• 제목/요약/키워드: Offshore Construction Vessel

검색결과 12건 처리시간 0.02초

초심해 용 유전개발선의 설계 (Design of Field Development Ship for Ultra-Deepwater)

  • Park, H.S.;S.W. Yoon;I.M. Song
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2001년도 춘계학술대회 논문집
    • /
    • pp.87-92
    • /
    • 2001
  • This technical note is intended to introduce a state-of-the-art offshore construction vessel. This unique vessel is for multi-purpose Field Development Ship (FDS) for deepwater to ultra-deepwater. The FDS is a construction vessel with dynamic positioning (DP) system intended to develop offshore oil and gas field in water depth up to 3000 m. The design criteria and main capacities of the vessel are discussed.

  • PDF

Innovative Methodology for Assembling Jack up Leg of 205m on ground of Ultra

  • 양영태;심송섭;이승엽;황외주;신봉영
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2003년도 추계학술대회 논문집
    • /
    • pp.87-92
    • /
    • 2003
  • Generally, in jack up rig design for harsh environment, its leg height is a major factor for achieving a sufficient serviceability & operability in terms of the worst environment and the workable depth. Due to difficulties in constructing such a high-slender leg, inaccessibility of yard fabrication equipment, etc. the construction of Jack up rig fur harsh deep sea has not been common. Method using heavy crawler crane, fabrication tower or extension by the floating crane vessel is still conventional construction but, considering high cost fur mobilizing heavy lift vessel (HLV) or additional marine work for implementing preload / full height test at sea, the ground-base construction is much advantageous. Air skidding method (ASM hereafter) is ground-based construction methodology, newly developed due to such requests. ASM could also be extended to similar engineering fields. This paper presents the operating sequence, design parameters and procedure which were verified through successful operation at the end of May 2002.

  • PDF

Exploring market uncertainty in early ship design

  • Zwaginga, Jesper;Stroo, Ko;Kana, Austin
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제13권1호
    • /
    • pp.352-366
    • /
    • 2021
  • To decrease Europe's harmful emissions, the European Union aims to substantially increase its offshore wind energy capacity. To further develop offshore wind energy, investment in ever-larger construction vessels is necessary. However, this market is characterised by seemingly unpredictable growth of market demand, turbine capacity and distance from shore. Currently it is difficult to deal with such market uncertainty within the ship design process. This research aims to develop a method that is able to deal with market uncertainty in early ship design by increasing knowledge when design freedom is still high. The method uses uncertainty modelling prior to the requirement definition stage by performing global research into the market, and during the concept design stage by iteratively co-evolving the vessel design and business case in parallel. The method consists of three parts; simulating an expected market from data, modelling multiple vessel designs, and an uncertainty model that evaluates the performance of the vessels in the market. The case study into offshore wind foundation installation vessels showed that the method can provide valuable insight into the effect of ship parameters like main dimensions, crane size and ship speed on the performance in an uncertain market. These results were used to create a value robust design, which is capable of handling uncertainty without changes to the vessel. The developed method thus provides a way to deal with market uncertainty in the early ship design process.

Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction

  • Kim, Min-Gyu;Kang, Hyungjoo;Lee, Mun-Jik;Cho, Gun Rae;Li, Ji-Hong;Yoon, Tae-Sagm;Ju, Jaeheung;Kwak, Han-Wan
    • 한국해양공학회지
    • /
    • 제34권5호
    • /
    • pp.361-370
    • /
    • 2020
  • We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it's trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.

버켓기초를 가진 해상풍력타워의 선박충돌 거동 (Ship Collision Behaviors of Offshore Wind Tower on Bucket Foundation)

  • 이계희;박준석;홍관영
    • 한국재난정보학회 논문집
    • /
    • 제8권2호
    • /
    • pp.138-147
    • /
    • 2012
  • 본 논문에서는 해상풍력발전타워와 선박충돌에 대한 다양한 매개변수에 해석을 수행하여 선박충돌시 버켓파일로 지지된 기초부와 상부타워의 극한하중에 대한 거동을 분석하였다. 또한 충돌에너지의 변화에 따른 버켓기초의 안정성 여부 및 풍력타워의 에너지 소산능력에 대해 파악하였다. 해석결과 선박이 충돌에너지는 주로 타워의 소성변형에너지에 의해 소산 되었으며 이러한 극한상태의 하중에도 기초부는 충분한 지지력을 보이는 것으로 나타났다.

LNG FPSO 압축기 고장시간 예측 방안에 관한 연구 (A Study on Estimating the Next Failure Time of a Compressor in LNG FPSO)

  • 조상제;전홍배;신종호;황호진
    • 산업경영시스템학회지
    • /
    • 제37권4호
    • /
    • pp.12-23
    • /
    • 2014
  • The O&M (Operation and Maintenance) phase of offshore plants with a long life cycle requires heavy charges and more efforts than the construction phase, and the occurrence of an accident of an offshore plant causes catastrophic damage. So previous studies have focused on the development of advanced maintenance system to avoid unexpected failures. Nowadays due to the emerging ICTs (Information Communication Technologies) and sensor technologies, it is possible to gather the status data of equipment and send health monitoring data to administrator of an offshore plant in a real time way, which leads to having much concern on the condition based maintenance policy. In this study, we have reviewed previous studies associated with CBM (Condition-Based Maintenance) of offshore plants, and introduced an algorithm predicting the next failure time of the compressor which is one of essential mechanical devices in LNG FPSO (Liquefied Natural Gas Floating Production Storage and Offloading vessel). To develop the algorithm, continuous time Markov model is applied based on gathered vibration data.

새만금방조제 건설로 인한 조업구역의 변경이 전라북도 근해형망어업의 패류어획량에 미치는 영향 (Influence on the catch of shellfish by offshore dredge fishery according to change fishing area to the construction of the Samangeum Dike in Jeollabuk-do, Korea)

  • 최종덕;류동기;이미희
    • 수산해양기술연구
    • /
    • 제53권3호
    • /
    • pp.266-275
    • /
    • 2017
  • The maximum sustained yield (MSY) of shellfish caught through dredge fishery was 7,250 to 7,490 MT from 1990 to 1999, which was not affected by the construction of the Saemangeum Dike. The MSY from 2000 to 2016, under the influence of the dike, was 1,716 to 1,776 MT when the total annual fish catch was 1,000 MT or more, and 289 to 336 MT when it was less than 1,000 MT. The construction of the Saemangeum Dike led to a decrease in the catch volume of the offshore dredge fishery in Jeollabuk-do, to 4.2 to 23.7% of that before its construction. The allowable biological catch (ABC) was estimated to be 313 to 1,532 MT per year, which was about 72.3 to 94.3% less than before the construction of Saemangeum Dike. Currently, the dredge fishery in Jeollabuk-do relies on comb pen shells. For fishery management, the catch per vessel should be set at 51.0 MT/year or less, and the number of fishing vessels should be reduced to 22 as quickly as possible. Besides, in the long term, the number of current fishing vessels should be reduced to less than half in consideration of the comb pen shell collecting period in Jeollabuk-do.

액화천연가스 운반선(LNGC)의 발전 추세 (A Developing Tendency of Liquefied Natural Gas Carriers)

  • 이동섭
    • 해양환경안전학회지
    • /
    • 제15권3호
    • /
    • pp.269-274
    • /
    • 2009
  • LNGC(Liquefied Natural Gas Carrier)의 역사는 1959년 $5,000m^3$ 급 LNG선 "Methane Pioneer"호를 시작으로 1969년에는 $71,500m^3$ 급, 1973년에는 Moss Type의 최초 LNG운반선 "Norman Lady($87,600m^3$)호, 1980년대 $125,000m^3$ 급을 시작으로 1990년대를 거처 $135,000m^3$ 급, 2007년 $210,000m^3$급 그리고 2008년에는 $266,000m^3$ 급의 초대형 액화천연가스 운반선이 출현하였다. 또한 2006년 11월에는 기존 내 외연 기관이 아닌 발전기 기동으로 Propeller를 움직이는 DFDE(Duel Fuel Diesel Electric)엔진, 육상의 Storage Tank를 생략한 기화설비를 갖춘 LNG-RV(Re-gasification Vessel)와 주 기관은 Slow Diesel을 택하고, 운항 중 발생하는 BOG(Boil Off Gas)를 재액화시키는 설비를 갖춘 DRL(Diesel Re-Liquefaction)선박 및 해상 LNG 생산 저장시설인 LNG-FPSO(Floating Production and Storage Offshore), 그리 고 해상 LNG 인수기지 역할을 하는 LNG-FSRU(Floating Store and Re-gasification Unit) 등이 개발되었다. 이 논문에서는 LNG Project, 전 세계 에너지 시장과 LNGC의 발전 추세에 대하여 다루었다.

  • PDF

다양한 형상의 Jack-up Leg에 대한 해양 동역학적 수치해석 (Numerical Analysis of Hydrodynamic Characteristics for Various Types of Jack-up Legs)

  • 김지석;박민수;구원철
    • 한국해양공학회지
    • /
    • 제28권5호
    • /
    • pp.371-377
    • /
    • 2014
  • In this study, the hydrodynamic characteristics of various types of jack-up legs for a wind turbine installation vessel were analyzed. Using the modified Morison equation, the wave and current excitation forces on the jack-up legs were calculated. A modal analysis was performed to predict the dynamic responses for various types of jack-up legs. The Newmark-beta time integration scheme was used to solve the equation of motion in waves in the time domain. The maximum displacement and maximum bending stress were computed for four different types of legs, and their results were compared to select an optimum leg type. Finally, a six-leg jack-up rig with the selected optimal legs was modeled, and its natural period and hydrodynamic behaviors were evaluated.

심해용 ROV를 위한 수중 원격 영상제어 시스템 개발 (Developed Ethernet based image control system for deep-sea ROV)

  • 김현희;정기민;박철수;이경창;황용연
    • 한국산업융합학회 논문집
    • /
    • 제21권6호
    • /
    • pp.389-394
    • /
    • 2018
  • Remotely operated vehicle(ROV) and autonomous underwater vehicle(AUV) have been used for underwater surveys, underwater exploration, resource harvesting, offshore plant maintenance and repair, and underwater construction. It is hard for people to work in the deep sea. Therefore, we need a vision control system of underwater submersible that can replace human eyes. However, many people have difficulty in developing a deep-sea image control system due to the deep sea special environment such as high pressure, brine, waterproofing and communication. In this paper, we will develop an Ethernet based remote image control system that can control the image mounted on ROV.