A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects (프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로)

  • Sullim Jung;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

Influence of Overseas Construction Business on Construction Companies' Financial Stability (해외건설사업이 건설업체 재무적 안정성에 미치는 영향 분석)

  • Cho, Kyu-Su;Lee, Sang-Hyo;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.43-51
    • /
    • 2013
  • The changes in business structure of domestic construction companies suggest that there is a close relationship between the volume of overseas project and a company's financial condition. Based on this assumption, this study conducts an empirical analysis on a relationship between overseas project and financial stability of a construction company. The ratio of liquidity and liability was used as liquidity index and stability index respectively. The analysis was based on quarterly time-series data between 2000 and 2010. Two models were constructed for the analysis: Model 1 was based on the liquidity ratio and the amount of domestic and overseas construction project; Model 2 was based on the debt ratio and the amount of domestic and overseas construction project. The analysis results showed that the increasing amount of overseas project facilitated short-term financing with greater liquidity, and yet it was not very effective in lowering the debt ratio. This suggests that the dramatic increase in overseas construction project, which is observed recently, is not entirely an optimistic sign.

A Study on Risk Analysis and Relevant Measures for the Successful Performance in Overseas Construction Projects - Including Case Analysis on A Overseas Construction Project - (해외건설 프로젝트의 성공적 수행을 위한 위험요소 및 대처방안에 대한 연구 - 해외건설 사례분석을 포함하여 -)

  • Kim, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.215-250
    • /
    • 2011
  • Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.

  • PDF

A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

THE CAUSES OF BAD PROFIT IN OVERSEAS CONSTRUCTION PROJECTS

  • Seung Heon Han;Du Yon Kim;Sang Hyuk Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1237-1243
    • /
    • 2005
  • International construction projects are exposed to various and complicated risk factors stemming from different political, economical, social, and cultural backgrounds, which make contractors entering into international construction to experience severe losses. It implies that overseas markets do not necessarily secure the high return, which is typically expected to in the high risky attempts. Accordingly, contractors need to evaluate various risk factors faced with overseas construction projects that can possibly aggravate the profitability. This paper aims at establishing a valid groundwork for further research on developing the integrated risk management model. For this end, it analyzes the long-term trend of profitability on total of 3,487 projects performed by Korean global contractors in world-wide construction markets during the last four decades. Then, it investigates the possible factors/causes of bad profit that have affected the profitability significantly through the structured surveys of 90 real overseas projects based on the project-specific information and experiences of Korean contractors in overseas markets. Furthermore, it analyzes relative importance of these factors/causes and identifies the important features expected for the risk management of international construction projects. Finally, vital distinctions between success and failure projects and lessons learned to improve profitability are then distilled.

  • PDF

A study on the Impact of Project Logistics Riskon Overseas Plant Business Performance (프로젝트 물류 리스크가 해외 플랜트 사업성과에 미치는 영향에 관한 연구)

  • Eun-Jin Park;Jin-Ho Oh;Keun-Sik Park
    • Korea Trade Review
    • /
    • v.45 no.2
    • /
    • pp.191-209
    • /
    • 2020
  • Project logistics is becoming increasingly important in overseas plant projects. Efficient logistics risk management is needed to reduce construction period and reduce costs. However, Korean construction firms bid unconditionally without sufficient experience and analysis on overseas plants contract, companies are gradually losing profitability on projects due to not considering profitability. Despite the significant effects on the profitability of Korean construction companies, and although these companies still continue to bid on overseas plant projects, policies to manage project logistics risks for safe transport and compliance with the contracted building schedule in the long term is still lacking. Hence, this study investigates the risk factors related to project logistics and to analyze the effect of project logistics risk on overseas plant business performance. We conducted a survey of project-related workers. The results of the analysis are as follows: First, among the logistics risk factors, overseas platform business people recognize operational risk and financial risk factors, which have a positive effect directly on overseas plant performance. Second, the ability to manage project logistics risks can have a significant impact on the success or failure of overseas plants. Finally, if logistics risk factors are managed on the basis of the research results confirmed through empirical analysis, it is possible to carry out more efficient and effective management of the project, which implies that this will have a positive effect on overseas plant business performance.

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Development of Business Process Model for Overseas Natural Gas Pipeline Project at the Project Planning Phase (해외 천연가스 파이프라인 사업 진출을 위한 사업계획단계 의사결정 프로세스 모델 구축)

  • Sin, Eonill;Han, Seung-Heon;Jang, Woosik;Lee, Yong-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.473-481
    • /
    • 2012
  • Demand of Natural Gas (NG) consumption is continuously increasing by long service life and low environmental impact than other fossil fuels. Because of this reasons, Gas wells exploration and huge LNG plant construction project are being boosted world-widely. Especially, overseas NG pipe-line projects are emerging by considering safe and efficiency at the inter-country sections. At the same time, Korean contractors are being achieved to record-breaking performance at 2011's overseas construction market and 80% of new-record was attained from overseas plant construction projects. Nevertheless, Korean contractors are behind than overseas leading contractors by geographical distance from gas wells and concentrated demand for storage plant. In these reasons, this paper aims to develop the standardized business process model(BPM) for overseas NG pipe-line project at project planning phase to support the project entry. To this aim, first of all, extract the BPM through the broad literature and overseas construction market review and domestic/overseas pipe-line project analysis. Second, Test-bed was performed to confirm of practical applicability by 4 experts. And then 15 experts survey were performed to validate the usability and effectiveness of BPM for overseas NG pipe-line project. Consequently, if Korean contractors are using this BPM with their own know-how and experiences, it will be returned to more reasonable and rational references for decision making in overseas NG pipe-line project.

BRIEF HISTORY OF KOREA'S OVERSEAS CONSTRUCTION: LESSONS AND FUTURE STRATEGY

  • Jong-Hoon Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.862-868
    • /
    • 2005
  • The history of Korea's overseas construction began in 1965, and the cumulative contract amount is about $180 billion over the last 40 years. During the period, Korea's overseas construction industry has played an important role for economic development. However, it seems that the industry is in a sea of trouble. Overseas construction orders have declined due to various reasons such as companies losing confidence, limited financing, lack of competitiveness, and so on. This paper addresses the brief history of Korea's overseas construction industry and the problems that the industry is facing. Then it suggests a few measures for the improvement of the industry.

  • PDF