.

전동차 제동장치의 고장데이터와 비용함수를 고려한 유지보수 정책에 관한 연구 (A Study on the Maintenance Policy Considering the Failure Data of the EMU Braking System and the Cost Function)

  • 한재현;김종운;구정서
    • 한국안전학회지
    • /
    • 제30권3호
    • /
    • pp.13-19
    • /
    • 2015
  • Railway vehicle equipment goes back again to the state just before when failure by the repair. In repairable system, we are interested in the failure interval. As such, a statistical model of the point process, NHPP power law is often used for the reliability analysis of a repairable system. In order to derive a quantitative reliability value of repairable system, we analyze the failure data of the air brake system of the train line 7. The quantitative value is the failure intensity function that was modified, converted into a cost-rate function. Finally we studied the optimal number and optimal interval in which the costs to a minimum consumption point as cost-rate function. The minimum cost point was 194,613 (won/day) during the total life cycle of the braking system, then the optimal interval were 2,251days and the number of optimal preventive maintenance were 7 times. Additionally, we were compared to the cost of a currently fixed interval(4Y) and the optimum interval then the optimal interval is 3,853(won/day) consuming smaller. In addition, judging from the total life, "fixed interval" is smaller than 1,157 days as "optimal interval".

전동차용 접지브러쉬 편중마모에 대한 해석 (Analsis of Preponderant Wear of Earth Brush for an Electrical Multiple Units(EMUs))

  • 박병섭;구정서;김길동
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.356-361
    • /
    • 2005
  • Earth brush for electrical multiple units(EMUs) is a device through which the current of the EMU load's consumed power fed from the DC 1,500V overhead line (or from the AC 25.000V catenary) flows via axle to the rail(ground) and which prevents the electric corrosion of the axle bearings by preventing the current flow to the axle bearings caused by electric potential from the magnetic field when the bearings rotate together with the earthing function when a thunderbolt falls or a surge comes. The earth brush wear rates among cars, however, shows quite differences when the earth brushes after being separated from the holders are measured with vernier callipers every 6 months of maintenance period. Main causes of the earth brush wear are divided as mechanical, electric arc and electrical one, and the factors can be running speed, current, harmonics, connection state. spring tension, earth brush material, lubricant and so on. but only the earth brushes of the motor(M1) car show the highest wear rate and moreover maintenance difficulty occurs because of the wear rate differences among e earth brushes in one holder. The reason for these preponderant wear comes from the design concept of making preponderant current flow to some particular earth brushes and moreover the heat generated by the harmonics when the inverter starts to operate accelerate the wear. By defining these causes through experiments. I hope that the found results would be helpful for the future EMU design, safety, economy and maintenance.

  • PDF

Axle Counter System 국산화 개발을 위한 현장시험 결과분석 (A Result Analysis on Field Test for Localization Development of Axle Counter System)

  • 고준영;박재영
    • 한국산학기술학회논문지
    • /
    • 제16권9호
    • /
    • pp.6214-6220
    • /
    • 2015
  • 열차위치 검지시스템에는 일반적으로 궤도회로장치가 거의 100여년을 안정적으로 사용되어 왔으나, 일반철도 구간의 역 구내, 측선, 해안선 구간 및 열차운행 빈도가 적은 지선 구간의 건널목 등에서는 녹 발생으로 궤도회로 단락불능에 따라 해소방안이 필요하다. 국내에서는 고속철도의 차축온도검지시스템과 통신기반열차제어시스템 분기부 일부에 차축카운터시스템이 사용되고 있으나, 해외의 경우 많은 국가에서 차축카운터 시스템이 없는 간선 및 지방 철도를 상상하는 것은 이제 불가능하고 지하철, 전차, 그리고 산업철도에서 상당한 증가가 확인되었다. 본 논문에서는 일반철도 구간의 역 구내 측선의 본선 및 분기부에 시험적용을 위해 기존 설치되어 있는 궤도회로와 병렬로 설치하여 로그분석을 하여 차축카운터시스템의 동작상태를 확인하였다. 그리고 오봉기지역 및 청주역 운행선 상 설치하여 연동장치와의 인터페이스 시험 및 이를 실용화하기 위한 시험결과를 분석하고, 시스템 안전측 설계, 제작 및 시스템 요구조건 등을 정립하였다.

전문가 시스템소프트웨어 유지 보수에 있어서 프레임워크에 관한 연구 (The study on frame work of developing and modification with expert system program software)

  • Chang-Duck Jung
    • 한국컴퓨터산업학회논문지
    • /
    • 제5권4호
    • /
    • pp.503-510
    • /
    • 2004
  • 이 논문은 모듈 프로그램 안에서 전문가 시스템 소프트웨어 유지 보수에 관한 기존 논문을 분석하고 건설 라인 공정의 문제점을 표준 시스템을 적용, 전문가 시스템으로 해결하는 과정에서 전문가 시스템 소프트웨어 프로그램의 재생성 모듈을 기술하였다. 끝으로 CES(Construction Expert System)라는 프로그램 타입 시스템을 적용 검증했고 전문가 시스템 소프트웨어 프로그램을 통해 대형 건설 과정의 유지 보수에 대한 프레임을 제시하였다.

  • PDF