• Title/Summary/Keyword: Offshore wind power system

Search Result 140, Processing Time 0.031 seconds

DC-link Voltage Control of HVDC for Offshore Wind Farm using Improved De-loading Method (개선된 De-loading기법을 이용한 해상풍력 연계용 HVDC의 DC 전압의 제어방안)

  • Huh, Jae-Sun;Moon, Won-Sik;Park, Sang-In;Kim, Doo-Hee;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.399-404
    • /
    • 2015
  • This paper presents the DC voltage control method in DC link of High Voltage Direct Current(HVDC) for an offshore wind farm in Low Voltage Ride Through(LVRT) situation. Wind generators in an offshore wind farm are connected to onshore network via HVDC transmission. Due to LVRT control of grid side inverter in HVDC, power imbalancing in DC link is generated and this consequentially causes rising of DC voltage. A de-loading scheme is one of the method to protect the wind power system DC link capacitors from over voltage. But the flaw of this method is slow control response time and that it needs long recovery time to pre-fault condition after fault clear. Thus, this paper proposes improved de-loading method and we analyze control performance for DC voltage in LVRT control of HVDC for an offshore wind farm.

DC Voltage Build-Up Suppression Scheme of HVDC System for Offshore Wind Farm Connection using Chopper Resistor and de-loading (초퍼저항 및 de-loading 협조제어를 통한 해상풍력 연계용 HVDC시스템 DC전압 상승 억제 방안)

  • Lee, Hyeong-Jin;Kang, Byoung-Wook;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.5
    • /
    • pp.750-756
    • /
    • 2017
  • This paper presents a method for DC voltage control of HVDC system connection of offshore wind farms. In the event of fault in AC grid, HVDC system need to meet LVRT regulations. When HVDC system meet LVRT regulation, unbalance is caused between power input and power output for DC link. Therefore, LVRT regulation lead to DC voltage increase of HVDC system. To control the DC voltage increase, the chopper resistor can be suggested. In this paper, DC voltage suppression is proposed using chopper resistor and de-loading. The effectiveness of the chopper resistor was verified using PSCAD/EMTDC.

Comparative study on the structural behavior of a transition piece for offshore wind turbine with jacket support

  • Ma, Chuan;Zi, Goangseup
    • Steel and Composite Structures
    • /
    • v.43 no.3
    • /
    • pp.363-373
    • /
    • 2022
  • As a key reinforcement connection between a tower and a substructure in offshore wind turbine system, the transition piece is inevitably subjected to cyclic dynamic environmental loads such as wind, current and wave. Therefore, well designed transition piece with high strength and good fatigue resistance is of great significance to the structural safety and reliability of offshore wind power systems. In this study, the structural behavior of the transition piece was studied by an extensive sets of finite element analyses. Three widely used types of transition piece were considered. The characteristics of stress development, fatigue life and weight depending on the type of the transition piece were investigated in the ultimate limit state (ULS) and the fatigue limit state (FLS) of a 5-MW offshore wind turbine to be placed in Korea. An optimal form of the transition piece was proposed based on this parametric study.

Development Status of 3MW Class Offshore Wind Turbine (3MW급 해상 풍력발전시스템 개발현황)

  • Joo, Wan-Don;Park, Jeung-Hun;Choi, June-Hyug;Lim, Chae-Wook;Park, Jong-Po
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.366-369
    • /
    • 2007
  • This paper presents the general results of the conceptual design of a 3MW class offshore wind turbine named WinDS 3000 under development. In WinDS 3000, an integrated drive train design, three stage gearbox and permanent magnet generator (PMG) with fully rated converters have been introduced. A pitch regulated variable speed power control with individual pitch control has been adopted to regulate rotor torque while generator reaction torque can be adjusted almost instantaneously by the associated power electronics. Through the introduction of WinDS 3000, it is expected that helpful to understanding of the development status of 3MW offshore wind turbine.

  • PDF

A Simple Ensemble Prediction System for Wind Power Forecasting - Evaluation by Typhoon Bolaven Case - (풍력예보를 위한 단순 앙상블예측시스템 - 태풍 볼라벤 사례를 통한 평가 -)

  • Kim, Jin-Young;Kim, Hyun-Goo;Kang, Yong-Heack;Yun, Chang-Yeol;Kim, Ji-Young;Lee, Jun-Shin
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.1
    • /
    • pp.27-37
    • /
    • 2016
  • A simple but practical Ensemble Prediction System(EPS) for wind power forecasting was developed and evaluated using the measurement of the offshore meteorological tower, HeMOSU-1(Herald of Meteorological and Oceanographic Special Unite-1) installed at the Southwest Offshore in South Korea. The EPS developed by the Korea Institute of Energy Research is based on a simple ensemble mean of two Numerical Weather Prediction(NWP) models, WRF-NMM and WRF-ARW. In addition, the Kalman Filter is applied for real-time quality improvement of wind ensembles. All forecasts with EPS were analyzed in comparison with the HeMOSU-1 measurements at 97 m above sea level during Typhoon Bolaven episode in August 2012. The results indicate that EPS was in the best agreement with the in-situ measurement regarding (peak) wind speed and cut-out speed incidence. The RMSE of wind speed was 1.44 m/s while the incidence time lag of cut-out wind speed was 0 hour, which means that the EPS properly predicted a development and its movement. The duration of cut-out wind speed period by the EPS was also acceptable. This study is anticipated to provide a useful quantitative guide and information for a large-scale offshore wind farm operation in the decision making of wind turbine control especially during a typhoon episode.

Application of InVEST Offshore Wind Model for Evaluation of Offshore Wind Energy Resources in Jeju Island (제주도 해상풍력 에너지 자원평가를 위한 InVEST Offshore Wind 모형 적용)

  • KIM, Tae-Yun;JANG, Seon-Ju;KIM, Choong-Ki
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.2
    • /
    • pp.47-59
    • /
    • 2017
  • This study aims to assess offshore wind energy resources around Jeju Island using the InVEST Offshore Wind model. First the wind power density around the coast of Jeju was calculated using reanalysis data from the Korean Local Analysis and Prediction System (KLAPS). Next, the net present value (NPV) for the 168MW offshore wind farm scenario was evaluated taking into consideration factors like costs (turbine development, submarine cable installation, maintenance), turbine operation efficiency, and a 20year operation period. It was determined that there are high wind resources along both the western and eastern coasts of Jeju Island, with high wind power densities of $400W/m^2$ calculated. To visually evaluate the NPV around Jeju Island, a classification of five grades was employed, and results showed that the western sea area has a high NPV, with wind power resources over $400W/m^2$. The InVEST Offshore Wind model can quickly provide optimal spatial information for various wind farm scenarios. The InVEST model can be used in combination with results of marine ecosystem service evaluation to design an efficient marine spatial plan around Jeju Island.

Experimental Study on an Underwater Pole Climb Robot for the Maintenance of Offshore Wind Turbine Substructures (해상풍력발전 지지구조물의 유지보수용 수중 기둥등반로봇에 관한 실험적 연구)

  • Im, Eun Cheol;Ko, Jin Hwan
    • The Journal of Korea Robotics Society
    • /
    • v.17 no.2
    • /
    • pp.238-244
    • /
    • 2022
  • Maintenance works of offshore wind turbines could take a longer time, which causes the reduction of their energy production efficiency, than those of onshore wind turbines owing to severe offshore environment. Subsequently, preventive maintenance measures are required to increase the production efficiency. Thus, we proposed a wheel-based Underwater Pole Climbing Robot (UPCR) platform, which was aimed at the periodic inspection and maintenance of the substructures of the offshore wind turbines, with three advantages: high speed, good mobility and low power consumption. In the proposed platform, a self-locking system using a gripper module was adopted for preventing slippery problem and a dual configuration was chosen for moving on a branched structure. As a result, the proposed robot was able to continuously climb, preserve it's position at the pole without consuming energy, and move from the pole to the other branched pole. The results of this research show that the UPCR has basic moving capabilities required for the underwater work for the substructures of the offshore wind turbines.

Selecting the Geographical Optimal Safety Site for Offshore Wind Farms to Reduce the Risk of Coastal Disasters in the Southwest Coast of South Korea (국내 서남해권 연안재해 리스크 저감을 위한 지리적 해상풍력단지 최적 입지 안전구역 선정 연구)

  • Kim, Jun-Gho;Ryu, Geon-Hwa;Kim, Young-Gon;Kim, Sang-Man;Moon, Chae-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.5
    • /
    • pp.1003-1012
    • /
    • 2022
  • The horizontal force transfer to the turbine and substructure of a wind power generation system is a very important factor in maintaining the safety of the system, but it is inevitably vulnerable to large-scale coastal disasters such as earthquakes and typhoons. Wind power generation systems built on the coast or far offshore are very disadvantageous in terms of economic feasibility due to an increase in initial investment cost because a more robust design is required when installed in areas vulnerable to coastal disasters. In this study, the GIS method was used to select the optimal site for a wind farm from the viewpoint of reducing the risk of coastal disasters. The current status of earthquakes in the West and South Seas of Korea, and the path and intensity of typhoons affecting or passing through the West and South Seas were also analyzed. Accordingly, the optimal offshore wind farm site with the lowest risk of coastal disasters has been selected and will be used as basic research data for offshore wind power projects in the region in the future.

Advanced Tools for Modeling, Design and Optimization of Wind Turbine Systems

  • Iov Florin;Hansen Anca Daniela;Jauch Clemens;Sorensen Poul;Blaabjerg Frede
    • Journal of Power Electronics
    • /
    • v.5 no.2
    • /
    • pp.83-98
    • /
    • 2005
  • As wind turbine technology and control has advanced over the last decade, this has led to a high penetration of wind turbines into the power system. Whether it be for a large wind turbine or an offshore wind farm with hundreds of MW power capacity, the electrical system has become more and more important in controlling the interaction between the mechanical system of the wind turbine and the main power system. The presence of power electronics in wind turbines improves their controllability with respect not only to its mechanical loads but also to its power quality. This paper presents an overview of a developed simulation platform for the modeling, design and optimization of wind turbines. The ability to simulate the dynamic behavior of wind turbines and the wind turbine grid interaction using four simulation tools (Matlab, Saber, DIgSILENT and HAWC) is investigated, improved and extended.

Automatic Command Mode Transition Strategy of Direct Power Control for PMSG MV Offshore Wind Turbines (자동 지령모드절환 기능을 갖춘 PMSG MV 해상 풍력 발전기의 직접전력제어 방법)

  • Kwon, Gookmin;Suh, Yongsug
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.21 no.3
    • /
    • pp.238-248
    • /
    • 2016
  • In this study, an automatic command mode transition strategy of direct power control (DPC) is proposed for permanent magnet synchronous generators (PMSGs) medium-voltage (MV) offshore wind turbines (WTs). Benchmarking against the control methods are performed based on a three-level neutral-point-clamped (NPC) back-to-back type voltage source converter (VSC). The ramping rate criterion of complex power is utilized to select the switching vector in DPC for a three-level NPC converter. With a grid command and an MPPT mode transition strategy, the proposed control method automatically controls the generated output power to satisfy a grid requirement from the hierarchical wind farm controller. The automatic command mode transition strategy of DPC is confirmed through PLECS simulations based on Matlab. The simulation result of the automatic mode transition strategy shows that the proposed control method of VOC and DPC achieves a much shorter transient time of generated output power than the conventional control methods of MPPT and VOC under a step response. The proposed control method helps provide a good dynamic performance for PMSGs MV offshore WTs, thereby generating high quality output power.