Journal of Fisheries and Marine Sciences Education
/
v.20
no.3
/
pp.369-380
/
2008
The government has promoted the local fishing port construction project since 1972 for conquest of the crisis of the fishing village by withering of a fishery, the improvement in fishermen's living environment and quality of life, and promotion of fisheries. In order to estimate the local fishing port construction project objective and synthetically, and to grope for the method proposal of system establishment of the project, the monitoring survey was carried out. The monitoring survey was classified into the program and the performance monitoring. The program monitoring was carried out in order to investigate the project fit for the inhabitants of a fishing village. The performance monitoring was carried out in order to investigate the development latent powers, fishery latent powers, tourism latent powers of a fishing village, rural settlement conditions, etc. using various statistical materials. Since investigating the measured value before executing a policy was not completed, the project effect was compared with the measured value of other areas. According to the local fishing port construction project, the development latent powers, fishery latent powers, and tourism latent powers of the fishing village where the project was undertaken improved greatly, and income of the fishing village increased greatly. As a result of comparing project fit in order to evaluate the project, the project fit of the local fishing port construction project area was higher than the non-project area. Desirable method proposal of monitoring survey was established and the method for raising the efficiency of monitoring survey was extracted.
International conference on construction engineering and project management
/
2015.10a
/
pp.111-113
/
2015
Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.
International conference on construction engineering and project management
/
2009.05a
/
pp.1334-1339
/
2009
To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.
International conference on construction engineering and project management
/
2009.05a
/
pp.41-50
/
2009
Project leadership lifts management to a new level where projects are seen as strategic weapons that help firms to develop competitiveness. For too long, the focus on projects has been on short-term, tool-oriented management. There is a need for fresh understanding of project leadership and appreciation of its importance. A state-of-the-art review of research on leadership in project management is presented. Results of an aspect of a global study on leadership in the construction industry are discussed. The need for project managers to be effectively developed as leaders is underscored.
International conference on construction engineering and project management
/
2005.10a
/
pp.802-807
/
2005
For linear projects, it has long been known that resource utilization is important in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This paper presents an optimization model for solving linear scheduling problems involving resource assignment tasks. The proposed model adopts constraint programming (CP) as the searching algorithm for model formulation, and the proposed model is designed to optimize project total cost. Additionally, the concept of outsourcing resources is introduced here to improve project performance.
Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
International conference on construction engineering and project management
/
2013.01a
/
pp.475-478
/
2013
To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.
International conference on construction engineering and project management
/
2022.06a
/
pp.686-693
/
2022
Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.
Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
International conference on construction engineering and project management
/
2011.02a
/
pp.58-65
/
2011
Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.
Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
International conference on construction engineering and project management
/
2009.05a
/
pp.1608-1614
/
2009
In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.
International conference on construction engineering and project management
/
2009.05a
/
pp.1591-1598
/
2009
Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.