• Title/Summary/Keyword: Observational design and construction method

검색결과 17건 처리시간 0.021초

지반과 관련된 지난 세기의 건설사고와 정보화 시공 (A Review of the Last Century Construction Failures and the Observational Method in Geotechnical Engineering)

  • 김학문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술세미나 논문집
    • /
    • pp.1-36
    • /
    • 2000
  • Construction incidents, mechanisms and causes in Geotechnical Engineering have been closely reviewed for the safety assurance during design and construction stages. The safety assurance is clearly related to the observational method in which design is reviewed during construction and contingency actions are undertaken successfully to minimise any potential failures. The observational method has been extensively applied for the construction of subways underground structures, dams and many important Civil Engineering projects in the past 20 years. But the number of serious construction incidents are growing for the past several decades. Therefore present development of observational method and improvement techniques are introduced with some case histories.

  • PDF

불연속성 암반에서의 터널의 암반블럭 평가를 위한 신 정보화설계시공법 (New Observational Design and Construction Method for Rock Block Evaluation of Tunnels in Discontinuous Rock Masses)

  • 황재윤
    • 터널과지하공간
    • /
    • 제16권1호
    • /
    • pp.1-10
    • /
    • 2006
  • 실제 암반에는 단층, 절리, 층리, 균열, 단열, 편리, 벽개 등의 불연속면이 많이 포함되어 있다. 따라서, 불연속면이 암반구조물의 거동을 좌우하고 있다. 암반구조의 복잡성으로 인해 사전에 예측 할 수 없었던 암반의 붕락이 발생하여, 붕락대책에 막대한 비용과 시간을 낭비하는 사례가 많다. 암반 불연속면의 복잡성을 사전 조사단계에서 충분히 파악하거나 대책을 수립하는 것은 어렵다. 최근 터널의 정보화 설계시공이 중요시되어지고 있다. 본 논문에서는 불연속성 암반에서의 터널의 신 정보화 설계시공법을 제안하고, 현지에서 관찰한 불연속면 정보를 근거로 하여 실제 터널현장에 적용했다. 실제 터널현장에 있어서, 터널의 신 정보화 설계시공법을 위해서 새롭게 개발한 수치해석 프로그램을 사용하여 정확한 키블럭 추출이 가능하였다. 사용하기 쉬운 사용자 인터페이스를 가지고 있는 본 컴퓨터 시뮬레이션 기법은 암반블럭의 안정성 계산뿐만 아니라 추가 보강대책공의 설계도 가능하다. 터널 굴착중에 키블럭을 확인하므로써, 제안한 신 정보화 설계시공법의 유효성에 대한 검증을 하였다.

터널의 정보화 설계시공을 위한 키블럭 해석기법 (Key block analysis method for observational design and construction method in tunnels)

  • 황재윤
    • 한국터널지하공간학회 논문집
    • /
    • 제12권3호
    • /
    • pp.275-283
    • /
    • 2010
  • 최근 터널의 정보화 설계시공이 중요시 되어지고 있다. 암반에는 절리, 단층, 균열, 층리, 단열 등의 불연속면이 많이 포함되어 있다. 따라서, 암반 불연속면이 터널의 거동을 좌우하고 있다. 본 연구에서는 터널의 정보화 설계시공을 위한 키블럭 해석기법을 제안하고, 초대단면 터널현장에 적용했다. 제안한 해석기법은 불연속면의 연속성을 고려하여, 블록의 형상에 관계없이 모든 형상의 블록이 인식 가능하여 복잡한 굴착면에 적용가능하다. 터널현장에서의 해석결과를 비교 검토하여, 본 연구에서 개발한 터널의 정보화 설계시공을 위한 키블럭 해석기법의 타당성과 적용성에 대한 검증을 하였다.

정보화 시공에서 Feed Back Analysis (터널, 암반사면, 지반굴착 등 Hard Material 사례중심으로) (The Role of Feed Back Analysis in Observational Method)

  • 김학문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.147-179
    • /
    • 2002
  • The important role of observational method in geotechnical engineering are emphasized together with the direction of future development, concerning successful application of the technique on the site investigation, design and feed back at various construction stages. Case histories on the application of feed back are introduced in order to achieve the most economical and reliable construction for tunnel, rock slope and deep excavations through feed back system at design and construction stages. Also the limitations and advantages of the observational method and the role of feed back system are discussed for construction of tunnel, rock slope and deep excavation in hard ground such as layered ground conditions including weathered, soft and hard rocks.

  • PDF

터널의 신 정보화 설계시공법과 극대단면 터널에의 적용 (New Observational Design and Construction Method in Tunnels and Its Application to Very Large Cross Section Tunnel)

  • 황재윤
    • 한국지반공학회논문집
    • /
    • 제20권7호
    • /
    • pp.5-14
    • /
    • 2004
  • 최근 터널의 정보화 설계시공이 중요시 되어지고 있다. 암반구조의 복잡성으로 인해 사전에 예측 할 수 없었던 암반의 붕락이 발생하여, 붕락대책에 막대한 비용과 시간을 낭비하는 사례가 많다. 암반 불연속면의 복잡성을 사전 조사 단계에서 충분히 파악하거나 대책을 수립하는 것은 어렵다. 본 논문에서는 터널의 신 정보화 설계시공법을 제안하고, 현장에서 관찰한 불연속면 정보를 근거로 하여 극대단면 터널에 적용했다. 터널의 신 정보화 설계시공법을 위한 수치해석 프로그램은 범용성, 정밀성, 신속성, 편리한 사용성을 검토하여 새롭게 개발되었다. 극대단면 터널에서는 표준지보에 의해 지지할 수 없는 불안정 키블럭이 7개 존재하는 것이 판명되었다. 7개의 키블럭에 대해서는 굴착전에 추가 지보를 실시했다. 극대단면 터널에 있어서, 터널의 신 정보화 설계시공법을 위해서 새롭게 개발한 수치해석 프로그램을 사용하여 정확한 키블럭 추출이 가능한 것을 검증하였다. 사용하기 쉬운 사용자 인터페이스를 가지고 있는 본 컴퓨터 시뮬레이션 기법은 키블럭의 안정성 계산뿐만 아니라 추가보강대책공의 설계도 가능하다.

지반공학 분야의 국외 정보화 시공기술 적용 사례 및 발전 방향 (New Technologies and Development in Observational Methods and Research Needs in Geotechnical Engineering)

  • 유충식
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술세미나 논문집
    • /
    • pp.37-54
    • /
    • 2000
  • The observational method using field measurement technique have contributed significantly to advancements in the state-of-the art of geotechnical engineering in the 20th century. Due to the rapid development in computer technology, Internet and GIS have become an integral part of civil engineering project management. This paper presents new technologies and development in observational method which have valuable implication on field measurement in geotechnical engineering. Systematic approach to planning monitoring program in geotechnical instrumentation is also presented. Finally, research needs in development and application of integrated design/construction management system in geotechnical engineering projects are discussed.

  • PDF

지반굴착 흙막이공의 정보화시공 종합관리를 위한 역해석 프로그램 개발 (Development of Back Analysis Program for Total Management Using Observational Method of Earth Retaining Structures under Ground Excavation)

  • 오정환;조철현;김성재;백영식
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 정보화시공 학술발표회
    • /
    • pp.103-122
    • /
    • 2001
  • For prediction of ground movement per the excavation step, observational results of ground movement during the construction was very different with prediction during the analysis of design. step because of the uncertainty of the numerical analysis modelling, the soil parameter, and the condition of a construction field, etc. however accuratly numerical analysis method was applied. Therefore, the management system through the construction field measurement should be achieved for grasping the situation during the excavation. Until present, the measurement system restricted by ‘Absolute Value Management system’only analyzing the stability of present step was executed. So, it was difficult situation to expect the prediction of ground movement for the next excavation step. In this situation, it was developed that ‘The Management system TOMAS-EXCAV’ consisted of ‘Absolute value management system’ analyzing the stability of present step and ‘Prediction management system’ expecting the ground movement of next excavation step and analyzing the stability of next excavation step by‘Back Analysis’. TOMAS-EXCAV could be applied to all uncertainty of earth retaining structures analysis by connecting ‘Forward analysis program’ and ‘Back analysis program’ and optimizing the main design variables using SQP-MMFD optimization method through measurement results. The application of TOMAS-EXCAV was confirmed that verifed the three earth retaing construction field by back analysis.

  • PDF

정밀 화상계측법을 이용한 암반변위 계측시스템 (Rock Displacement Measurement System by Precise Vision Metrology)

  • 황재윤
    • 터널과지하공간
    • /
    • 제21권6호
    • /
    • pp.450-459
    • /
    • 2011
  • 지하공간, 터널, 사면 등 암반구조물의 안정성 평가하기 위해서 필요한 것은 암반변위의 계측이다. 암반구조물의 계측은 아직도 줄자, 레벨 또는 토탈스테이션 등을 이용하는 계측 방법에 의존하고 있는 것이 일반적인 실정이다. 하지만 이러한 방법들은 많은 결점들을 가지고 있어 새로운 방법의 모색이 필요하다. 본 연구에서는 암반구조물에서의 정보화 설계시공의 계측기법으로 개발한 정밀 화상계측법을 이용한 암반변위 계측시스템을 제안하고, 건설 중에 있는 터널에 적용했다. 실제 건설 중에 있는 터널현장에 적용하여 계측결과를 비교 검토함으로써, 개발한 정밀 화상계측법을 이용한 암반변위 계측시스템의 유효성과 적용성에 대한 검증을 하였다.

Tunnelling on terrace soil deposits: Characterization and experiences on the Bogota-Villavicencio road

  • Colmenares, Julio E.;Davila, Juan M.;Shin, Jong-Ho;Vega, Jairo
    • Geomechanics and Engineering
    • /
    • 제15권3호
    • /
    • pp.899-910
    • /
    • 2018
  • Terrace deposits are often encountered in portal areas and tunnels with low overburden. They are challenging to excavate considering their great mechanical and spatial heterogeneity and a very high stiffness contrast within the ground. Terrace deposits are difficult to characterize, considering that samples for laboratory testing are almost unfeasible to obtain, and laboratory tests may not be representative due to scale effects. This paper presents the approach taken for their characterization during the design stage and their posterior validation performed during construction. Lessons learned from several tunnels excavated on terrace deposits on the Bogota-Villavicencio road (central-east Colombia), suggest that based on numerical simulations, laboratory testing and tunnel system behaviour monitoring, an observational approach allows engineers to optimize the excavation and support methods for the encountered ground conditions, resulting in a more economic and safe construction.