• Title/Summary/Keyword: Off-site Construction

Search Result 128, Processing Time 0.024 seconds

Analysis of Hydrogen Sales Data at Hydrogen Charging Stations (수소 충전소의 수소 판매량 데이터 분석)

  • MINSU KIM;SUNGTAK JEON;TAEYOUNG JYUNG
    • Journal of Hydrogen and New Energy
    • /
    • v.34 no.3
    • /
    • pp.246-255
    • /
    • 2023
  • Due to lack of hydrogen charging stations and hydrogen supply compared to the supply of hydrogen vehicles, social phenomena such as 2-hour queues and restrictions on charging capacity are occurring, which negatively affects the spread of hydrogen vehicles. In order to resolve these problems, it is essential to have a strategic operation of the hydrogen charging stations. To establish operational strategies, it is necessary to derive customer demand patterns and characteristics through the analysis of sales data. This study derived the demand patterns and characteristics of customers visiting hydrogen charging stations through data analysis from various perspectives, such as charging volume, charging speed, number of visits, and correlation with external factors, based on the hydrogen sales data of off-site hydrogen charging stations located in domestic residential areas.

A Study on the Development of Precast Concrete Modular and its Application Onsite (프리캐스트 콘크리트 모듈러 개발 및 현장적용에 관한 연구)

  • Bae, Kyu-Woong;Boo, Yoon-Seob;Shin, Sang-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.27-28
    • /
    • 2023
  • Currently, the Off-Site Construction (OSC) construction method, which emphasizes the minimization of field work, is being emphasized at construction sites due to the lack of construction skilled manpower, extreme weather, and the Severe Disaster Punishment Act. In this study, we developed a stacked PC modular, which is a method of stacking PC modules, and solved the lifting problem by reducing the weight of the unit module, which is emerging as the biggest disadvantage of PC modules, to around 20 tons. For the connection between modules, structural safety was secured through repeated history tests of the wall and slab connection. Walls and slabs satisfied all statutory fire resistance times through fire resistance tests, and residential performance was evaluated to be satisfactory through mock-up demonstration. The developed PC modular has been applied to the construction of commercial houses, detached houses, shopping malls, churches, etc., and has design results for many buildings such as dormitories, detached houses with 4 floors or more, and resorts, so it is expected that an atmosphere of revitalization of construction methods will be created.

  • PDF

Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing (공동주택 OSC공법 적용 확산을 위한 공사비 분야 경제성 개선 요인 분석 - PC 부재 설계, 제작, 운송, 시공을 중심으로 -)

  • Yun, WonGun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.55-63
    • /
    • 2021
  • Recently, as the problem of the traditional on-site labor-intensive construction production method has been raised due to changes in construction work labor and site conditions, the OSC method is gradually spreading as an alternative to this. Even in apartment houses, the application of the PC method is expanding centered on the underground parking lot, but the high cost structure is a problem compared to the conventional formwork method. In this study, factors affecting the calculation of construction cost in the economic evaluation, which are the core of determining the construction method for apartment buildings, are derived through domestic and foreign literature review and expert advice, the importance was analyzed through an opinion survey targeting industry experts. The measures to reduce construction cost were mainly derived from the improvement of the design and manufacturing process. It is expected that the factors affecting the construction cost and improvement measures of the PC method derived from this study will serve as a direction for technology development to spread the application of the PC method for apartment houses in the future.

Study on Dose Rate on the Surface of Cask Packed with Activated Cut-off Pieces from Decommissioned Nuclear Power Plant

  • Park, Kwang Soo;Kim, Hae Woong;Sohn, Hee Dong;Kim, Nam Kyun;Lee, Chung Kyu;Lee, Yun;Lee, Ji Hoon;Hwang, Young Hwan;Lee, Mi Hyun;Lee, Dong Kyu;Jung, Duk Woon
    • Journal of Radiation Protection and Research
    • /
    • v.45 no.4
    • /
    • pp.178-186
    • /
    • 2020
  • Background: Reactor pressure vessel (RV) with internals (RVI) are activated structures by neutron irradiation and volume contaminated wastes. Thus, to develop safe and optimized disposal plan for them at a disposal site, it is important to perform exact activation calculation and evaluate the dose rate on the surface of casks which contain cut-off pieces. Materials and Methods: RV and RVI are subjected to neutron activation calculation via Monte Carlo methodology with MCNP6 and ORIGEN-S program-neutron flux, isotopic specific activity, and gamma spectrum calculation on each component of RV and RVI, and dose rate evaluation with MCNP6. Results and Discussion: Through neutron activation analysis, dose rate is evaluated for the casks containing cut-off pieces produced from decommissioned RV and RVI. For RV cut-off ones, the highest value of dose rate on the surface of cask is 6.97 × 10-1 mSv/hr and 2 m from it is 3.03 × 10-2 mSv/hr. For RVI cut-off ones, on the surface of it is 0.166 × 10-1 mSv/hr and 2 m from it is 1.04 × 10-1 mSv/hr. Dose rates for various RV and RVI cut-off pieces distributed lower than the limit except the one of 2 m from the cask surface of RVI. It needs to adjust contents in cask which carries highly radioactive components in order to decrease thickness of cask. Conclusion: Two types of casks are considered in this paper: box type for very-low-level waste (VLLW) as well as low-level waste (LLW) and cylinder type for intermediate-level waste (ILW). The results will contribute to the development of optimal loading plans for RV and RVI cut-off pieces during the decommissioning of nuclear power plant that can be used to prepare radioactive waste disposal plans for the different types of wastes-ILW, LLW, and VLLW.

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

Analysis of Core Tasks for Activate Modular Construction Projects in Korea (국내 모듈러 프로젝트의 활성화를 위한 핵심과제 분석)

  • Lee, Myungdo;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.459-470
    • /
    • 2024
  • As policy support for the modular construction method and measures to expand the market are being prepared, it is time to present and analyze clear tasks for activation. Therefore, this study aims to present core tasks for activating the modular construction method. The tasks were reviewed through analysis of existing research and supplemented through expert interviews to derive 30 core tasks. Following this, a questionnaire survey was conducted to analyze the important and urgent of these core tasks and to determine their priorities. The results of this study can contribute to a strategic approach for solving the core tasks necessary for revitalizing modular construction.

Low Impact Urban Development For Climate Change and Natural Disaster Prevention

  • Lee, Jung-Min;Jin, Kyu-Nam;Sim, Young-Jong;Kim, Hyo-Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.54-55
    • /
    • 2015
  • Increase of impervious areas due to expansion of housing area, commercial and business building of urban is resulting in property change of stormwater runoff. Also, rapid urbanization and heavy rain due to climate change lead to urban flood and debris flow damage. In 2010 and 2011, Seoul had experienced shocking flooding damages by heavy rain. All these have led to increased interest in applying LID and decentralized rainwater management as a means of urban hydrologic cycle restoration and Natural Disaster Prevention such as flooding and so on. Urban development is a cause of expansion of impervious area. It reduces infiltration of rain water and may increase runoff volume from storms. Low Impact Development (LID) methods is to mimic the predevelopment site hydrology by using site design techniques that store, infiltrate, evaporate, detain runoff, and reduction flooding. Use of these techniques helps to reduce off-site runoff and ensure adequate groundwater recharge. The contents of this paper include a hydrologic analysis on a site and an evaluation of flooding reduction effect of LID practice facilities planned on the site. The region of this Case study is LID Rainwater Management Demonstration District in A-new town and P-new town, Korea. LID Practice facilities were designed on the area of rainwater management demonstration district in new town. We performed analysis of reduction effect about flood discharge. SWMM5 has been developed as a model to analyze the hydrologic impacts of LID facilities. For this study, we used weather data for around 38 years from January 1973 to August 2014 collected from the new town City Observatory near the district. Using the weather data, we performed continuous simulation of urban runoff in order to analyze impacts on the Stream from the development of the district and the installation of LID facilities. This is a new approach to stormwater management system which is different from existing end-of-pipe type management system. We suggest that LID should be discussed as a efficient method of urban disasters and climate change control in future land use, sewer and stormwater management planning.

  • PDF

Performance Evaluation On Floating Rail Track System (레일부유궤도 시스템에 대한 성능 평가)

  • Kim Soon-Cheol;Kang Jeong-Ok;Ji Yune-Bae;Han Kwang-Seob;Jeon Byung-Chan
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.756-762
    • /
    • 2004
  • Up to now, the only way is Floating Slab Track System, which cuts off vibration by installing spring between concrete slab and ground for the lines of particularly requiring attenuating vibration. The weak point of Floating Slab Track System is large increase of construction cost because normally the structure is getting bigger. In regards to this matter, Floating Rail Track System has been developed, which cuts off vibration by floating the first cause of vibration rail, and the system is in operation. In the thesis, the application of new attenuating vibration track system has been confirmed by studying theoretical background of Floating Rail Track System and evaluating dynamic deflection of track and attenuating of noise and vibration performance through various measurements from laboratory tests and site inspection.

  • PDF

A Study on the Efficiency of Horizontal Direction Deck-charge Blasting Method Using Electronic Detonator (전자뇌관을 이용한 수평방향 데크차지 발파공법의 효율성검토 연구)

  • Yoon, Ji-Sun;Hahn, Suk-Ju;Bae, Sang-Hun
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • In close to downtown construction, the main problem is complaints caused by blasting vibration and noise. To reduce blasting vibration and noise, deck-charge blasting method using electronic detonator can be more secure because there is no cut-off problem. And in this method it is possible to blast in horizontal direction. In this study, the efficiency of horizontal direction deck-charge blasting method using electronic detonator is compared to that of the existing blasting method. And the possibility of applying the construction site is evaluated. As a result, the reduction of blasting vibration, noise and secondary breaking has been determined, as well as large-scale blasting in the vibration criterion can be regulated by the overall increase in blasting efficiency.