• Title/Summary/Keyword: National calibration and test organization

Search Result 6, Processing Time 0.018 seconds

A Study on the Evaluation of Measurement Uncertainty for the National Calibration and Test Organizations (Liquid Flow) (국가교정검사기관(액체유량)의 측정불확도 평가 및 비교연구)

  • 임기원
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.11
    • /
    • pp.1012-1019
    • /
    • 2000
  • A proficiency test is one of programs which Korea Research Institute of Standards and Science(KRISS), as national metrology institute, is putting in operation for the mutual recognition arrangement. The Fluid Flow Group of KRISS evaluated the measurement capability for liquid flowmeter calibrator of the national calibration and test organizations. The uncertainty of national standard system was estimated in accordance with Guide to The Expression of Uncertainty in Measurement (ISO), and the turbine flowmeter, which was used for the round-robin test as a reference flowmeter, was characterized. The round-robin tests with the turbine flowmeter package were carried out in 1995 and 1999. The test results of the organizations and those of KRISS agreed within $\pm0.2$%. It is found thus that the organizations have the traceability of the national standard for liquid flow measurement.

  • PDF

Intercomparison of Light Oil Flow Standard System for the Reliability of Measurement Accuracy (경질유 유량표준장치의 신뢰도 검증을 위한 측정정확도 비교)

  • Lim, Ki-Won
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.32 no.9
    • /
    • pp.712-719
    • /
    • 2008
  • Light Oil Flow Standard System(LOFSS), as a national oil flow standard system, in Korea Research Institute of Standards and Science(KRISS) was developed for oil flowmeter calibration, and the expanded uncertainty of flow quantity determination was estimated within 0.04 %. In order to improve the reliability of the LOFSS measurement, a proficiency test was carried out in the flow range of 20 and $240\;m^3/h$ (Reynolds number $20,000{\sim}900,000$). A turbine flowmeter was used as a transfer package in round robin test. The water flow standard system of KRISS, the pipe prover of the national calibration and test organization and the master meter calibrator of the turbine flowmeter supplier, which used the different working fluid respectively, were compared with the turbine flowmeter measurement. The maximum difference of measurement was 0.15 % between the LOFSS and the pipe prover. The En numbers of the each system measurement were evaluated at the same Reynolds number. It was found that the En numbers were less than 1 in the comparison, which means the procedures of the uncertainty estimation of the each calibrators were reasonable and reliable.

A Study on the Uncertainty Estimation of Flowmeter Calibrator with Two Master Flowmeters (2개의 기준유량계를 이용한 유량계 교정장치의 측정불확도 평가에 관한 연구)

  • Choi Jong Oh;Lee Woan Kyu;Lim Ki Won
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.28 no.10
    • /
    • pp.1219-1230
    • /
    • 2004
  • Comparing to the gravimetric and volumetric method, the flowmeter calibration based on the master meter method is relatively economical and convenient, especially for high flowrate. The uncertainty of flow quantity and flowrate using the master meter method was evaluated according to the GUM (Guide to the Expression of Uncertainty in Measurement). In order to apply for the wider flow range, two master meters (electromagnetic flow meter) were employed as reference flowmeters. The uncertainty of the master meter was obtained by combining the statistical variation of the repeated measurements and the variation of fluid density and pipe material due to temperature and pressure changes were scrutinized. for a practical application, the uncertainty of calibrator, whose measuring capacity of 1000 ㎥/h obtained by employing two 500 ㎥/h electromagnetic How meters, was evaluated. The uncertainty budget shows the quantitative contribution of each uncertainty component to the overall uncertainty of the calibrator. As a result, it was found that the dominant uncertainties were from the master meter, which was evaluated statistically, and from the process of least squares fitting. On the contrary, the uncertainties arising from the variation of the fluid density and the pipe volume due to the temperature and pressure were negligible.

Synchronization and identification of ship shaft power and speed for energy efficiency design index verification

  • Lee, Donchool;Barro, Ronald Dela Cruz;Nam, Jeonggil
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.2
    • /
    • pp.123-132
    • /
    • 2014
  • The maritime sector is advancing with dedicated endeavor to reduce greenhouse gas in addressing issues with regards to global warming. Since 01 January 2013, the International Maritime Organization (IMO) regulation mandatory requirement for Energy Efficiency Design Index (EEDI) has been in place and should be satisfied by newly-built ships of more than 400 gross tonnage and the Ship Energy Efficiency Management Plan (SEEMP) for all ships type. Therefore, compliance to this necessitates planning during the design stage whereas verification can be carried-out through an acceptable method during sea trial. The MEPC-approved 2013 guidance, ISO 15016 and ISO 19019 on EEDI serves the purpose for calculation and verification of attained EEDI value. Individual ships EEDI value should be lower than the required value set by these regulations. The key factors for EEDI verification are power and speed assessment and their synchronization. The shaft power can be measured by telemeter system using strain gage during sea trial. However, calibration of shaft power onboard condition is complicated. Hence, it relies only on proficient technology that operates within the permitted ISO allowance. On the other hand, the ship speed can be measured and calibrated by differential ground positioning system (DGPS). An actual test on a newly-built vessel was carried out to assess the correlation of power and speed. The Energy-efficiency Design Index or Operational Indicator Monitoring System (EDiMS) software developed by the Dynamics Laboratory-Mokpo Maritime University (DL-MMU) and Green Marine Equipment RIS Center (GMERC) of Mokpo Maritime University was utilized for this investigation. In addition, the software can continuously monitor air emission and is a useful tool for inventory and ship energy management plan. This paper introduces the synchronization and identification method between shaft power and ship speed for EEDI verification in accordance with the ISO guidance.

Evaluation of the Radiopacity of Contemporary Luting Cements by Digital Radiography (디지털방사선촬영술을 이용한 합착용 시멘트의 방사선불투과성 평가)

  • An, Seo-Young;Lee, Du-Hyeong;Lee, Kyu-Bok
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.29 no.4
    • /
    • pp.377-383
    • /
    • 2013
  • This study examined the radiopacity of eight contemporary luting cements by direct digital radiography. Five disc-shaped specimens ($5mm{\times}1mm$) were prepared for each material tested (BisCem, Clearfil SA Luting, Duolink, Maxcem Elite, Multilink Speed, Panavia F 2.0, RelyX Unicem Clicker, V-link). The specimens were radiographed using a Kodak CS 7600 image plate (Carestream Health, Inc., Rochester, NY, USA) and an aluminum step wedge with a range of thicknesses (1.5 to 16.5 mm in 1.5 mm increments) and a 1 mm tooth used as a reference. A dental X-ray machine Kodak 2200 Intraoral X-ray System (Carestream Health, Inc., Rochester, NY, USA), operating at 70 kVp, 4 mA, 0.156 s and a source-to-sample distance of 30 cm, was used. According to international standards, the radiopacity of the specimens was compared with that of an aluminum step wedge using NIH ImageJ software (available at http://rsb.info.nih.gov/ij/).The data was analyzed by ANOVA and a Tukey's post hoc test. Maxcem Elite (5.66) showed the highest radiopacity of all materials, followed in order by Multilink Speed (3.87) and V-link (2.83). The radiopacity of Clearfil SA Luting (1.35), BisCem (1.33), Panavia F 2.0 (1.29) and Duolink (1.10) were between enamel (1.79) and dentin (0.19). RelyX Unicem Clicker (0.71) showed the lowest radiopacity, which was higher than that of dentin. All materials showed a radiopacity above the minimum recommended by the International Organization for Standardization and the American National Standards/American Dental Association with the exception of RelyX Unicem Clicker.

Evaluation of Characteristics in the Reference Gamma Radiation Fields for testing of Personnel Dosimetry Performance (개인선량 평가의 성능검증을 위한 기준급 감마선장의 특성 평가)

  • Oh, Jang-Jin;Cho, Dae-Hyung;Han, Seung-Jae;Na, Seong-Ho;Lee, Dew-Hey;Lee, Byung-Soo;Jun, Jae-Shik;Chai, Ha-Seok;Yi, Chul-Young
    • Journal of Radiation Protection and Research
    • /
    • v.23 no.4
    • /
    • pp.229-236
    • /
    • 1998
  • In order to establish a testing system for personnel dosimetry performance, the radiation fields from photons, beta particles and neutrons are required, in recent, Korea Institute of Nuclear Safety(KINS) established the reference radation fields except neutrons and tested a variety of their properties. As a result of the test, the reference beams were shown to meet satisfactorily not only the standards of the International Organization for Standardization(ISO), but also the standard levels of the developed countries which are intercomparable with the international traceability. This paper describes the reference beam of gamma radiation. The self-designed and established reference radiation fields were investigated and analyzed by ISO and other international standards. The secondary photon contribution and the beam uniformity of the gamma radiation field were measured and evaluated to fulfill those requirements suggested by the ISO-4037. The measured air kerma rate for the $^{137}$Cs and $^{60}$Co gamma fields was 0.1891 $\sim$ 23.4967 $\mu$Gy/s sand 0.5844 $\sim$ 15.9954 $\mu$Gy/s respectively. The uncertainty with 95 % confidence level of the measured air kerma rate was determined to be less than 2.5 % which is comparable to the international reference gamma radiation fields. It was found that the evaluated air kerma calibration factors of Exradin ionization chamber were in good agreement within 0.9 % and 0.03 % with those given by PTB and NIST, respectively. The gamma radiation fields installed at KINS can maintain traceability systems in Korea, Germany and United State.

  • PDF