• Title/Summary/Keyword: Nemok-dori

Search Result 2, Processing Time 0.017 seconds

A Study on the Supporting Method of the Nemok-dori (내목도리 지지 방식에 관한 연구)

  • Heo, Kyoung-Do;Chung, Myung-Sup
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.3
    • /
    • pp.69-78
    • /
    • 2020
  • This study is designed to find out the role and relation of the Nemok-dori support members in order to clearly specify the structure of the Dapogye architecture which adopts the Nemok-dori. The dori at the eaves in the Dapogye architecture was expanded to include Oemok-dori, Jusim-dori and Nemok-dori in cooperation with the bracket. The Oemok-dori is used to lengthen the eaves and the Jusim-dori makes the reasonable transfer of loads while the Namok-dori contributes to the stability of the building through the balancing of the bracket. Nemok-dori is located higher than Oemok-dori or Jusim-dori, depending on the slope of Jangyeon and the distance of Chulmok. But as it is not directly supported by bracket or beam, it needs an independent support. The vertical support of Nemok-dori is selectively involved with Cheomcha, lower Jangyeo, support Wall and upper Jangyeo. As the time went by, the vertical height increased, thus making the omitted members less. The horizontal support of Nemok-dori is made in various ways. There are also special cases such as the Nemok-dori □ type chain structure for small rectangular buildings, the 'Nemok-dori = Jung-dori' type for the buildings having small sides and the 'Nemok-dori = Meongechangbang' type appearing on the lower part of the Bankanmulrim type middle height buildings. The horizontal support of Nemok-dori usually uses either the support of the Toeryang type member, the support of beam directed Hwaban or the support through overlaying of internal Jegong. As the time went by and the number and distance of Chulmok increased, the multiple support structures acted together rather than as one support structure. Nemok-dori got stabilized as it has both the vertical and horizontal supports and this support structure also has he role of decoration.

A Study on the Occurrence and A change in the times of the Nemok-dori (내목도리의 발생과 시대적 변화에 관한 연구)

  • Heo, Kyoung-Do;Chung, Myung-Sup
    • Journal of architectural history
    • /
    • v.29 no.1
    • /
    • pp.39-49
    • /
    • 2020
  • A dapo type bracket system which consists of chuganpo(柱間包) and chusangpo(柱上包) with a fake-beam adopted a nemok-dori member to cope with oemok-dori member in order to obtain balance between the outer-side and the inner-side of the bracket system. The middle part of the longest rater in the dapo system is supported by three points made by oemok-dori, jusim-dori and nemok-dori members and the area between the rafer supporting points forms a supporting area. The increase of rafter supporting points and supporting area leads to heightening the structural stability and the efficiency of load delivery. In the eave of dapo system the portion where the three supporting points formed by oemok-dori, jusim-dori and nemok-dori members shows as 33% in the early period, 71% in the middle period and 78% in the later period. On the contrary the portion where more than one of the three dori members were omitted shows as 67% in the early period, 29% in the middle period and 22% in the later period. This is the result of the increase of the number and the distance of steps in the dapo bracket system as time goes on. This is because the structural role of three supporting points becomes important as the increase of distance between the dori members leads to the increase of load which burdens on each dori member.