• Title/Summary/Keyword: On Line Maintenance

Search Result 631, Processing Time 0.031 seconds

Study on the Full-Scale Cyclic Loading Characteristics for Cement Mortar Pouring type Paved Track (시멘트모르터 충진형 포장궤도의 실물 반복재하특성에 관한 연구)

  • Lee Il-Wha;Jang Seung-Yup;Kim Eun
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.305-312
    • /
    • 2006
  • Gravel ballasted tracks are used as a basic structure for the domestic railway tracks. However, such kind of tracks has few disadvantages with service life of the structure, such as rapid deterioration of the tracks. Due to this reason, there is a need to develop low maintenance track to improve the service life of the conventional line tracks. CMP paved tacks are one of the kind of concrete tracks those were manufactured by using the prepacked concrete techniques. The purpose to develop paved tracks is to reduce the maintenance cost. The most important controlling factors to design the paved tracks are surrounding environmental condition and repeated train loading. In this study, in order to investigate the deformation characteristics such as displacement, earth pressure, strain ratio, and crack along the repeated loading cycle, cyclic loading test through real scale model was carried out.

Damage Assessment of RC Bridge Using Neural-Fuzzy System (퍼지신경망을 이용한 철근콘크리트 교량의 손상도 평가)

  • Seong, Young-Joon;Kim, Ki- Bong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.3 no.4
    • /
    • pp.129-137
    • /
    • 1999
  • Assessment of structural damage is a complex subject imbued with uncertainty and vagueness. This complexity arises from the use of subjective opinion and imprecise numerical data. Recently several active researches have been performed using new methods such as neural network approach or on-line damage detection. In this paper, Damage assessment (diagnosis) of the concrete bridges is studied by a new approach utilizing a neural fuzzy system that combined a neural network and a fuzzy logic. By applying this system to actual in-service bridges, it has been verified that the neural fuzzy method is effective for the bridge diagnosis.

  • PDF

A Study On the Development of Facility Management Performance Evaluation system by Analyzing Current FM Practices of Commercial Office Buildings (Commercial Office의 Facility Management(FM) 업무 현황 분석을 통한 성과 평가체계 구축 방안)

  • Yoon, Jong-Han;Cha, Hee-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.89-90
    • /
    • 2016
  • Despite the rise of importance of Facility Management(FM), relatively little attention was paid to evaluate FM efficiency and drive for greater FM efficiency. The purpose of the present paper is to offer a quantitative analysis of 14 Key Success Factors(KSF) and 22 detailed maintenance practices in order to develop FM evaluation system. In addition, from survey with Owner/Property Manager group and Facility Manager group, the present paper measures both importance of detailed maintenance practices and performance satisfaction. It is expected that by using the result of this survey, this paper helps increase efficiency in FM. Moreover, It is expected that this paper will be used as base line data in developing FM practice evaluation system.

  • PDF

Evaluation on Effectiveness of Rail Grinding by Prediction of Rail Fatigue Life (레일 피로수명 예측에 따른 레일 연마의 효용성 평가)

  • Kim, Man-Cheol
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.255-261
    • /
    • 2008
  • The importance of maintenance of rail surface defects is increasing according to the KTX operation. That is because during high speed operation of rolling stocks, rail surface defects shorten fatigue life of rail, accelerate track degradation and deteriorate ride comfort. Rail grinding has been applied for effective rail maintenance in Kyeong-Bu HS line. This paper evaluates the effectiveness of rail grinding in term of rail fatigue life. To this end, the stresses of the ground rail are measured under KTX running and the equivalent stress range is calculated by RMC after the frequency analysis done with Rainflow counting method. Also, Pamglen-Miner rule is applied to predict the fatigue life of ground rail. The result of the analysis shows that the fatigue life of ground rail is increased by 15%.

  • PDF

Field Reliability Analysis of S-Bond of AF Track Circuit for Automatic Train Control System (자동열차제어장치 AF궤도회로 S-BOND의 사용신뢰도 분석)

  • Choi, Kyu-Hyoung;Rho, Young-Whan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.2
    • /
    • pp.308-313
    • /
    • 2009
  • This paper presents a reliability analysis of S-bonds for AF track circuits, which detect train movement and transmit a speed control signal to the train. Field survey shows that S-bonds are exposed to very large vibrations transferred from rail, and suffer from frequent failures when they were installed on ballasted track. We collected the time-to-failure data of S-bonds from the maintenance field of Seoul metro line 2, and made a parametric approach to estimate the statistical distribution that fits the time-to-failure data. The analysis shows that S-bonds have time-to-failure characteristics described by Weibull distribution. The estimated shape parameter of Weibull distribution is 1.1, which means the distribution has constant failure rate characteristics like exponential distribution. The reliability function, hazard function, percentiles and mean lifetime are derived for maintenance support.

A Study on Cantilever Deformation Inspection Method Using Image Processing (영상처리를 이용한 가동브래킷 변형 검사 기법에 대한 연구)

  • Han, Seung-Hun;Cho, Min-Soo;Yu, Young-Ki;Lee, Byeong-Gon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.6
    • /
    • pp.988-994
    • /
    • 2017
  • The risk of facilities in catenary is increasing because the railway section extension and high-speed train service. And visual check of workforce is not enough time to maintain the extensive railway facilities. Accordingly, The technical development trend of maintenance of railway facilities can be seen by automation and application of IT technology, especially the mechanization work and the information technology are spreading in the maintenance work of the train line solved by manpower. In this paper, we describe the method by obtaining the cantilever image using acquisition device and pole inspection system in high speed vehicle, to check the variation of the cantilever component using image processing.

A Result Analysis on Field Test for Localization Development of Axle Counter System (Axle Counter System 국산화 개발을 위한 현장시험 결과분석)

  • Ko, Joon-Young;Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6214-6220
    • /
    • 2015
  • A track circuit has used stably more than 100 years for detecting train position, but solution of track circuit sort circuit incapacity due to a rust is necessary for side line in station yard, coast line and level crossing for conventional line in rural line. Domestically, Axle Counter System(ACS) has partially used for Hot Box System for high speed line and turnout for CBTC system. In contrast, most of countries has used ACS not only trunk line but also rural line and its application has increased for metro, electric car and industrial railway. In this paper, we has verified the operating status of ACS which installed with existing track circuit through log analsis to implement pilot application in mail track and turnout in station yard. And interface test with interlocking system has conducted at Obong shunting yard, as well as Cheongju station and has analyzed test result. Based on a test result, we made fail safe design, manufacturing skill and established system requirement specification for the smooth operation and maintenance.

A Study on the Maintenance Policy Considering the Failure Data of the EMU Braking System and the Cost Function (전동차 제동장치의 고장데이터와 비용함수를 고려한 유지보수 정책에 관한 연구)

  • Han, Jae-Hyun;Kim, Jong-Woon;Koo, Jeong-Seo
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.3
    • /
    • pp.13-19
    • /
    • 2015
  • Railway vehicle equipment goes back again to the state just before when failure by the repair. In repairable system, we are interested in the failure interval. As such, a statistical model of the point process, NHPP power law is often used for the reliability analysis of a repairable system. In order to derive a quantitative reliability value of repairable system, we analyze the failure data of the air brake system of the train line 7. The quantitative value is the failure intensity function that was modified, converted into a cost-rate function. Finally we studied the optimal number and optimal interval in which the costs to a minimum consumption point as cost-rate function. The minimum cost point was 194,613 (won/day) during the total life cycle of the braking system, then the optimal interval were 2,251days and the number of optimal preventive maintenance were 7 times. Additionally, we were compared to the cost of a currently fixed interval(4Y) and the optimum interval then the optimal interval is 3,853(won/day) consuming smaller. In addition, judging from the total life, "fixed interval" is smaller than 1,157 days as "optimal interval".

Analsis of Preponderant Wear of Earth Brush for an Electrical Multiple Units(EMUs) (전동차용 접지브러쉬 편중마모에 대한 해석)

  • Park, Byung-Sup;Ku, Jung-Su;Kim, Gil-Dong
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.356-361
    • /
    • 2005
  • Earth brush for electrical multiple units(EMUs) is a device through which the current of the EMU load's consumed power fed from the DC 1,500V overhead line (or from the AC 25.000V catenary) flows via axle to the rail(ground) and which prevents the electric corrosion of the axle bearings by preventing the current flow to the axle bearings caused by electric potential from the magnetic field when the bearings rotate together with the earthing function when a thunderbolt falls or a surge comes. The earth brush wear rates among cars, however, shows quite differences when the earth brushes after being separated from the holders are measured with vernier callipers every 6 months of maintenance period. Main causes of the earth brush wear are divided as mechanical, electric arc and electrical one, and the factors can be running speed, current, harmonics, connection state. spring tension, earth brush material, lubricant and so on. but only the earth brushes of the motor(M1) car show the highest wear rate and moreover maintenance difficulty occurs because of the wear rate differences among e earth brushes in one holder. The reason for these preponderant wear comes from the design concept of making preponderant current flow to some particular earth brushes and moreover the heat generated by the harmonics when the inverter starts to operate accelerate the wear. By defining these causes through experiments. I hope that the found results would be helpful for the future EMU design, safety, economy and maintenance.

  • PDF

The study on frame work of developing and modification with expert system program software (전문가 시스템소프트웨어 유지 보수에 있어서 프레임워크에 관한 연구)

  • Chang-Duck Jung
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.4
    • /
    • pp.503-510
    • /
    • 2004
  • The summary of this paper is as follows. The literature on existing expert system maintenance software technique are reviewed in Module program, a case of assembly line process problem at construction industry and planning expert system to solve this problem at construction as a standard configured process system are discussed. the regenerative expert system approach for the construction process expert system and its example for the assembly line construction process appear in the research also, this paper shows the architecture and some feature of the CES.(Construction Expert System), which is a prototype implemented for the regenerative expert system approach. the paper introduce the framework of the regenerative expert approach as a general framework of developing and maintaining a large-scale expert systems.

  • PDF