Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

RELIABLE OPERATION IN COMS GROUND CENTERS

  • Lim, Hyun-Su;Ahn, Sang-Il
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.496-499
    • /
    • 2007
  • The COMS ground segment will operate the geostationary satellite continuously 24h/7days and deliver processed data to end-users with respect to the predefined schedule without delay. For reliable operation, each COMS ground center has internally dual-configuration for critical systems but impossible to every components. Any unexpected failure or regular maintenance to the single configured antenna system may lead the interruption of COMS service and operation. The natural disaster or external attack can destroy one ground center and the operation will be stopped. Therefore COMS program implements backup system remotely located in other centers. Even considering foreign geostationary systems, it's the best solution guaranteeing consistent system operation against internal failure or external disaster.

  • PDF

Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction (초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델)

  • Nam, Chulu;Kwon, Jaebeom;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

A Study on the Way of Operation of EMU in Suwon-Incheon Line (수인선의 전동열차 운영방법에 관한 연구)

  • Kim, Heui-Kon;Oh, Jong-Eop;Lee, Weon-Soon;Shin, Tack-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1859-1870
    • /
    • 2009
  • Suin line is expected to be opened completely in 2015 by three stages. And the line between Suwon and Incheon(54.0km) is under construction to supply the users of southwestern area transportation convenience. The route of Suin line will be constructed to share partly with Ansan line and connect directly with Bundang line to the east and Kyeongin line to the west. That's why a lot of difficulty in train and rolling stock operation IS expected. This paper proposes an alternative plan of train operation when the line is opened partly and completely and makes an optimally alternative plan through the analyses of transportation demand, the change of human resources of operation sector according to train operation plan by an alternative proposal and operation cost.

  • PDF

Optimal Gate Operation and Forecasting of Innundation Area in the Irrigation Reservoir (관개저수지의 최적수문조작과 침수구역 예측)

  • 문종필;엄민용;김태철
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.486-492
    • /
    • 1999
  • One of the purpose of the reservoir operation is minimizing theinnudation area in the downstream reaches during flood period.l To execute the gate operation properly , it requires lots of real-time data such as rainfall, reservoir level, and water level in the downstrea. Gate operation model was developed with the flood discharge obtained from real-time flood forecasting model and the criterion prepared from the past history of gate operation. Water level in the downstream would be increased by the releasing discharge from the spillway and the area of paddy land flooded in a certain detph and time would be estimated usnig GIS map. Gate operation model was applied to the Yedang reservoir, and the flooded area, depth and time in the paddy land was estimaged.

  • PDF

A Technical Review on the Structure Design Criteria for a Catenary System with Maximum Design Speed of 200 km/h (200 km/h급 전차선로 구조강도 설계기준에 관한 기술적 검토)

  • 조용현;이기원;권삼영;최강윤;창상훈
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.273-280
    • /
    • 2001
  • In this study, a comparison between the structural design criteria for a catenary system with the maximum design speed of 100km/h and that of 300km/h was performed in order to establish that of 200km/h. According to the result, catenary design criteria for 300km/h operation is more conservative than that for 100km/h operation. This result shows that higher wind pressure and safety factor are adopted to catenary design for 300km/h operation. So, for the purpose of the economic structural design for catenary system, it is necessary to review the adoption possibility of catenary system for 100km/h operation first. In order to review the adoption possibility for catenary system for 100km/h operation, design criteria for 300km/h operation should be chosen for safer catenary structure.

  • PDF

A study on efficient gate system based RFID at the container terminal

  • Kim, Hyun;Kim, Yul-Seong
    • Journal of Navigation and Port Research
    • /
    • v.30 no.4
    • /
    • pp.277-283
    • /
    • 2006
  • It is a world trend to construct large terminal and develop automated container terminal to attract Super Post-Panamax and provide service which is based on differentiation. In fact, there is insufficient research for automatization of terminal gate since the automatization of current constructed container terminal is only focused on increasing productivity and unmanned system through the automatization of quay, yard, etc. In this paper, we have investigated advantage/disadvantage of existing gate operation systems and compared each gate operation system in the aspect of raising terminal image and the productivity. For the specific study, we have used data from actual terminal gate operation and RFID model business sponsored by MOMAF (Ministry of Maritime Affairs and Fisheries). As a result, this paper carried out an efficient gate operation system and it has been expected that it will be performed as groundwork of automated gate operation system which is for design of container terminal and improvement of gate operation system.

Development of Simulator Scenarios for Manless Operation in Advanced Urban Transit System (차세대도시철도시스템의 무인운영 시뮬레이터 적용을 위한 시나리오 개발)

  • Oh Seh-Chan;Kim Gil-Dong;Park Sung-Hyuk;Lee Hanmin
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1010-1015
    • /
    • 2005
  • Recently, advancements in railway system and IT have enabled automatic or driverless train. Futhermore, developed countries have been tried to develope unmaned operation system for railway system. To apply manless operation in railway system, development of simulator for manless operation is required. The advantage of the simulator is in that it makes it possible to analyze the systems behavior. In this paper, we define system requirements and functionalities, and establish the system scenarios to handle the various accidents/faults in manless operation environment. We expects the proposed system requirements and system scenarios will playa key role to establish the man less operation in advanced urban transit system.

  • PDF