• Title/Summary/Keyword: Offshore wind power generation

Search Result 93, Processing Time 0.026 seconds

Measurement and Analysis of Wind Energy Potential in Kokunsando of Saemankeum (새만금 고군산군도의 풍자원 측정 및 분석)

  • Shim, Ae-Ri;Choi, Yeon-Sung;Lee, Jang-Ho
    • New & Renewable Energy
    • /
    • v.7 no.2
    • /
    • pp.51-58
    • /
    • 2011
  • Saemankeum is well known for its high speed wind, and it is known that the blueprint of a future city around Saemankeum, including new industrial complex, has been planned. As a result, large-scale offshore wind farm, on the basis of the measurement of wind resource for a long time, can be considered, so that generated electricity can be used to meet the energy demand near the wind farm. Wind speed in Kokunsando of Saemankeum is measured and analyzed with its statistical distribution and wind directions. The probability of wind power resource over Kokunsando of Saemangeum is reviewed with the measured data in one island of Kokunsando. According to measured data, the shape and scale factor of Weibull distribution of wind speed are obtained, and then power density is analyzed as well. Through this study, it is clear that the Saemangeum area has a fluent and abundant wind power source to develop the wind farm in Korea.

Effect Analysis of Offshore Wind Farms on VHF band Communications (VHF 대역 통신에 대한 해상풍력 발전단지의 영향성 분석)

  • Oh, Seongwon;Park, Taeyong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.2
    • /
    • pp.307-313
    • /
    • 2022
  • As the development of renewable energy expands internationally to cope with global warming and climate change, the share of wind power generation has been gradually increasing. Although wind farms can produce electric power for 24 h a day compared to solar power plants, Their interfere with the operation of nearby radars or communication equipment must be analyzed because large-scale wind power turbines are installed. This study analyzed whether a land radio station can receive sufficient signals when a ship sailing outside the offshore wind farm transmits distress signals on the VHF band. Based on the geographic information system digital map around the target area, wind turbine CAD model, and wind farm layout, the area of interest and wind farm were modeled to enable numerical analysis. Among the high frequency analysis techniques suitable for radio wave analysis in a wide area, a dedicated program applying physical optics (PO) and shooting and bouncing ray (SBR) techniques were used. Consequently, the land radio station could receive the electromagnetic field above the threshold of the VHF receiver when a ship outside the offshore wind farm transmitted a distress communication signal. When the line of sight between the ships and the land station are completely blocked, the strength of the received field decreases, but it is still above the threshold. Hence, although a wind farm is a huge complex, a land station can receive the electromagnetic field from the ship's VHF transmitter because the wave length of the VHF band is sufficiently long to have effects such as diffraction or reflection.

Topology Optimization Application for Initial Platform Design of 10 MW Grade Floating Type Wave-wind Hybrid Power Generation System (10MW급 부유식 파력-풍력 복합발전 시스템 플랫폼 초기설계를 위한 위상최적화 응용)

  • Song, Chang Yong;Lee, Kangsu;Hong, Keyyong
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.19 no.3
    • /
    • pp.194-202
    • /
    • 2016
  • This study aims to review a topology optimization based on finite element analysis (FEA) for conceptual design of platform in the 10MW class floating type wave-wind hybrid power generation system (WHPGS). Two topology optimization theories, density method (DM) and homogenization design method (HDM) were used to check which one is more effective for a simplified structural design problem prior to the topology optimization of platform of WHPGS. From the results of the simplified design problem, the HDM was applied to the topology optimization of platform of WHPGS. For the conceptual platform design of WHPGS, FEA model was created and then the structural analysis was performed considering offshore environmental loads at installation site. Hydrodynamics analysis was carried out to calculate pressure on platform and tension forces in mooring lines induced from the offshore environmental loads such as design wave and current. Loading conditions for the structural analysis included the analysis results from the hydrodynamic analysis and the weights of WHPGS. Boundary condition was realized using inertia relief method. The topology optimization of WHPGS platform was performed using the HDM, and then the conceptual arrangement of main structural members was suggested. From the results, it was confirmed that the topology optimization might be a useful tool to design the conceptual arrangement of main structural members for a newly developed offshore structure such as the floating type WHPGS.

Vertical axis wind turbine types, efficiencies, and structural stability - A Review

  • Rehman, Shafiqur;Rafique, Muhammad M.;Alam, Md. Mahbub;Alhems, Luai M.
    • Wind and Structures
    • /
    • v.29 no.1
    • /
    • pp.15-32
    • /
    • 2019
  • Much advancement has been made in wind power due to modern technological developments. The wind energy technology is the world's fastest-growing energy option. More power can be generated from wind energy by the use of new design and techniques of wind energy machines. The geographical areas with suitable wind speed are more favorable and preferred for wind power deployment over other sources of energy generation. Today's wind turbines are mainly the horizontal axis wind turbines (HAWTs) and vertical axis wind turbines (VAWTs). HAWTs are commercially available in various sizes starting from a few kilowatts to multi-megawatts and are suitable for almost all applications, including both onshore and offshore deployment. On the other hand, VAWTs finds their places in small and residential wind applications. The objective of the present work is to review the technological development, available sizes, efficiencies, structural types, and structural stability of VAWTs. Structural stability and efficiencies of the VAWTS are found to be dependent on the structural shape and size.

An Experimental Study on Dynamic Performance of Large Floating Wave-Offshore Hybrid Power Generation Platform in Extreme Conditions (대형 부유식 파력-해상풍력 복합발전 구조물의 극한환경 운동 성능에 대한 실험적 연구)

  • Kim, Kyong Hwan;Hong, Jang Pyo;Park, Sewan;Lee, Kangsu;Hong, Keyyong
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.19 no.1
    • /
    • pp.7-17
    • /
    • 2016
  • The present study experimentally considers dynamic performance of large floating wave-offshore hybrid power generation platform in extreme conditions. In order to evaluate the motion performance of the large floating hybrid power generation platform, 1/50 scaled model was manufactured. A mooring line was also manufactured, and free-decay and static pull-out tests were carried out to check the mooring model. A mooring line table was introduced to satisfy the water depth, and environmental conditions were checked. Motion responses in regular waves were measured and complicated environmental conditions including wave, wind, and current were applied to see the dynamic performance in extreme/survival conditions. Maximum motion and acceleration were judged following the design criteria, and maximum offset and mooring tension were also checked based on the rule. The characteristics of hybrid power generation platform are discussed based on these data.

Optimal Layout Design of Offshore Wind Turbines by Response Surface Analysis (반응표면분석법에 의한 해상풍력터빈 최적배치 설계)

  • Kim, Ji-Young;Kim, Kyoung-Yul;Lee, Jun-Shin
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.2
    • /
    • pp.163-170
    • /
    • 2011
  • An optimal layout condition of the offshore wind turbines is studied by using the response surface analysis which is a kind of the design of experiments. Based on the assumption that total 36 turbines would be installed in the offshore wind farm, the number and distance of the rows and columns are used as the design variables and the efficiency decrease of power generation due to the wake decay by the interactions of turbines and the installation cost of the internal electric grid are considered as the objective functions of the response surface analysis for the layout design of turbines. Useful design information can be derived by analyzing the relationship between the design variables and target functions. It is found that the row number and the distance between rows should be minimized, and the optimal distance between columns should be estimated and adopted to the layout design within the specified design range in order to ensure the economics for the offshore wind farm.

A Study of Energy Production Change according to Atmospheric Stability and Equivalent Wind Speed in the Offshore Wind Farm using CFD Program (CFD를 이용한 등가풍속 산정과 대기안정도에 따른 연안풍력단지 발전량 변화 연구)

  • Ryu, Geon-Hwa;Kim, Dong-Hyeok;Lee, Hwa-Woon;Park, Soon-Young;Kim, Hyun-Goo
    • Journal of Environmental Science International
    • /
    • v.25 no.2
    • /
    • pp.247-257
    • /
    • 2016
  • To predict annual energy production (AEP) accurately in the wind farm where located in Seongsan, Jeju Island, Equivalent wind speed (EQ) which can consider vertical wind shear well than Hub height wind speed (HB) is calculated. AEP is produced by CFD model WindSim from National wind resource map. EQ shows a tendency to be underestimated about 2.7% (0.21 m/s) than HB. The difference becomes to be large at nighttime when wind shear is large. EQ can be also affected by atmospheric stability so that is classified by wind shear exponent (${\alpha}$). AEP is increased by 11% when atmosphere becomes to be stabilized (${\alpha}$ > 0.2) than it is convective (${\alpha}$ < 0.1). However, it is found that extreme wind shear (${\alpha}$ > 0.3) is hazardous for power generation. This results represent that AEP calculated by EQ can provide improved accuracy to short-term wind power forecast and wind resource assessment.

Optimal arrangement of multiple wind turbines on an offshore wind-wave floating platform for reducing wake effects and maximizing annual energy production (다수 풍력터빈의 후류영향 최소화 및 연간발전량 극대화를 위한 부유식 파력-해상풍력 플랫폼 최적배치)

  • Kim, Jong-Hwa;Jung, Ji-Hyun;Kim, Bum-Suk
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.3
    • /
    • pp.209-215
    • /
    • 2017
  • A large floating offshore wind-wave hybrid power generation system with an area of 150 m2 and four 3 MW class wind turbine generators was installed at each column top. In accordance with the wind turbine arrangement, the wake generated from upstream turbines can adversely affect the power performance and load characteristics of downstream turbines. Therefore, an optimal arrangement design, obtained through a detailed flow analysis focusing on wake interference, is necessary. In this study, to determine the power characteristics and annual energy production (AEP) of individual wind turbines, transient computational fluid dynamics, considering wind velocity variation (8 m/s, 11.7 m/s, 19 m/s, and 25 m/s), was conducted under different platform conditions ($0^{\circ}$, $22.5^{\circ}$, and $45^{\circ}$). The AEP was calculated using a Rayleigh distribution, depending on the wind turbine arrangement. In addition, we suggested an optimal arrangement design to minimize wake losses, based on the AEP.

Assessment of Wind Energy Potential around Jeju Coastal Area (제주 연안지역 주변의 잠재 풍력에너지 평가)

  • Kim, Nam Hyeong;Jin, Jung Woon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6B
    • /
    • pp.617-625
    • /
    • 2010
  • The selection of a site where strong wind blows is important to increase effectively the electricity of wind power in proportion to the cube of the wind speed. It is advisable to establish the wind turbine in the coastal area with strong wind speed rather than in the inland. And the development of offshore wind energy is expected to solve the noise problem that is one of the important weaknesses in the wind turbine. In the process of the development business of wind energy, knowing forehead the wind power possibility in any area is one of the essential factors to choose the most optimum site of wind power. In this paper, the potential of wind power around JeJu coastal area is examined by using the wind data that Korea Meteorological Administration has surveyed for 10 years in 14 observation points. Wind speed data is revised to wind speed in 80 meters assuming installation height of the wind turbine, and wind power density and annual wind energy are also calculated. And annual electricity generation and percent of energy efficiency in all the observation points are estimated by using the information about 3,000 KW wind turbine.