• Title/Summary/Keyword: Offshore plant

Search Result 405, Processing Time 0.025 seconds

Marine Survey for Designing and Installing Offshore Oil-Gas Plant (오일-가스 해양플랜트 설계 및 설치를 위한 해양탐사)

  • Kim, Wonsik;Woo, Nam-Sub;Park, Jongmyung;Kim, Hyundo;Kang, Dong-Hyo;Park, In-Seok;Kim, Young-Jun;Joo, Yonghwan;Lee, Ho-Young
    • Geophysics and Geophysical Exploration
    • /
    • v.17 no.1
    • /
    • pp.34-44
    • /
    • 2014
  • Because offshore plant industry needs to design, deploy and operate much of equipment especially, the latest trend shows the installation of production facilities is augmented in the subsea. The installed facilities are very difficult to be repaired or changed because they are located in the subsea. For solving these problems, both the directly related information of the production like the optimal number, position and depth of wells and the distribution for effective operation and safety of equipment of subsea should be considered at the preliminary stage of FEED (Front End Engineering Design). The marine exploration is introduced in this paper for providing the fundamental technology to answer the questions related to above considering points. First, some kinds of the offshore plant facilities are enumerated and aims of marine exploration for the offshore oil/gas development are summarized. In addition to it, the main roles of marine survey, in the step of designing and installing offshore oil-gas plant, development are briefly listed. And then foreign examples are shown to help the reader's understand. This paper is hoped to be helpful for understanding the marine exploration that can be applied to offshore oil/gas plant and to be contributed to developing the domestic techniques in this field for the future.

A proposal of marine geophysical exploration techniques for offshore plant installation (해양플랜트 설치를 위한 해양물리탐사 기법 제안)

  • Ha, Ji-Ho;Ko, Hwi-Kyung;Cho, Hyen-Suk;Chung, Woo-Keen;Ahn, Dang;Shin, Sung-Ryul
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.37 no.2
    • /
    • pp.242-251
    • /
    • 2013
  • Recently, while global concern over offshore resources exploration and development is being increased rapidly, offshore plant industry is highlighted as an industry of high added value. Along with this global trend, domestic concern over offshore plant development is being increased as well. In the overseas case, a marine geotechnical survey guideline for confirming characteristics of seabed sediments is available at the time of installation of offshore plant but such guideline is not available in our country. In this study, survey techniques fit for domestic marine environment was applied according to overseas guideline at southern coastal area, Korea. Among the marine geophysical survey techniques being proposed abroad, magnetic survey and seabed photograph were excluded. However, highly reliable data analysis was enabled for marine geophysical survey, which includes in-situ coring investigation and laboratory soil test. In addition, continuous ocean current survey was included to find scour potential due to the current around the offshore plant. Although coring depth is not so deep, we predicted geological structure through the analysis of amplitude features of seismic data. Characteristics of seabed sediments cold be obtained regionally and directly through combined analysis of marine geophysical survey data and coring data.

Experimental Quality Characteristics for Water Removal in Inner Flushing Oil in Process Piping of Offshore Plant (해양플랜트 프로세스 배관 내경 플러싱 오일속에서 수분제거를 위한 실험적 품질 특성)

  • Park, Chang-Soo;Sung, Ki-Young;Han, Seong Jong
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.6
    • /
    • pp.797-805
    • /
    • 2019
  • An important problem of offshore plant process piping is equipment accidents due to the removal of fine metal debris and foreign substances in the pipes that deliver fluids such as hydraulic oil, lubricating oil and thermal oil. Temporary flushing equipment to remove debris uses fluid equipment of centrifugal pump and gear pump to prevent equipment accident of offshore platform. The equipment manufacturer requires the shipyard to have a cleanliness rating inside the pipe to meet the international standards ISO4406 and NAS1638 quality levels to prevent damage to the equipment sold. The quality of the internal flushing of pipes conforms to the regulations suggested by the equipment manufacturer. In this paper, three types of electric heater capacity, which is a method of evaporating and removing water inside a pipe during an oil flushing process, were compared. In addition, the study was conducted to remove the flushing oil in the pipe and to improve oil quality.

A Study on the Legal Review of Safety Operation for Offshore Supply Vessel (해양플랜트 지원선박의 안전운항을 위한 법률 검토)

  • Jin, Ho-Hyun;Lee, Chang-Hee
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.1
    • /
    • pp.133-144
    • /
    • 2015
  • Recently, Korea shipping companies have been internally/externally difficult to manage their fleet due to the high price of bunker, wage and low cost of charterage and freight. To solve these problems, some shipping companies have tried to set up a new business regarding offshore plant supply vessel(OSV). Owing to the absence of big oil field near the Korea coast, OSV market has not been gradually progressing as far. This study intends to review the legal review of both international and municipal law for the OSV. Therefore I have provided basic legal information to the domestic shipping companies which have desired to enter the OSV's market and suggest legal revision harmoniously to identify the problem in the municipal law.

Numerical Computations of Extreme Wave Load on a Cylinder Using Frequency-Focusing unidirectional waves

  • Kyoung, Jo-Hyun;Hong, Sa-Young;Sung, Hong-Gun
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.135-140
    • /
    • 2006
  • Numerical computations are made to predict wave loads on a vertical cylinder in an extreme wave. To generate the extreme wave, a frequency-focused unidirectional wave is adopted in three-dimensional numerical wave tank. The mathematical formulation is wide in the scope of the potential theory with fully nonlinear free surface conditions. As a numerical method, finite element method based on variational principle is applied. Comparisons between the present numerical results and the previous computation data. show a good agreement.

  • PDF

Ice Load Generation in Time Domain Based on Ice Load Spectrum for Arctic Offshore Structures (극지해양구조물 성능평가를 위한 스펙트럼 기반 시간역 빙하중 생성에 관한 연구)

  • Kim, Young-Shik;Kim, Jin-Ha;Kang, Kuk-Jin;Han, Solyoung;Kim, Jinwhan
    • Journal of Ocean Engineering and Technology
    • /
    • v.32 no.6
    • /
    • pp.411-418
    • /
    • 2018
  • This paper introduces a new method of ice load generation in the time domain for the station-keeping performance evaluation of Arctic offshore structures. This method is based on the ice load spectrum and mean ice load. Recently, there has been increasing interest in Arctic offshore technology for the exploration and exploitation of the Arctic region because of the better accessibility to the Arctic ocean provided by the global warming effect. It is essential to consider the ice load during the development of an Arctic offshore structure. In particular, when designing a station-keeping system for an Arctic offshore structure, a consideration of the ice load acting on the vessel in the time domain is essential to ensure its safety and security. Several methods have been developed to consider the ice load in the time domain. However, most of the developed methods are computationally heavy because they consider every ice floe in the sea ice field to calculate the ice load acting on the vessel. In this study, a new approach to generate the ice load in the time domain with computational efficiency was suggested, and its feasibility was examined. The ice load spectrum and mean ice load were acquired from a numerical analysis with GPU-event mechanics (GEM) software, and the ice load with the varying heading of a vessel was reconstructed to show the feasibility of the proposed method.

A Study on Fault Prediction Method in a Pump Tower of LNG FPSO (LNG FPSO 펌프타워 고장 예지 방안에 관한 연구)

  • Kim, Yongjae;Cho, SangJe;Jun, Hong-Bae;Ha, Chunghun;Shin, Jongho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.2
    • /
    • pp.111-121
    • /
    • 2016
  • The plant equipment usually has a long life cycle. During its O&M (Operation & Maintenance) phase, since the occurrence of an accident of offshore plant equipment causes catastrophic damage, it is necessary to make more efforts for managing critical offshore equipment. Nowadays due to the emerging ICTs (Information Communication Technologies) and sensor technologies, it is possible to gather the health status data of important offshore equipment and their environment data, which leads to much concern on CBM (Condition-Based Maintenance). In this study, we will propose an approach to estimate the remaining lifetime of an offshore plant equipment (pump tower) based on gathered ocean environment data.

A Study on Interior Space Planning of Accommodation Barge for Offshore Plant (해양플랜트 거주용 부선 실내공간계획 연구)

  • Lee, Han-Seok;Kang, Young-Hun;Doe, Geun-Young
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.4
    • /
    • pp.201-210
    • /
    • 2011
  • This study is on the space planning of accommodation area in accommodation barge, which is a kind of offshore plant supply vessel providing workers with exclusive accommodation facilities. Firstly, the space layout of accommodation area is analyzed using the general arrangement drawings of 10 actually-built accommodation barges currently in use. Secondary, the design guides and standards for living quarters of offshore plants issued from overseas classification societies such as ABS, NORSOK etc. are analyzed and based on the analysis design guidelines for accommodation area of accommodation barge are newly suggested. Thirdly, a model of accommodation area in accommodation barge is set up and space arrangements and movement lines for each deck of the accommodation area of the model are planned. Fourthly, cabins, dinning room and galley, recreation spaces, and sanitary spaces of the accommodation area of the model are planned. The results of this study may be summarized as follows. An accommodation barge has 'barge deck' for small scale work and material storage, and 'accommodation area' for the living and resting of workers. The accommodation area is made of workers accommodation sector, service sector, crew sector and business sector. The interior design guidelines for accommodation area of accommodation barge should be made soon by Korea Register of Shipping.

Electrical system design in FLNG offshore unit

  • Kim, Jong-Su;Kim, Deok-Ki
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.10
    • /
    • pp.1037-1043
    • /
    • 2015
  • In recent years, Floating Liquefied Natural Gas (FLNG) Unit have attracted considerable attention. Generally, liquefied natural gas (LNG) units are produced in onshore liquefaction terminals from gas supplied from onshore gas fields or large-scale offshore gas fields near the coast. However, the development of these gas fields has approached saturation. Large-scale offshore gas fields far from the coast, as well as undeveloped medium- and small-scale offshore gas fields, have recently attracted attention. Among several proposed concepts, the floating LNG plant in the form of the FLNG system was chosen for further evaluation and development, considering worldwide receiving infrastructure. The design of a 2.5 million tonne per annum FLNG unit has been completed with a capacity corresponding to that of modern onshore liquefaction plants. Various simulation tests were performed to evaluate the performance of the electrical power plant, focusing on the efficiency of the electrical system to secure the aspects of plant safety. This design study analyzes the electrical system for the FLNG unit to improve the safety of operation and maintenance in the field.

Experimental study on the effect of EC-TMD on the vibration control of plant structure of PSPPs

  • Zhong, Tengfei;Feng, Xin;Zhang, Yu;Zhou, Jing
    • Smart Structures and Systems
    • /
    • v.29 no.3
    • /
    • pp.457-473
    • /
    • 2022
  • A high-frequency vibration control method is proposed in this paper for Pumped Storage Power Plants (PSPPs) using Eddy Current Tuned Mass Damper (EC-TMD), based on which a new type of EC-TMD device is designed. The eddy current damper parameters are optimized by numerical simulation. On this basis, physical simulation model tests are conducted to compare and study the effect of structural performance with and without damping, different control strategies, and different arrangement positions of TMD. The test results show that EC-TMD can effectively reduce the control effect under high-frequency vibration of the plant structure, and after the additional damping device forms EC-TMD, the energy dissipation is further realized due to the intervention of eddy current damping, and the control effect is subsequently improved. The Multi-Tuned Mass Damper (MTMD) control strategy broadens the tuning band to improve the robustness of the system, and the vibration advantage is more obvious. Also, some suggestions are made for the placement of the dampers to promote their application.