• Title/Summary/Keyword: Number of railway

Search Result 582, Processing Time 0.024 seconds

Development of Preventive Maintenance Plan based on PRA - Case Study of Pansong-Line Railway in Pusan - (위험도평가에 기초한 예방유지관리 계획 - 부산지하철 반송선의 설계 예 -)

  • Kim Jae-Won;Choi Young-Min;Kim Dae-Sung;Kim Kyo-Hun;Park Hyang-Woo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.482-487
    • /
    • 2005
  • In the most current Turn-key bidding and Alternative design, is going to establish maintenance plan along with a economical assessment (VE/LCC assessment etc). Generally, establishment of maintenance plan is based on past experiences that are decided upon sensor position and amount with analytic or mechanical control section. But, it is more reasonable that maintenance plan based on level of significance for Probabilistic Risk, with presuming damage probability assessment of structural fracture scenarios. Therefore, in this study it is considered about the technique that an improved maintenance plan of railroad structures using PRA (Probabilistic Risk Assessment) on the basis of structural reliability theory. For this, in the paper, Preventive maintenance plan based on PRA is suggested with an application example of Pansong-Line (Line number 3) railway in Pusan works that actually executed Turn-key design.

  • PDF

A Study on Harmonic Analysis and Countermeasure at the High Speed Railway Substation (고속전철 변전소의 고조파 분석과 대책에 관한 연구)

  • 김재철;박수만;강창원
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.4
    • /
    • pp.138-143
    • /
    • 2004
  • This paper analyzed harmonics from high speed railway traction to high speed railway substation and provide a reduction method of harmonics using the passive filter. A substation supplies the electric power to a train or can supply the electric power to several trains. According to the number of trains covered by a substation, characteristics of harmonics are investigated. These harmonics affect transformer heating and inductive interference. In order to get rid of the damage from the harmonics, this paper presented minimizing method of harmonics. The proposed method is verified in simulation using the PSCAD/EMTDC.

Development of train/bridge interaction Analysis program Consideration braking (열차 제동하중을 고려한 차량/교량 상호 작용 해석기법 개발)

  • Yun hee sub;Kim Man-Cheol;Han sang chel
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1177-1183
    • /
    • 2005
  • This paper presents the effects of dynamic response of the railway bridge through the suspension system when the train is moving with uniform speed and non-uniform speed Railway bridges are subjected to dynamic loads generated by the interaction between moving vehicles and the bridge structures. these dynamic loads result in response fluctuation in bridge members. To investigate the real dynamic behavior of the bridge, a number of analytical and experimental investigation should be carried out. This paper, a train/bridge interaction analysis program considerate braking action. New scheme consideration of braking action on the bridge using speed-dependent braking function is presented. This program also used torsional degree of freedom and constraint equation based on geometrical relationship in order to take into consideration three-dimensional eccentricity effect due to the operation on double track through quasi three-dimensional analysis.

  • PDF

The Parallel Operation of AC to DC PWM Converters for a High Speed Railway Train (고속전철용 입력 AC/DC PWM 컨버터의 병령운전)

  • Ryu, Hong-Je;U, Myeong-Ho;Kim, Jong-Su;Im, Geun-Hui;Won, Chung-Yeon
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.49 no.4
    • /
    • pp.272-281
    • /
    • 2000
  • This paper deals with the parallel operation of several numbers of PWM converters for a high speed railway train application. Several considerations are made to reduce the transformer interaction which can cause a current control problem in severe case. Also, in this paper, novel control strategy is proposed to achieve a harmonic free primary-side current control under a light load condition using one current sensor independent of the number of converters. In addition, the modified predictive current controller, which is suitable to a digital current controller with a relatively large sampling period, is used. Finally, to verify the system validity, digital control system with TMS320C44 micro-processor and small scale simulator are made and tested.

  • PDF

KTX Impact on Train Operation Pattern (An Empirical Analysis) (서울-천안 구간의 열차운행패턴 분석과 시사점)

  • Kim Kyoung-Tae;Lee Jin-Sun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.1047-1053
    • /
    • 2005
  • This study explored pattern of train operation between Seoul Cheonan after the introduction of KTX in 2004. Both number of trains and seat capacity per day have increased but maximum number of trains per specific hour hasn't changed much. Demand for train shows that it concentrated in a specific time, so number of trains during the peak hour should be increased. But, it is difficult due to line capacity, so increasing seat capacity per train might be an option. An increase in seat capacity should be considered the characteristics of each train lines.

  • PDF

A study on the rock-support behavior due to railway tunnel excavation (철도터널 굴착에 의한 암반과 지보재의 거동에 관한 연구)

  • Kim Sun-Kon;Park Jong-Kwan;Jung In-Chul;Lee Seung-Do
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1077-1082
    • /
    • 2004
  • With increasing the number of tunnel constructions, more reliable analysis methods for tunnel excavation is needed to accomplish technically sound design, and stable and economical constructions. For this purpose, a series of construction procedures, which include excavation and support stages of tunneling, need to be considered. In this study, therefore, rock-support response behavior due to railway tunnel construction has been examined by using analytic methods and numerical calculations. For examining rock-support response behavior, the effects of shotcrete, thickness and time of installation have been considered. Through analytic and numerical calculations, it is shown that support pressure becomes higher with increasing the shotcrete thickness and stiffness, and hence the tunnel deformation tends to be stable. It is also important to notice that there is a significant effect of shotcrete installation time on the tunnel deformation, although no significant change in support pressure is observed.

  • PDF

An Enumeration Algorithm for the Rolling Stock Requirement Plan (철도차량소요계획을 위한 열거알고리듬)

  • Kim Seongho;Kim Dong-Hee;Choi Tae-Sung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.514-521
    • /
    • 2004
  • A routing is the path that an actual train set follows as it moves from one train to another train in a timetable. The number of routings is equivalent to the number of trainsets required to cover the timetable. The primary factors of rolling stock requirement plan include evaluating the minimum number of routings. This can be formulated as a set partitioning problem and solved using enumeration method or column generation method. In this paper we presents an enumeration algorithm which is useful to implement the enumeration method for the rolling stock requirement plan.

  • PDF

A Study on the Energy Saving Strategy in Electric Railway System (직류 전기철도 에너지 절감방안 연구)

  • Choi Byung-Woon;Chang Sang-Hoon;Kim Hak-Ryun
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.676-681
    • /
    • 2005
  • The regenerative braked cars are being introduced in DC electric railway for energy saving. There has been a recent tendency for DC traction substation with regenerative inverter to increase in number. This is strongly related to the desire for effective utilization of electric power regenerated by DC electric cars and to the aim ensuring stable operation of regenerative braking system. The regenerative inverters DC power feed back from a generative car into AC power at a substation and supplies it to distribution lines. This paper suggest the result of characteristic analysis and capacity simulation. economical analysis in the regenerative inverter system.

  • PDF

A Possible Test Method Proposed for Resilient Modulus (MR) and Analysis of Correlation between Resilient Modulus and Shear Modulus of Track Subgrade Soil (흙노반재료의 회복탄성계수(MR) 결정을 위한 반복삼축압축시험법 제시 및 변형계수 상관성 분석)

  • Park, Jae Beom;Choi, Chan Yong;Lim, Sang Jin;Lim, Yu Jin
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.85-98
    • /
    • 2017
  • In general, under the repetitive dynamic load generated by rail cars running on the track, subgrade soil experiences changes of stress conditions such as deviatoric stress (${\sigma}_d$) and bulk stress (${\theta}$). Due to the repetitive change of deviatoric stress (${\sigma}_d$) with number of loadings, the resilient modulus ($M_R$) can be obtained by using the measured resilient strain (${\varepsilon}_r$) after a sufficient number of loadings. At present, no plausible and unified test method has been proposed to obtain the resilient modulus of railway track subgrade soil. In this study, a possible test method for obtaining the resilient modulus ($M_R$) of railway track subgrade soil is proposed; this test, by utilizing repetitive triaxial compression testing, can consider all the important parameters, such as the confining stress, deviatoric stress, and number of loadings. By adapting and using the proposed test method to obtain $M_R$, $M_R$ values for compacted track subgrade soil can be successfully determined using soil obtained in three field sites of railway track construction with changing water content range from OMC. In addition, shear modulus (G) ~ shear strain (${\gamma}$) relation data were also obtained using a mid-size RC test. A correlation analysis was performed using the obtained G and $M_R$ values while considering the strain levels and modes of strain direction.

3D simulation of railway bridges for estimating fundamental frequency using geometrical and mechanical properties

  • Moazam, Adel Mahmoudi;Hasani, Nemat;Yazdani, Mahdi
    • Advances in Computational Design
    • /
    • v.2 no.4
    • /
    • pp.257-271
    • /
    • 2017
  • There are many plain concrete arch bridges in Iran that have been used as railway bridges for more than seventy years. Owe to the fact that these bridges have not been designed seismically, and even may be loaded under high-speed trains, evaluation of fundamental frequencies of the bridges against earthquake and high-speed train vibrations is necessary for considering dynamics effects. To evaluate complex behavior of these bridges, results of field tests are useful. Since it is not possible to perform field tests for all arch bridges, these structures should be simulated correctly by computers for structural assessment. Several parameters are employed to describe the bridges, such as number of spans, length of spans, geometrical and material properties. In this study, results of field tests are used for modal analysis and adapted for 64 three dimensional finite element models with various physical parameters. Computer simulations show length of spans has important effect on fundamental frequencies of plain concrete arch bridge and modal deformations of bridges is in longitudinal and transverse directions. Also, these results demonstrate that fundamental frequencies of bridges decrease after increasing span length and number of spans. Plus, some relations based in the number of spans (n) and span length (l) are proposed for calculation of fundamental frequencies of plain concrete arch bridge.