The Characteristic of the Hub Construction Wind Power Industry of the West-South Seashore with Favorable Products (서남해안 풍력산업 허브 구축사업의 유망 상품의 특성)

  • Cha, In Su;Kim, Taehyung;Lee, Ki Bong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.179.1-179.1
    • /
    • 2010
  • This paper has represented about the wind power industry of the west-south seashore with leading industry development for Honam Economic Region. These projects have composed of wind power industry of the west-south seashore, offshore wind turbine(2MW, 3MW) and onshore wind turbine(3kW, 5kW, 10kW), 11 projects, during 3 years- with honam leading industry development for economic region. The contents of these project are 3 favorable products and 3 business support projects. The favorable products are the MW offshore wind system with Outer-rotor type PMSG, the 3MWoffshore wind system with adaptation type of west-south sea, the hybrid generator system with wind turbine technology basis.

  • PDF

A Study on the Conditions Analysis and Assessment of Supporting Port for Offshore Wind Farm : Focusing on Ports in Gyeongsangnam-do (해상풍력단지 지원항만 여건 분석 및 평가에 관한 연구 -경상남도 항만을 중심으로-)

  • Yang, Hang-Jin;Chiang, Bong-Gyu
    • Journal of Korea Port Economic Association
    • /
    • v.35 no.4
    • /
    • pp.85-106
    • /
    • 2019
  • Offshore wind power is a representative renewable energy source and a rapidly growing industry. In Gyeongsangnam-do, offshore wind farms of 461.9MW are being pushed for in the Yokji island and are expected to expand further to over 1GW in the future. Accordingly, ports supporting the storage, assembly, transportation, and installation of offshore wind power equipment are expected to play an important role in the smooth progress of the offshore wind farm development project. Based on previous research and cases in major countries,this study prepared criteria for assessment of ports supporting offshore wind farmsand evaluated ports in Gyeongsangnam-do, which are linked to Yokji island offshore wind farms. The assessment criteria have been subdivided into distance from the offshore wind farm, port entry and exit restrictions, navigational areas, fishery rights factors, additional costs, berth length, depth of berth, size of the port yard, port berth bearing pressure, interference with other cargo, a civil appeal, and relevant industrial aggregation. The ports of Tongyeong, Samcheonpo, Kohyun, Masan, and Jinhae in Gyeongsangnam-do were selected and evaluated. As a result, the port of Tongyoung was superior in terms of distance from the Yokji island offshore wind farm. The ports of Samcheonpo, Masan, and Jinhae were evaluated as excellent in other criteria such as berth length, depth of berth, and so on. This study is expected to be used as a source of basic data for offshore wind power companies and policymakers to select and evaluate the supporting ports of offshore wind farms.

Evaluation Study of LCOE for 8 MW Offshore Floating Wind Turbine in Ulsan Region (울산 앞바다 8 MW급 부유식 해상풍력터빈의 LCOE 연구 )

  • Dong Hoon Lee;Hee Chang Lim
    • Journal of Wind Energy
    • /
    • v.14 no.1
    • /
    • pp.5-13
    • /
    • 2023
  • The commercialization has been of great importance to the clean energy research sector for investing the wind farm development, but it would be difficult to reach a social consensus on the need to expand the economic feasibility of renewable energy due to the lack of reliable and continuous information on levelized cost of Energy (LCOE). Regarding this fact, this paper presents the evaluation of LCOE, focusing on Ulsan offshore region targeting to build the first floating offshore wind farm. Energy production is estimated by the meteorology data combined with the Leanwind Project power curve of an exemplar wind turbine. This work aims to analyze the costs of the Capex depending on site-specific variables. The cost of final LCOE was estimated by using Monte-Carlo method, and it became an average range 297,090 KRW/MWh, a minimum of 251,080 KRW/MWh, and a maximum of 341,910 KRW/MWh. In the year 2021, the SMP (system marginal price) and 4.5 REC (renewable energy certificate) can be paid if 1 MWh of electricity is generated by renewable energy. Considering current SMP and REC price, the floating platform industry, which can earn around 502,000 KRW/MWh, can be finally estimated highly competitive in the Korean market.

Development and Utilization of Evaluation Methods for Offshore Wind Farm Landscape Quality Assessment (해상풍력발전단지 경관의 질 평가를 위한 평가기법의 개발 및 활용방안)

  • Jin-Oh Kim;Byoungwook Min;Kyung-Sook Woo;Jin-Pyo Kim
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.6
    • /
    • pp.577-589
    • /
    • 2023
  • In Korea, the technical techniques for assessing visual impacts are standardized, but the methods for assessing the marine landscape itself are not standardized and need to be improved. In particular, in the landscape impact assessment of offshore wind power generation in Korea, it is necessary to recognize the landscape itself as a receptor and prepare a system that can evaluate the characteristics and sensitivity of the landscape. In this study, we propose an evaluation method for preparing a marine landscape quality assessment document that reflects the project characteristics of offshore wind power projects, and examine the possibility of utilization by applying it to actual project sites as an example. To evaluate the quality of marine scenery in offshore wind power projects, evaluation items of landscape characteristics, physical characteristics, and socio-cultural characteristics were evaluated based on the preliminary survey contents, and the quality of marine scenery was divided into five grades. Next, the evaluation criteria of the evaluation items were synthesized and the quality of the marine landscape was classified into preservation grade (grade 5), semi-preservation grade (grade 4), buffer grade (grade 3), semi-improvement grade (grade 2), and improvement grade (grade 1). In addition, the Sinan-Ui Offshore Wind Farm, an actual project site, was randomly selected to conduct the evaluation process and examine its utilization. This study aims to complement the existing method of visual impact assessment in offshore wind power projects and evaluate the quality of the marine landscape itself to effectively conserve marine landscape resources during offshore wind power projects. Rather than relying on mechanical and quantitative evaluation, this study is expected to be used as a basis for comprehensive understanding of the location and socio-cultural characteristics of the project site and for communication and cooperation with stakeholders.

Status of 3 MW PM Synchronous Generator Development Project for Off-shore WECS (3MW 해상풍력용 영구자석 동기발전기 개발현황)

  • Kim, Dong-Eon;Han, Hong-Sik;Lee, Hong-Gi;Jung, Yung-Gyu;Suh, Hyung-Suck;Chung, Chin-Wha
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.423-426
    • /
    • 2007
  • Pohang Wind Energy Research Center (PoWER-C) is developing a 3 MW Radial Flux Permanent Magnet (RFPM) Synchronous Generator for offshore Wind Energy Converter (WEC). The rotor rpm is 15.7 and the gear ratio is set to be 92.93. The nominal generator rpm at the rated load is about 1459. To reduce the switching loss in the power electronics, the maximum frequency is limited to 100 Hz. This requirement limits the number of pole to six or eight. Permanent magnet excitation is assumed for higher energy yield and higher efficiency. In this report, the requirements and the first efforts for the physics design are described.

  • PDF

Diagnosis of Scoping and Type of Review on the Marine Environmental Impact Assessment for Ocean Energy Development Project (해양에너지개발사업 환경영향평가 검토유형 및 중점평가사항 진단)

  • Lee, Dae In;Kim, Gui Young;Tac, Dae Ho;Yi, Yong Min;Choi, Jin Hyu;Kim, Hye Jin;Lee, Ji Hye;Yoon, Sung Soon
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.18 no.3
    • /
    • pp.179-188
    • /
    • 2015
  • This study reviewed the type of the project and developmental plan related to ocean energy development in the coastal land boundaries and the ocean, and suggested the efficient scoping method through the diagnosis of the key items of environmental impact assessment (EIA) in the coastal area. The major projects are the construction of tidal power plant, tidal current power plant, and offshore wind power plant in the public water, and also those are the construction of solar power plants in the coastal land boundaries. While the project plans on a large scale such as the construction of tidal power plant, it is important to consider both property of usefulness of the designated areas and harmony analysis with marine space availability based on the adequacy of the site selection and relevance of plan with the master plan for reclamation and strategic environmental assessment (SEA). And also it needs to be considered the careful checkup on the EIA checklist referring to the type of project, effective post-monitoring, and suggestion of mitigating methods to minimize the environmental impacts during the stage of actual environmental impact assessment. Introduction of a system of integrated marine environmental impact assessment should be considered for reasonable and effective manage to developmental projects on the marine spatial area.