• 제목/요약/키워드: Nuclear Power Plants (NPP)

검색결과 229건 처리시간 0.025초

PROCEDURE FOR APPLICATION OF SOFTWARE RELIABILITY GROWTH MODELS TO NPP PSA

  • Son, Han-Seong;Kang, Hyun-Gook;Chang, Seung-Cheol
    • Nuclear Engineering and Technology
    • /
    • 제41권8호
    • /
    • pp.1065-1072
    • /
    • 2009
  • As the use of software increases at nuclear power plants (NPPs), the necessity for including software reliability and/or safety into the NPP Probabilistic Safety Assessment (PSA) rises. This work proposes an application procedure of software reliability growth models (RGMs), which are most widely used to quantify software reliability, to NPP PSA. Through the proposed procedure, it can be determined if a software reliability growth model can be applied to the NPP PSA before its real application. The procedure proposed in this work is expected to be very helpful for incorporating software into NPP PSA.

A review of missing video frame estimation techniques for their suitability analysis in NPP

  • Chaubey, Mrityunjay;Singh, Lalit Kumar;Gupta, Manjari
    • Nuclear Engineering and Technology
    • /
    • 제54권4호
    • /
    • pp.1153-1160
    • /
    • 2022
  • The application of video processing techniques are useful for the safety of nuclear power plants by tracking the people online on video to estimate the dose received by staff during work in nuclear plants. Nuclear reactors remotely visually controlled to evaluate the plant's condition using video processing techniques. Internal reactor components should be frequently inspected but in current scenario however involves human technicians, who review inspection videos and identify the costly, time-consuming and subjective cracks on metallic surfaces of underwater components. In case, if any frame of the inspection video degraded/corrupted/missed due to noise or any other factor, then it may cause serious safety issue. The problem of missing/degraded/corrupted video frame estimation is a challenging problem till date. In this paper a systematic literature review on video processing techniques is carried out, to perform their suitability analysis for NPP applications. The limitation of existing approaches are also identified along with a roadmap to overcome these limitations.

UAE원전 화재방호계통 설계특성과 화재방호규제 개선 필요성 연구 (A Study on the Needs to Improve the Regulations and the Design Features of Fire Protection for UAE Nuclear Power Plants)

  • 마진수;이의평
    • 한국화재소방학회논문지
    • /
    • 제25권5호
    • /
    • pp.54-61
    • /
    • 2011
  • UAE(United Arab Emirates) 원전(원자력발전소)의 수출을 목적으로 UAE, 미국, 일본, 한국의 원전 화재방호규정을 상호 비교 검토하였다. UAE를 포함하여 미국, 일본의 원전 화재방호규정은 화재하중에 따른 화재위험도 분석결과에 따라 소화설비를 설치하도록 규정하고 있다. 반면, 우리나라는 소방관계법에서 원전을 발전시설로 구분하고 있으나, 원자력법에서는 원자로 및 관계시설로 분류하고 있고, 각 법률간 화재방호 설계기준도 상이하다. 앞으로 우리나라가 원전 수출국의 지위를 계속적인 유지하기 위해서는 화재 위험도분석의 결과가 설계에 반영될 수 있어야 한다. 결론으로, 국내 소방관계법이 원전의 특수성을 반영하기 위해서는 소방시설공사업법 시행령 제2조 2항의 성능위주설계를 해야 할 특정소방대상물에 원전이 추가되어야 함을 제안하였다.

지반-구조물 상호작용 효과를 고려한 지진격리시스템이 적용된 원전 격납건물의 지진 취약도 평가 (Seismic Fragility Evaluation of Isolated NPP Containment Structure Considering Soil-Structure Interaction Effect)

  • 임승현;정형조;김민규;최인길
    • 한국지진공학회논문집
    • /
    • 제17권2호
    • /
    • pp.53-59
    • /
    • 2013
  • Several researches have been studied to enhance the seismic performance of nuclear power plants (NPPs) by application of seismic isolation. If a seismic base isolation system is applied to NPPs, seismic performance of nuclear power plants should be reevaluated considering the soil-structure interaction effect. The seismic fragility analysis method has been used as a quantitative seismic safety evaluation method for the NPP structures and equipment. In this study, the seismic performance of an isolated NPP is evaluated by seismic fragility curves considering the soil-structure interaction effect. The designed seismic isolation is introduced to a containment building of Shin-Kori NPP which is KSNP (Korean Standard Nuclear Power Plant), to improve its seismic performance. The seismic analysis is performed considering the soil-structure interaction effect by using the linearized model of seismic isolation with SASSI (System for Analysis of Soil-Structure Interaction) program. Finally, the seismic fragility is evaluated based on soil-isolation-structure interaction analysis results.

신규원전 여유도 관리 방안 연구 (A Study on the method of Margin Management for New Nuclear Power Plant)

  • 박유진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.151-152
    • /
    • 2018
  • In the domestic nuclear power industry, concern about safety of nuclear power plants is continuously increased with the Fukushima nuclear power plant accident. In order to enhance the safety of nuclear power plants, it is important to ensure that the power plants are operating with proper margin within the original design bases. Margin management is the process of ensuring that the NPP designer and operator are aware of the physical and operating limits, and potential and probability of failure, for each component in the plant. All components are subject to margin considerations, but the most important components by scope and attention are those related to safety-related systems and NPP safe shutdown.

  • PDF

플랜트 EPC 기업의 해외 원자력 발전 프로젝트 진출방안 (Penetration of Korean EPC Companies into International Market for Nuclear Power Plant)

  • 조찬형;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권3호
    • /
    • pp.66-73
    • /
    • 2009
  • This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.

  • PDF

원전용 비상디젤발전기 국외 손상사례 분석에 관한 연구 (A Study on the Analysis of Failures Related to Emergency Diesel Generators in Overseas Nuclear Power Plants)

  • 장정환;김진성;정해동;조권회
    • 한국압력기기공학회 논문집
    • /
    • 제5권1호
    • /
    • pp.32-37
    • /
    • 2009
  • The emergency diesel generator (EDG) in a nuclear power plant (NPP) shall start within 10 secondss and supply electrical power to engineered safety features within one minute and less if a loss of offsite power (LOOP), A design-basis event, or their combination occur. Each NPP has an EDG set consisting of two diesel generators for redundancy. In addition to the EDG set, an alternate Alternating Current Diesel Generator (AAC DG) is installed and shared by several units to cope with a station black out (SBO), i.e., loss of the offsite power concurrent with reactor trip and unavailability of the EDG set. The objective of this study is to analyze the failure data of emergency diesel generators reported in overseas nuclear power plants.

  • PDF

Human resource development and needs analysis for nuclear power plant deployment in Nigeria

  • Egieya, Jafaru M.;Ayo-Imoru, Ronke M.;Ewim, Daniel R.E.;Agedah, Ebisomu C.
    • Nuclear Engineering and Technology
    • /
    • 제54권2호
    • /
    • pp.749-763
    • /
    • 2022
  • The fulcrum of economic development is a sustainable supply of electricity. Nigeria is plagued with blackouts, with one of the lowest per capita electricity consumption in the world (circa. 120 kWh per capita). Hence, policies have been instigated to integrate electricity generation from nuclear power plants (NPP) on or before 2027. However, a critical requirement for NPP generation is the implementation of robust human resource development (HRD) programs. This paper presents the perspective of Nigeria in assessing human resources needs over the entire NPP lifecycle following the milestone approach and employing the IAEA's Nuclear Power Human Resource (NPHR) modeling tool. Three workforce organizations are in focus including the owner/operator, regulators, and construction workers following three decades timeframe (2015-2045). The results indicate that for the study period, a maximum of approximately 9045 personnel (73% construction workers, 24% owner/operator, and 3% regulators) should be directly involved in the NPP program just before the commissioning of the third NPP in 2033. However, this number decreases by about 73% (2465 personnel including 94% operator and 6% regulator) at the end of the study timeframe. The results can potentially provide clarity and guidance in HRD decision-making programs.

Choosing an optimal connecting place of a nuclear power plant to a power system using Monte Carlo and LHS methods

  • Kiomarsi, Farshid;Shojaei, Ali Asghar;Soltani, Sepehr
    • Nuclear Engineering and Technology
    • /
    • 제52권7호
    • /
    • pp.1587-1596
    • /
    • 2020
  • The location selection for nuclear power plants (NPP) is a strategic decision, which has significant impact operation of the plant and sustainable development of the region. Further, the ranking of the alternative locations and selection of the most suitable and efficient locations for NPPs is an important multi-criteria decision-making problem. In this paper, the non-sequential Monte Carlo probabilistic method and the Latin hypercube sampling probabilistic method are used to evaluate and select the optimal locations for NPP. These locations are identified by the power plant's onsite loads and the average of the lowest number of relay protection after the NPP's trip, based on electricity considerations. The results obtained from the proposed method indicate that in selecting the optimal location for an NPP after a power plant trip with the purpose of internal onsite loads of the power plant and the average of the lowest number of relay protection power system, on the IEEE RTS 24-bus system network given. This paper provides an effective and systematic study of the decision-making process for evaluating and selecting optimal locations for an NPP.

뉴스초점 - 원자력 발전소 계측제어 시스템 (Instrumentation and Control Systems for Nuclear Power Plants)

  • 구인수
    • 기술사
    • /
    • 제43권2호
    • /
    • pp.45-52
    • /
    • 2010
  • At the end of last year, Korean nuclear power plants, APR-1400 and a research reactor have been contracted to build plants at United Arab Emirates and Jordan. Since 1959, a historical background of nuclear technologies in Korea is summarized. The safety requirements for Instrumentation and Control (I&C) systems in Nuclear Power Plants (NPP) are discussed. Specific descriptions on the typical safety classification of I&C systems, the definitions of the electrical class 1E and the countermeasures against common caused failures are provided. And summaries of typical I&C systems such as the protection systems, the control systems, the instrumentations, the monitoring systems and a control room in NPP are introduced. Strict requirements on the development of the digital computer systems in nuclear applications are described.

  • PDF