A collaborative process between employers and practitioners for utilization of BIM and 3D scanning (실무 3D 스캐닝 및 BIM 활용을 위한 발주자 - 실무자 간 협업프로세스 모델)

  • Kim, Do-Young
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.33-42
    • /
    • 2021
  • In construction sites, policies are changing considering the convergence of 3D scanning and BIM. In order to respond to this, it is urgent to develop guidelines for systematic collaboration methods that take into account the perspectives of practitioners. By participating in the delivery process using 3D scanning technology, tasks such as ordering, field scanning are defined in terms of mutual communications. Also, the collaboration process is about communications between off-site and on-site, such as feed-back using data and documents. In the future, we will propose guidelines based on such collaborative process models.

Application of Logistic Simulation for Transport of SFs From Kori Site to an Assumed Interim Storage Facility

  • Kim, Young-Min;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.1
    • /
    • pp.61-74
    • /
    • 2021
  • A paradigm shift in the government's energy policy was reflected in its declaration of early closure of old nuclear plants as well as cancellation of plans for the construction of new plants. To this end, unit 1 of Kori Nuclear Power Plant was permanently shut down and is set for decommission. Based on these changes, the off-site transport of spent fuels from nuclear power plants has become a critical issue. The purpose of this study is to develop an optimized method for transportation of spent fuels from Kori Nuclear Power Plant's units 1, 2, 3, and 4 to an assumed interim storage facility by simulating the scenarios using the Flexsim software, which is widely used in logistics and manufacturing applications. The results of the simulation suggest that the optimized transport methods may contribute to the development of delivery schedule of spent fuels in the near future. Furthermore, these methods can be applied to decommissioning plan of nuclear power plants.

Development of algorithm for work intensity evaluation using excess overwork index of construction workers with real-time heart rate measurement device

  • Jae-young Park;Jung Hwan Lee;Mo-Yeol Kang;Tae-Won Jang;Hyoung-Ryoul Kim;Se-Yeong Kim;Jongin Lee
    • Annals of Occupational and Environmental Medicine
    • /
    • v.35
    • /
    • pp.24.1-24.15
    • /
    • 2023
  • Background: The construction workers are vulnerable to fatigue due to high physical workload. This study aimed to investigate the relationship between overwork and heart rate in construction workers and propose a scheme to prevent overwork in advance. Methods: We measured the heart rates of construction workers at a construction site of a residential and commercial complex in Seoul from August to October 2021 and develop an index that monitors overwork in real-time. A total of 66 Korean workers participated in the study, wearing real-time heart rate monitoring equipment. The relative heart rate (RHR) was calculated using the minimum and maximum heart rates, and the maximum acceptable working time (MAWT) was estimated using RHR to calculate the workload. The overwork index (OI) was defined as the cumulative workload evaluated with the MAWT. An appropriate scenario line (PSL) was set as an index that can be compared to the OI to evaluate the degree of overwork in real-time. The excess overwork index (EOI) was evaluated in real-time during work performance using the difference between the OI and the PSL. The EOI value was used to perform receiver operating characteristic (ROC) curve analysis to find the optimal cut-off value for classification of overwork state. Results: Of the 60 participants analyzed, 28 (46.7%) were classified as the overwork group based on their RHR. ROC curve analysis showed that the EOI was a good predictor of overwork, with an area under the curve of 0.824. The optimal cut-off values ranged from 21.8% to 24.0% depending on the method used to determine the cut-off point. Conclusion: The EOI showed promising results as a predictive tool to assess overwork in real-time using heart rate monitoring and calculation through MAWT. Further research is needed to assess physical workload accurately and determine cut-off values across industries.

A Study on the Dynamic Characteristics of on-shore Ground Using Suspension P. S. Logging (서스펜션 P.S. 검층을 이용한 해저 지반의 동역학적 특성에 관한 연구)

  • 김용수;정승용;장찬수;김수삼
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.357-364
    • /
    • 1999
  • In recently site investigations, the need for the determination of dynamic soil properties such as dynamic modules of rigidity, elasticity, dynamic poison's ratio and damping ratio etc. is increasing for the astigmatic designs of the civil structures. To obtain some of the dynamic properties, measurement of elastic waves velocity, both P and S wave, is required. Among various methods to measure elastic wave velocity such and Down Hole, Cross Hole and Refraction etc., Suspension P.S. Logging has an advantage to use for the off-shore investigation where generation of the shock wave and traveling of the wave is difficult. In suspension P.S. logging, specially designed prove equipped with source of shock wave, two 3-channel receivers, departing 1m distance, and other auxiliary facilities is inserted down in a bore hole bottom and raised in predetermined interval, usually 1m or 2m, and measurement is conducted. P.S. logging have been conducted in a off-shore construction project near InChon in the west coast for the first in the country, and form the result, potential of the liquefaction of the subsoil was evaluated and compared with the conventional method.

  • PDF

A Process for Structural Design of Form System for in-situ Production of Green Frame (그린프레임 현장생산용 거푸집 시스템 개발을 위한 구조설계 절차)

  • Lim, Chae-Yeon;Kim, Keun-Ho;Na, Young-Ju;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.29-30
    • /
    • 2012
  • The precast concrete column-beam structure, Green Frame, allows the main structural members such as precast concrete column and beam to be produced on the site, resulting in a reduction of transportation cost and the margin of plant. However, existing plywood from for in-situ production of precast concrete members has problems like putting in inordinate human resource, falling-off in quality and workability. To solve those problems, form system for in-situ production of precast concrete members shall be developed. In this regard, this study aims to analyze the structural concept of from system for in-situ production. The result of this study will use for development of form system for in-situ production.

  • PDF

Development of PC modular Construction System using 3D Infill (3D Infill을 활용한 PC모듈러 시공시스템 개발)

  • Chung, Joo-Soo;Lim, Seok-Ho;Heo, Byung-Wook;Chae, Ji-Yong;Park, Jin-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.14-15
    • /
    • 2020
  • The need for off-site construction has increased in the construction industry in Korea in recent years due to the enforcement of the 52-hour workweek, the increasing age of workers on construction sites, the deepening dependence on overseas workers, and the stagnation of productivity in the construction industry. Thus, studies on OSC started in April 2020. In addition, as a national policy study advocating the modular construction method, which is one of the OSC methods, was completed in the first half of 2019. 70 housing units in two complexes that satisfied the Housing Act requirements have been supplied to citizens. However, although modular construction methods have been recognized as a dramatic construction method that achieves shortened construction schedules and solves the issues of cost reduction and the shortage of technical workers on sites by combining the advantages of the manufacturing industry and applying the economies of scale, realistically it has issues due to the rising cost of steel and a low pre-fabrication ratio. Moreover, the construction time of core parts, such as those built by pouring concrete, has become a factor that hinders the shortening of construction times. Thus, this study aims to propose a precast concrete(PC) modular construction system, which fuses three-dimensional infill as an interior finish material and a three-surface PC module that can acts as a structure for a construction method that is economical and can shorten construction time.

  • PDF

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

BIM based Data Exchange System of Welded Wire/bar Mat for Pre-fab RC Members (BIM 기반 프리패브 부재의 용접철근매트 정보교환 시스템)

  • Jung, Jae-Hwan;Kim, Do-Hyeong;Kim, Hyun-Gi
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.21-30
    • /
    • 2021
  • Reinforcing bars, a major component of the pre-fab structure, adheres to the existing on-site assembly method and attempts to develop and commercialize the technology of the pre-assembly method, but the effect is insignificant. Welded Wire / Bar Mat (WBM) has various advantages such as commercialization of rebar through machine manufacturing to improve workability, but it is different from the existing design and the construction method is different from the previous one. Therefore, to maximize the advantages of WBM and improve productivity, manufacturing, transportation, and construction from the design stage should be considered based on BIM from the initial design stage. In this paper, the concept of the design support system for the WBM was established based on the use of BIM in concrete reinforcement and the preliminary research on the WBM. WBM conversion design was performed for the existing prefabricated members, and based on this, the exchange format and system of the master prefabricated model with the WBM design data were set up. As a result of the pilot test, it was found that the traditional reinforcing bar information extracted from the master prefab model has transmitted 100% accurately. As for the WBM information, 100% of the information on the straight reinforcement was transmitted and represented, and the information on the bent reinforcement was found to have a 90% recall in the master BIM tool.

A Study on the Tact Management Using a Daily Report Information (작업일보 정보를 이용한 택트공정관리방안 연구)

  • Kim Sun-Kuk;Na Kwang-Soo;Kim Tea-Hui;Yu Jung-Ho;Lee Hyun-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.80-87
    • /
    • 2003
  • Recent construction projects, characterized by its complication and high-tech, requites highly efficient management efforts. Among others, labor management is very important due to various trades and increasing number of activities. Along with advanced information technology, Web-based construction site management systems are widely adopted in order to improve the efficiency of construction management. However, such information systems have mainly 2 (two) shortcomings. One is that the existing systems were developed and implemented not in subcontractor-centered way but in main contractor-centered way, though the daily construction information is mainly generated, gathered and reported by subcontractors. As a result, subcontractors seldom have access to such information systems. The other is that loss or omission of information may uclw during the information processing process, in which subcontractors have no direct access to such information system. This becomes a major reason of losing the reliability of the information in daily construction report. As a solution for these problems, this paper suggests a Web-based information system that is subcontractor-oriented and also suitable for tact schedule management.

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.