1 |
Collaborative Research Group for the Granites around Lake Biwa (1982), Granitic masses around Lake Biwa, Southwest Japan On the granites in the Koga area, J. of The Geol. Soc. of Japan, Vol.88, No.4, pp.289-298
DOI
|
2 |
Hwang, J.-Y. (2003a), Stability Evaluation of Rock Blocks in Tunnels for Observational Method, Chapter 10, Chapter 11, Ph. D. Dissertation, Kyoto University, Kyoto, pp.225-268
|
3 |
Hwang, J.-Y., Ohnishi, Y. and Nishiyama, S. (2002), Key Block Analysis in Tunnel Construction for the Geological Disposal of High-Level Radioactive Waste, Proc. 2nd Japan-Korea Joint Seminar on Geoenv. Engrg., Japan, pp.61-68
|
4 |
Miyamura, M., Yoahida, F., Yamada, N., Sato, T. and Sangawa, A. (1981), Geology of the Kameyama district, Quadrangle Series, Scale 1:50,000, Geol. Surv. Japan
|
5 |
Ohnishi, Y., Nagano, K. and Fujikawa, T. (1985), Evaluation of Stability of Excavated Jointed Rock Mass by Block Theory, J. Geotech. Engrg., JSCE, No.364 / III-4, pp.209-218
|
6 |
Hwang, J.-Y., Sato, M. and Ohnishi, Y. (2004), Quick Evaluation Method for Discontinuity Properties by Vision Metrology for Observational Design and Construction Method in Tunnels, Proc. 33rd Symp. Rock Mechanics, JSCE, pp.187-192
|
7 |
Kimura, K., Yoshioka, T., Imoto, N., Tanaka, S. Musashino, M. and Takahashi, Y. (1998), Geology of the Kyoto-Tohokubu district. With Geological Sheet Map at 1:50,000, Geol. Surv. Japan
|
8 |
Hwang, J.-Y. and Ohnishi, Y. (2003b), New Mechanized Tunneling Method and Its Application to Large Tunnel, Proc. 4th Sym. on Mechanized Tunneling Techniques, KTA, pp.159-174
|
9 |
Goodman, R. E. and Shi, G. H. (1985), Block Theory and Its Application to Rock Engrg., Prentice-Hall
|
10 |
Ohnishi Y. (2002), Keynote Lecture: Numerical Methods and Tunneling, Proc. of the Fourth Int'l Summer Symp., JSCE, Kyoto, Japan, pp.1-21.
|
11 |
Ohnishi, Y. (1999), Survey, Analysis and Evaluation for Dis-continuous Rock Mass, Soil and Foundation, JGS, VoI.47-12, pp.61-62
|
12 |
Hwang, J.-Y., Ohnishi, Y. and Nishiyama, S. (2003c), Removability and Stability Analysis Method of Rock Blocks Considering Discontinuity Persistence in Tunnel Construction, Jour. of the KGS, KGS, pp.39-48
과학기술학회마을
|