• Title/Summary/Keyword: Network RTK Survey

Search Result 39, Processing Time 0.023 seconds

Development of GNSS Field Survey System for Effective Creation of Survey Result and Enhancement of User Convenience (효과적인 측량 성과물 작성 및 사용자 편의성 강화를 위한 GNSS 현장 측량시스템 개발)

  • Park, Joon Kyu;Kim, Min Gyu
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.35 no.3
    • /
    • pp.203-210
    • /
    • 2017
  • Korea has established an advanced infrastructure for real-time precise positioning such as CORS, virtual reference station service and perform continuous upgrading. However, in order to utilize the national infrastructure, it is necessary to process the acquired spatial information and take many steps to derive the final product. In addition, this process is highly dependent on foreign software. In this study, GNSS field survey system was developed and evaluation of its usability was performed. Real-time GNSS field survey system was developed and the system improves user̓s convenience and usability. The system was able to conduct survey effectively and produce the results. In addition, we compare the existing software with the survey performance to show the availability of the real-time GNSS surveying system. The system developed through the research can perform all the functions from real-time survey to the production of the outputs. It can create economical added value of the foreign software as a whole and simplify the work required for post-survey performance.

Usefulness Assessment of VRS for Topographic Surveying (지형현황측량을 위한 VRS 방식 GPS의 활용성 평가)

  • Yun, Hee-Cheon;Lee, Je-Jung;Kim, Min-Gyu
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.13 no.2
    • /
    • pp.21-28
    • /
    • 2010
  • The classical RTK System requires that GPS data is transmitted from a single reference receiver to one or more roving units. But its error increase due to distance between reference and rover. VRS(Virtual Reference Station) system, a network of reference stations can be used to isolate the components of these systematic errors and use the resultant corrections to create Virtual Reference Stations at any location within the network. Use of a VRS significantly reduces the effects of systematic errors and improved accuracy. In this study, Network-RTK survey using VRS serviced by NGII(National Geographic Information Institute) was performed and the results were compared with results of total station surveying and notified coordinates of cadastral control points for utilization assessment of VRS.

DATUM PROBLEM OF NETWORK-BASED RTK-GPS POSITIONING IN TAIWAN

  • Yeh, Ta-Kang;Hu, Yu-Sheng;Chang, Ming-Han;Lee, Zu-Yu;Liou, Yuei-An
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.90-94
    • /
    • 2007
  • The conventional single-reference station positioning is affected by systematic errors such as ionospheric and tropospheric delay, so that the rover must be located within 10 km from the reference station in order to acquire centimeter-level accuracy. The medium-range real-time kinematic has been proven feasible and can be used for high precision applications. However, the longer of the baseline, the more of the time for resolving the integral ambiguity is required. This is due to the fact that systematic errors can not be eliminated effectively by double-differencing. Recently, network approaches have been proposed to overcome the limitation of the single-reference station positioning. The real-time systematic error modeling can be achieved with the use of GPS network. For expanding the effective range and decreasing the density of the reference stations, Land Survey Bureau, Ministry of the Interior in Taiwan set up a national GPS network. In order to obtain the high precision positioning and provide the multi-goals services, a GPS network including 66 stations already been constructed in Taiwan. The users can download the corrections from the data center via the wireless internet and obtain the centimeter-level accuracy positioning. The service is very useful for surveyors and the high precision coordinates can be obtained real time.

  • PDF

Accuracy Analysis of FKP for Public Surveying and Cadastral Resurvey (공공측량 및 지적재조사 사업 적용을 위한 FKP 정밀도 분석)

  • Park, Jin Sol;Han, Joong-Hee;Kwon, Jay Hyoun;Shin, Han Sup
    • Spatial Information Research
    • /
    • v.22 no.3
    • /
    • pp.23-24
    • /
    • 2014
  • NGII (National Geographic Information Institute) has been providing VRS (Virtual Reference Station) service so that could determine precise positioning in real time since 2007. However, since the VRS service has to maintain the connected status with VRS server, the number of users who can use VRS service are limited by capacity of VRS server. To solve this problem, NGII has been providing FKP (Virtual Reference Station) service using one way telecommunication from November 1, 2012. Therefore, it is predicted that the usage of FKP service will increase in public surveying and cadastral resurveying in the future. However, the studies with respect to analysis of FKP precision for applying to public surveying and cadastral resurveying is not conducted enough. In this study, to analyse the application possibility of FKP on the public surveying and cadastral resurveying, the two kind analysis were performed. First is the analysis of accuracy according to the configuration of reference station of FKP and VRS. One is consisted of same reference stations, another is consisted of different reference stations. Second is the accuracy anlalysis of horizontal and vertical positioning acquiring VRS and FKP data in various measurement environment based on VRS regulation. Result of first study, Positioning accuracy according to the configuration of the reference stations satisfies related regulation. However, accuracy of FKP in case of different reference stations is worse than in case of same reference stations.. The result of second test shows that the horizontal precision of FKP and VRS in good measurement environment satisfy the allowed precision. However, in some case, horizontal precision of FKP and VRS in poor measurement environment exceed the allowed precision. In addition, the number of exceeding the allowed precision in the FKP is more than the VRS. The vertical precision of the VRS satisfy related work provision. In conclusion, the result of this study shows that the FKP only in open area should be used for public survey and cadastral resurvey. Therefore the additional studies with respect to the improvement of FKP precision should be conducted.

The Improvement of Real-time Updating Methods of the National Base Map Using Building Layout Drawing (건물배치도를 이용한 국가기본도 수시수정 방법 개선)

  • Shin, Chang Soo;Park, Moon Jae;Choi, Yun Soo;Baek, kyu Yeong;Kim, Jaemyeong
    • Journal of Cadastre & Land InformatiX
    • /
    • v.48 no.1
    • /
    • pp.139-151
    • /
    • 2018
  • The National Base Map construction consists of the regular correction work of dividing the whole country into two regions and carrying out the modification Plotting by aerial photographs every two years as well as the real time updating work of correcting the major change feature within two weeks by the field survey and the As-Built Drawing. In the case of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) used for real time updating work of the National base map, the coordinate transformation error is included in the positional error when applied to the National Base Map based on the World Geodetic Reference System as the coordinate system based on the Regional Geodetic Reference System. In addition, National Base Map is registered based on the outline(eaves line) of the building in the Digital Topographic Map, and the Cadastral and Architecture are registered based on the building center line. Therefore, the Building Object management standard is inconsistent. In order to investigate the improvement method, the network RTK survey was conducted directly on a location of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) and the problems were analyzed by comparing with the plane plotting position reference in National Base Map. In the case of the general structure with the difference on the Building center line and the eaves line, beside the location information was different also the difference in the ratio of the building object was different between Building center line and the eave. In conclusion, it is necessary to provide the Base data of the double layer of the Building center line and the outline of the building(eaves line) in order to utilize the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS). In addition, it is necessary to study an organic map update process that can acquire the up-to-dateness and the accuracy at the same time.

Accuracy Evaluation of Floodplain Topography Survey Using Small-scale UAV (소형 UAV를 이용한 홍수터 지형측량 정확도 평가)

  • Kwak, Sunghyun;Seo, Yong Jae;Song, Jin Hun;Lyu, Siwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.449-453
    • /
    • 2016
  • 하천 구역에 존재하는 인력 및 장비의 접근이 물리적으로 불가능한 공간에 대한 지형정보 취득의 한계를 극복하기 위한 대안으로 소형 UAV(Unmanned Aerial Vehicle)의 활용성을 살펴보고자, 낙동강 달성보와 강정고령보 사이에 위치하는 습지구간에 대한 영상촬영 및 분석을 통한 지형측량을 실시하였다. 홍수터 지형측량에 있어 소형 UAV를 이용한 사진측량의 신뢰성과 정확성을 평가하기 위하여, Network RTK를 이용한 육상측량결과와 정사영상 분석결과를 비교하여 '항공레이저측량 작업규정'의 '수치표고모델 규격 및 정확도'에 제시된 기준에 의거하여 수직위치 정확도를 검토하였다. 검토 결과 과대오차를 배제할 경우 지표면 상태에 따라 1/1,000~1/5,000의 정사영상 및 수치표고모델 제작이 가능함을 확인할 수 있었다.

  • PDF

A Preliminary Study of Near Real-time Precision Satellite Orbit Determination (준 실시간 정밀 위성궤도결정을 위한 이론적 고찰)

  • Bae, Tae-Suk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.1
    • /
    • pp.693-700
    • /
    • 2009
  • For real-time precise GPS data processing such as a long baseline network RTK (Real-Time Kinematic) survey, PPP (Precise Point Positioning) and monitoring of ionospheric/tropospheric delays, it is necessary to guarantee accuracy comparable to IGS (International GNSS Service) precise orbit with no latency. As a preliminary study for determining near real-time satellite orbits, the general procedures of satellite orbit determination, especially the dynamic approach, were studied. In addition, the transformation between terrestrial and inertial reference frames was tested to integrate acceleration. The IAU 1976/1980 precession/nutation model showed a consistency of 0.05 mas with IAU 2000A model. Since the IAU 2000A model has a large number of nutation components, it took more time to compute the transformation matrix. The classical method with IAU 2000A model was two times faster than the NRO (non-rotating origin) approach, while there is no practical difference between two transformation matrices.

European Augmentation Service - a GNSS Monitoring in South Europe Region

  • Gaglione, Salvatore;Pacifico, Armando;Vultaggio, Mario
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.165-170
    • /
    • 2006
  • In the Civil Aviation field, the international trend (through ICAO, EUROCONTROL) is to adopt one positioning system that allows to follow more flight phases. This will allow to release themselves by ground installations and optimize the traffic flows following the aRea Navigation (RNAV) concept. In order to realize this goal the European Scientific Community are focusing on Augmentation Systems based on Satellite infrastructure (SBAS - Satellite Based Augmentation System) and on Ground based ones (GBAS - Ground Based Augmentation System). The goal of this work is to present some results on SBAS and GBAS performances. Regarding SBAS, the Department of Applied Sciences of Parthenope University, after the acquisition of a Novatel OEM4 SBAS receiver has created a monitoring station that reflect as much as possible a standardized measure environment for EGNOS Data Collection Network (EDCN), established by Eurocontrol. The Department of Applied Science has decided to carry out a own monitoring survey to verify the performance of EGNOS that can be achieved in South Europe region, a zone not very covered by official (EDCN) monitoring network. Regarding GBAS, we started from a data set of measurements carried out at the GBAS of Milan-Linate airport where we work on a ground installation (GMS - Ground Monitoring Station) that supervises the GBAS signal and that represent, for our purposes, the Aircraft subsystem. So the set of data collected is to be considered in RTK mode and after the measures session we processed them with the software PEGASUS v 4.11. Both experiences give us the possibility to evaluate the GNSS1 performance that can be achieved.

  • PDF

The Utilization of DEM Made by Digital Map in Height Evaluation of Buildings in a Flying Safety Area (비행안전구역 건물 높이 평가에서 수치지형도로 제작한 DEM의 활용성)

  • Park, Jong-Chul;Kim, Man-Kyu;Jung, Woong-Sun;Han, Gyu-Cheol;Ryu, Young-Ki
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.14 no.3
    • /
    • pp.78-95
    • /
    • 2011
  • This study has developed various DEMs with different spatial resolutions using many different interpolation methods with the aid of a 1:5,000 digital map. In addition, this study has evaluated the vertical accuracy of various DEMs constructed by check point data obtained from the network RTK GPS survey. The obtained results suggest that a DEM developed from the TIN-based Terrain method performs well in evaluating height restriction of buildings in a flying safety area considering general RMSE values, land-type RMSE values and profile evaluation results, etc. And, it has been found that three meters is the right spatial resolution for a DEM in evaluating height restriction of buildings in a flying safety area. Meanwhile, elevation values obtained by the DEM are not point estimation values but interval estimation values. This can be used to check whether the height of buildings in the vicinity of an airfield violates height limitation values of the area. To check whether the height of buildings measured in interval estimation values violates height limitation values of the area, this study has adopted three steps: 1) high probability of violation, 2) low probability of violation, 3) inconclusiveness about the violation. The obtained results will provide an important basis for developing a GIS related to the evaluation of height restriction of buildings in the vicinity of an airfield. Furthermore, although results are limited to the study area, the vertical accuracy values of the DEM constructed from a two-dimensional digital map may provide useful information to researchers who try to use DEMs.