Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.9
/
pp.81-86
/
2007
Electric utility companies have the responsibility of providing good electricity for their customers. They have introduced the DAS(Distribution Automation System) to automate the power distribution networks. DAS engineers require state-of-the-art applications, such as a way to actively manage the distribution system and gain economic benefits from a flexible DAS architectural design. The existing DAS is not capable of handling these needs. It requires operator intervention whenever feeder overloading is detected while operator error could cause the feeder overload area to be extended. It also utilizes a closed architecture and it is therefore difficult to meet the system migration and future enhancement requirements. This paper represents a web based, platform-independent, flexible DAS architectural design and active database application. Recent advanced Internet technologies are fully utilized in this new DAS architecture allowing it to meet the system migration and future enhancement requirements. By using an active database, the DAS can minimize the feeder overloading area in the distribution system without operator intervention, thereby minimizing mistakes due to operator error.
The Performance of a PEMFC stack is strongly dependent on the uniform reactants distribution on MEA. The uniform distribution can be achieved by flow-field pattern and manifold design optimized to satisfy operating conditions. This paper investigates uniform reactants distribution in channels by changing manifold shape and inlet mass flow rate. Typical U and Z shape and modified U and Z shape manifolds with buffer zone were designed. To check the uniform reactants distribution, standard deviation of mass flow rate was compared. The numerical results show that the inlet mass flow rate, inlet shape, and manifolds shape are critical factor for uniform distribution.
There are three methods for analyzing flow and pressure distribution in looped water distribution networks (the loop method, the node method, the element method) taking into consideration hydraulic parameters chosen as unknown. For all these methods the non-linear system of equations can be solved by iterative procedures. The paper presents a different approach to this problem by using the method of variational formulations for hydraulic analysis of water distribution networks. This method has the advantage that it uses a specialized optimization algorithm which minimizes directly an objective multivariable function without constraints, implemented in a computer program. The paper compares developed method to the classic Hardy-Cross method. This shows the good performance of the new method.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.26
no.6
/
pp.47-52
/
2012
DAS(Distribution Automation System) is equipped with several software applications such as service restoration, loss minimization, and protective relay coordination. The software applications of DAS are very sensitive to the amount of section load being carried by a particular section of distribution lines. Moreover, each software application requires a different parameter of the section load according to its purpose. Therefore, This paper proposes a new section load management method using real-time measurement data of the distribution lines. In order to provide accurate data to DAS applications, this method considers section loads in terms of the relationship of power versus time. In order to establish that the proposed method is feasible, a performance-testing simulator was developed, and case studies were conducted for a modified real distribution network.
Journal of The Korean Society of Agricultural Engineers
/
v.56
no.1
/
pp.11-20
/
2014
Many classification studies for the community of densely-connected nodes are limited to the comprehensive analysis for detecting the communities in probabilistic networks with nodes and edge of the probabilistic distribution because of the difficulties of the probabilistic operation. This study aims to use convolution method for operating nodes and edge of probabilistic distribution. For the probabilistic hierarchy network with nodes and edges of the probabilistic distribution, the model of this study detects the communities of nodes to make the new probabilistic distribution with two distribution. The results of our model was verified through comparing with Monte-carlo Simulation and other community-detecting methods.
The automobile industry in Korea has grown to the fifth in the world in terms of production capacity. In spite of the production growth, the marketing aspects such as distribution and customer service in the auto industry are still behind the world-class. Thus, the major purposes of this paper are as follows. The first is to analyze competitive structure of the industry and to compare distribution strategies of the major auto firms(Hyundai, Daewoo, and Kia). The second is to theoretically explain the transition from the vertical marketing system to the dealer system using transaction cost analysis. The third is to compare auto distribution channels in Korea with those in the U.S. and Japan. Finally, an optimal channel stucture in the auto industry is suggested after reviewing five alternative channel structures such as corporate-owned VMS, sales-specializing firm, multiplex system(VMS+limited dealer system), dual sales channel, and advanced dealer system. In the short-run, sales-specilizing firm was suggested as an optimal channel system to enhance customer satisfaction by integrating sales and customer service. In the long-run, advanced dealer system through regional differentiation was desirable for an optimal channel structure by organically integrating new car sales, used car sales, and after service to provide total marketing service to customers.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.6
/
pp.692-698
/
1999
This paper analyzes the effect of DGS(Dispersed Generation System) on the voltage regulation of the traditional distribution system of which the voltage is controlled by the bank LDC(Line Drop Compensator). Through the simulation results for 22.9kV class distribution system with DGSs, some general relationships among the operating power factor and introduction limit of DGS, and the sending-end reference voltage determined by internal setting coefficients of the LDC are derived. Those relationships are that the introduction limit of DGS increases as the power factor of DGS goes from lagging to leading and also as the allowance of the sending-end reference voltage increases. From the relationships, a operation method of the power distribution system integrated with DGSs is proposed from the view point of the operating power factor of DGS and new voltage regulation method.
The objective of this study is to evaluate properly reliability of underground distribution system taking into account domestic circumstance. Interruption time and number of interruption customer by distribution system based on actual condition in domestic utility are considered as important index to estimate reliability of underground distribution system. This paper presents evaluation results regarding the reliability of an underground distribution system using a model system as new urban area, evaluation results which is established whether automatic system is introduced or not are shown in detail.
The well-known standard normal distribution has been used within the limit of standard variable value of u=3.59. However, the probability values above the limit are not given in the literature. In this study, a probability computation program for standard normal distribution to u=5.99 with the proportional normal distribution a, pp.oximation suggested by Abramowitz and Stegun, Hastings is developed. The new standard normal distribution table developed by the program is presented and will be of help to estimate of probability values for testing and estimation of process mean value, lot acceptable probability, defective percentage of PPM unit of an out-of specification limit, process capability, test power of control charts, probability and statistics.
A commodity distribution problem with intertemporal storage facilities and dynamic transportation networks is proposed. mathematical integer programming methods and multiobjective programming techniques are used in the model formulation. Dynamic characteristics of commodity distribution problems are taken into account in the model formulation. storage facility location problems and transportation link addition problems are incorporated into the intertemporal multicommodity distribution problem. The model is capable of generating the most efficient and rational commodity distribution system. Therefore it can be utilized to provided the most effective investment plan for the transportation infrastructure development as well as to evaluate the existing commodity distribution system. The model determines simultaneously the most efficient locations, sizes, and activity levels of storage facilities as well as new highway links. It is extended to multiobjective planning situations for the purpose of generating alternative investment plans in accordance to planning situations. sine the investment in transportation network improvement yields w\several external benefits for a regional economy, the induced benefit maximization objective is incorporated into the cost minimization objective. The multiobjective model generates explicitly the trade-off between cost savings and induced benefits of the investment in transportation network improvement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.