Evaluation Methodology of Remote Dismantling Equipment for Reactor Pressure Vessel in Decommissioning Project

  • Hyun, D.J.;Choi, B.S.;Jeong, K.S.;Lee, J.H.;Kim, G.H.;Moon, J.K.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • 제1권1호
    • /
    • pp.83-92
    • /
    • 2013
  • A novel methodology to evaluate remote dismantling equipment for a reactor pressure vessel (RPV) in a decommissioning project is presented in this paper. The remote dismantling equipment, mainly composed of cutting tools and positioning equipment, is absolutely required to cut and handle highly radioactive and large components in nuclear power plants (NPPs); this equipment has a great effect on the overall success of the decommissioning project. Conventional evaluation methods have only focused on cutting technologies or positioning equipment, although remote dismantling equipment cannot achieve its goal without organic interaction between the cutting tools and the positioning equipment. In this paper, the cutting tools and the positioning equipment are evaluated by performance parameters according to their original characteristics, the relationship between the two systems, and common factors. Finally, the remote dismantling equipment used in recent decommissioning projects has been evaluated based on the proposed methodology. The results of this paper are expected to be useful for future decommissioning projects.

미국의 원전 해체관련 부지특성 및 최종상태 조사를 위한 방사성 오염 핵종 결정 방법에 대한 분석 (A Radionuclides Suite Selection for Site Characterization and Final Status Survey in the U.S. NPPs)

  • 조붕비;전여령;김용민;이종세;안석영
    • 방사성폐기물학회지
    • /
    • 제14권3호
    • /
    • pp.267-277
    • /
    • 2016
  • 노후 원전 해체의 경우 부지 특성 및 최종 상태 조사 보고서에 해당 부지내 잔존가능성이 있는 방사성 핵종 정보에 대한 내용을 포함하여야 한다. 미국 NRC의 경우 이에 해당하는 해체기술관련문서(DTBD)를 부지 특성 조사시에 부지이력조사(HSA)와 같이 사업자 측이 제출하도록 규제하고 있다. 또한 해체기술관련문서는 방사선학적 부지 조사와 해체완료계획서에 포함되어야 하는 내용으로써 부지 규제 해제와 재이용에 관해서 중요한 자료를 제공한다. 이 논문은 부지 별 잠재적 핵종에 대해 미국 원전의 해체 사례중 부지 특성 및 최종 상태조사 과정에서 결정하는 방법론을 분석하고 2017년 고리 1호기의 영구 운전정지 후 이루어질 해체 과정에 필수적인 규제 지침과 기술적 근거 수립에 도움이 되고자 한다.

원전 해체 방사성 콘크리트 폐기물 최소화를 위한 생물학적 차폐체 제거 및 처분 전략 (The Dismantling and Disposal Strategy of a Biological Shield for Minimization of Radioactive Concrete Waste During Decommissioning of a Nuclear Power Plant)

  • 전철승;김창락
    • 방사성폐기물학회지
    • /
    • 제15권4호
    • /
    • pp.355-367
    • /
    • 2017
  • 2017년 6월에 영구정지 된 고리 1호기의 해체는 한국의 상업 원전에 대한 첫 해체 사례가 될 것이다. 해체 과정 중에 발생하는 폐기물에 대한 처분은 전체 해체 비용의 많은 부분을 차지한다. 따라서 방사화 및 오염된 콘크리트 구조물은 적절한 해체전략을 수립하여 경제적이고 안전하게 해체되어야 한다. 본 논문에서는 생물학적 차폐체에 대한 최적화된 해체 및 처분 시나리오를 연구하였다. 해체사례, 폐기물 처분 규정 및 처리 기술을 분석하였다. 그리고 생물학적 차폐체 제거 과정의 폐기물 발생량을 최소화하기 위해서, 최적 해체 시나리오를 제시하였고 폐기물 처분 방안을 도출하였다.

고리 1호기 원자로 압력용기 절단과 포장 방법에 따른 처분 물량 산정 (Evaluation on Radioactive Waste Disposal Amount of Kori Unit 1 Reactor Vessel Considering Cutting and Packaging Methods)

  • 최유정;이성철;김창락
    • 방사성폐기물학회지
    • /
    • 제14권2호
    • /
    • pp.123-134
    • /
    • 2016
  • 최근 국내에서는 월성 1호기 및 고리 1호기를 포함하여 운영 중인 원자력발전소가 노후화함에 따라 원전 해체에 대한 관심이 많이 증대되고 있다. 이와 관련하여 월성 1호기의 계속운전이 최근 결정되었으며, 고리 1호기의 경우 2017년 6월 영구정지하기로 결정되었다. 이에 본 논문에서는 상업용 원자로로서는 국내 최초로 해체가 예정된 고리 1호기에 대해, 원자로 압력용기 자체의 해체로 인해 발생하는 방사성폐기물 최종 처분량을 원자로 압력용기 절단 방법 및 방사성폐기물 처분용기를 고려하여 산정하였다. 처분용기를 고려한 방사성폐기물 처분량을 산정한 결과 원자로 압력용기 몸통 부위보다는 반구 형태의 헤드 부분을 작게 절단할수록 최종 처분량이 감소하는 것으로 예측되었다. 또한 경주 방폐장의 200 L 및 320 L 드럼 처분용 처분용기의 경우 무게 제한으로 인해 적재효율이 좋지 못한 것으로 나타났다.

Proposal for the list of potential radionuclides of interest during NPP site characterization or final status surveys

  • Seo, Hyung-Woo;Oh, Jae Yong;Shin, Weon Gyu
    • Nuclear Engineering and Technology
    • /
    • 제53권1호
    • /
    • pp.234-243
    • /
    • 2021
  • In the research or project planning for the decommissioning of a nuclear power plant, one of several preparations will be the establishment of a list of potential radionuclides to be considered at the time of characterization or final status surveys. Reliable data for selection of potential radionuclides during the transition period to prepare for decommissioning will depend heavily on historical data at the site or, where possible, sampling analysis. However, during the transition period, direct sampling can be challenging, depending on the circumstances of the site or national regulation. A methodology of selecting potential radionuclides for nuclear facility sites which largely consists of three major processes: production of initial list of radionuclides, selection of the insignificant radionuclide that will be eliminated, and consideration of site characterization or sampling. For developing a preliminary list of potential radionuclides for Kori Unit 1 decommissioning, the list of initial radionuclides was made referring to the technical documents applied at decommissioned NPPs in the U.S and additional reference materials applied until the operation of NPPs in Korea. For the screening of insignificant radionuclides, we applied criterion of less than 0.1% of the amount of radioactivity inventory and confirmed the dose fraction using the RESRAD code. The final suit of radionuclides was established, which should be supplemented by reflecting site characterization and sampling process in the future. Thus, the methodology and results for the selection of potential radionuclides suggested in this paper can give an insight as a future reference to deriving DCGLs in relation to site remediation of decommissioning nuclear plants.

Application of Logistic Simulation for Transport of SFs From Kori Site to an Assumed Interim Storage Facility

  • Kim, Young-Min;Kim, Chang-Lak
    • 방사성폐기물학회지
    • /
    • 제19권1호
    • /
    • pp.61-74
    • /
    • 2021
  • A paradigm shift in the government's energy policy was reflected in its declaration of early closure of old nuclear plants as well as cancellation of plans for the construction of new plants. To this end, unit 1 of Kori Nuclear Power Plant was permanently shut down and is set for decommission. Based on these changes, the off-site transport of spent fuels from nuclear power plants has become a critical issue. The purpose of this study is to develop an optimized method for transportation of spent fuels from Kori Nuclear Power Plant's units 1, 2, 3, and 4 to an assumed interim storage facility by simulating the scenarios using the Flexsim software, which is widely used in logistics and manufacturing applications. The results of the simulation suggest that the optimized transport methods may contribute to the development of delivery schedule of spent fuels in the near future. Furthermore, these methods can be applied to decommissioning plan of nuclear power plants.