The probabilistic seismic performance of a standard Korean nuclear power plant (NPP) with an idealized isolation is investigated in the present work. A probabilistic seismic hazard analysis (PSHA) of the Wolsong site on the Korean peninsula is performed by considering peak ground acceleration (PGA) as an earthquake intensity measure. A procedure is reported on the categorization and selection of two sets of ground motions of the Tohoku earthquake, i.e. long-period and common as Set A and Set B respectively, for the nonlinear time history response analysis of the base-isolated NPP. Limit state values as multiples of the displacement responses of the NPP base isolation are considered for the fragility estimation. The seismic risk of the NPP is further assessed by incorporation of the rate of frequency exceedance and conditional failure probability curves. Furthermore, this framework attempts to show the unacceptable performance of the isolated NPP in terms of the probabilistic distribution and annual probability of limit states. The comparative results for long and common ground motions are discussed to contribute to the future safety of nuclear facilities against drastic events like Tohoku.
Seismic base isolation has been accepted as one of the most popular design procedures to protect important structures against earthquakes. However, due to lack of information and experimental data the application of base isolation is quite limited to nuclear power plant (NPP) industry. Moreover, the effects of inelastic behavior of soil beneath base-isolated NPP have raised questions to the effectiveness of isolation device. This study applies the wavelet analysis to investigate the effects of soil-structure interaction (SSI) on the seismic response of a base-isolated NPP structure. To evaluate the SSI effects, the NPP structure is modelled as a lumped mass stick model and combined with a soil model using the concept of cone models. The lead rubber bearing (LRB) base isolator is used to adopt the base isolation system. The shear wave velocity of soil is varied to reflect the real rock site conditions of structure. The comparison between seismic performance of isolated structure and non-isolated structure has drawn. The results show that the wavelet analysis proves to be an efficient tool to evaluate the SSI effects on the seismic response of base-isolated structure and the seismic performance of base-isolated NPP is not sensitive to the effects in this case.
Since the Fukushima Daiichi accident in 2011, concerns for the safety of multi-unit Nuclear Power Plant (NPP) sites have risen. This is because more than 70% of NPP sites are multi-unit sites that have two or more NPP units and a multi-unit accident occurred for the first time. After this accident, Probability Safety Assessment (PSA) has been considered in many countries as one of the tools to quantitatively assess the safety for multi-unit NPP sites. One of the biggest concerns for a multi-unit accident such as Fukushima is that the consequences (health and economic) will be significantly higher than in the case of a single-unit accident. However, many studies on multi-unit PSA have focused on Level 1 & 2 PSA, and there are many challenges in terms of public acceptance due to various speculations without an engineering background. In this study, two kinds of multi-unit Level 3 PSA for multi-unit site have been carried out. The first case was the estimation of multi-unit risk with conservative assumptions to investigate the margin between multi-unit risk and QHO, and the other was to identify the effect of time delays in releases between NPP units on the same site. Through these two kinds of assessments, we aimed at investigating the level of multi-unit risk and understanding the characteristics of risk in a multiunit context.
Egieya, Jafaru M.;Ayo-Imoru, Ronke M.;Ewim, Daniel R.E.;Agedah, Ebisomu C.
Nuclear Engineering and Technology
/
제54권2호
/
pp.749-763
/
2022
The fulcrum of economic development is a sustainable supply of electricity. Nigeria is plagued with blackouts, with one of the lowest per capita electricity consumption in the world (circa. 120 kWh per capita). Hence, policies have been instigated to integrate electricity generation from nuclear power plants (NPP) on or before 2027. However, a critical requirement for NPP generation is the implementation of robust human resource development (HRD) programs. This paper presents the perspective of Nigeria in assessing human resources needs over the entire NPP lifecycle following the milestone approach and employing the IAEA's Nuclear Power Human Resource (NPHR) modeling tool. Three workforce organizations are in focus including the owner/operator, regulators, and construction workers following three decades timeframe (2015-2045). The results indicate that for the study period, a maximum of approximately 9045 personnel (73% construction workers, 24% owner/operator, and 3% regulators) should be directly involved in the NPP program just before the commissioning of the third NPP in 2033. However, this number decreases by about 73% (2465 personnel including 94% operator and 6% regulator) at the end of the study timeframe. The results can potentially provide clarity and guidance in HRD decision-making programs.
The recent seismic events that occurred in South Korea have increased the interest in the re-evaluation of the seismic capacity of nuclear power plant (NPP) equipment, which is often conservatively estimated. To date, various approaches-including the Bayesian method proposed by the United States (US) Electric Power Research Institute -have been developed to quantify the seismic capacity of NPP equipment. Among these, the Bayesian approach has advantages in accounting for both prior knowledge and new information to update the probabilistic distribution of seismic capacity. However, data availability and region-specific issues exist in applying this Bayesian approach to Korean NPP equipment. Therefore, this paper proposes to construct an earthquake experience database by combining available earthquake records at Korean NPP sites and the general location of equipment within NPPs. Also, for the better representation of the seismic demand of Korean earthquake datasets, which have distinct seismic characteristics from those of the US at a high-frequency range, a broadband frequency range optimization is suggested. The proposed data construction and seismic demand optimization method for seismic capacity re-evaluation are demonstrated and tested on a 480 V motor control center of a South Korea NPP.
원자력발전소에서 디지털 계측제어 시스템 비중이 높아지면서 원자력발전소에 대한 확률론적 안정성 평가 시 소프트웨어에 대한 신뢰도 평가가 중요해졌다. 원전 소프트웨어 신뢰도 추정을 위한 방법들이 몇 가지 제안 되었지만 해당 방법의 효과적 적용을 지원하는 도구 지원이 미비하였다. 본 연구에서는 소프트웨어 개발 품질 및 검증 품질과 같은 정성적 정보와 통계적 시험 결과와 같은 정량적 정보를 활용하여 원전 소프트웨어 신뢰도를 정량적으로 측정할 수 있는 자동화 도구를 설계하였고 구현하였다. 개발된 도구를 산업용 원자로 보호 시스템 사례에 적용한 결과, 개발된 도구가 원전 소프트웨어의 신뢰성 평가를 효과적으로 지원할 수 있음을 확인하였다.
Objectives: Genotoxicity is evaluated through a chromosomal aberration test using cultured mammalian cells to determine the toxicity of no-pain pharmacopuncture (NPP), which has recently been used to treat musculoskeletal pain disorders in Korean medical clinical practice. Methods: An initial test was performed to determine the dosage range of the NPP, followed by the main test. In this study, NPP doses of 10.0, 5.0, and 2.5%, and negative and positive controls were tested. An in vitro chromosome aberration test was performed using Chinese hamster lung cells under short-term treatment with or without metabolic activation and under continuous treatment without metabolic activation. Results: Compared with the saline negative control group, NPP did not significantly increase the frequency of chromosomal abnormalities in Chinese hamster lung cells, regardless of the presence or absence of metabolic activation. Additionally, the number of cells with structural chromosomal abnormalities was significantly higher in the positive control group than that in the negative control group that received saline. Conclusion: Based on the above results, the chromosomal abnormality-producing effect of NPP was determined to be negative under these test conditions.
본 연구는 AVHRR(Advanced Very High Resolution Radiometer)과 MODIS(MODerate-resolution Imaging Spectroradiometer) 위성관측을 바탕으로 산출된 남한지역의 장기간(1981-2006년) 순 일차생산량(Net Primary Production, NPP)의 시공간적 변화를 분석하고 그 변화에 영향을 미치는 기후요소와의 상관성을 분석하였다. 남한지역의 AVHRR과 MODIS에서는 연간순 열차생산량이 AVHRR의 경우 893-1068 $g{\cdot}C/m^2$ /yr과 MODIS의 경우 610-695 $g{\cdot}C/m^2$/yr로 나타나고 있으며 두 자료는 통계적으로 약 325 $g{\cdot}C/m^2$/yr 의 차이를 보이고 있다. 해상도 등의 차이가 있으나 지상 관측과 비교한 결과 MODIS 센서에 의한 관측이 보다 근접한 결과를 보이는 것으로 나타났다. 위성관측자료 분석결과 NPP 값은 식생의 밀도가 높은 산림지역 및 연평균기온이 높은 지역에서 큰 것으로 나타났다. 두개의 위성센서로 산출된 순 열차생산량은 경년변화가 다소 크지만, 각각 장기간에 걸쳐 서서히 증가하고 있는 것으로 나타났으며 1981-2000년 동안 AVHRR에서 매년 평균 2.14 $g{\cdot}C/m^2$/yr, 2000-2006년 동안 MODIS에서 매년 평균 6.08 $g{\cdot}C/m^2$/yr 만큼 증가하였다. 특히 남서해안 지역은 두 위성관측결과 모두 순 일차생산량의 증가가 상대적으로 높았다. 토지피복 지도와 대조결과 그 이유는 논 밭 등의 관개와 비료시용에 의한 농작물의 생산성 증대와 관계가 있는 것으로 추정된다. NPP값은 월별 강수량 및 평균기온에 밀접한 관계가 있는 것으로 확인되었으며, 특히 남한지역의 여름몬순시기에서 강수량과 기온이 모두 가장 큰 상관관계를 보이고 있다. NPP 절대값의 차이 외에도 두 센서로 산출된 순 일차생산량과 기후요소와의 상관성 등의 차이는 두 자료의 토양호흡 등을 포함하는 등 위성자료 복원과정 및 관련 모텔의 차이에 의해 발생하는 것으로 사료된다. 또한 향후 보다 정확한 순 일차생산량을 계산하기 위해 복원과정에서 기상 실측자료 및 보다 현실적인 토지피복 등을 고려해야 할 것이다.
작물의 수량은 재배하는 식물의 특성과 토양 그리고 기후 등 환경에 의하여 지배된다. 주곡인 쌀 수확량의 지역성과 변이성을 알아내기 위하여 기상청의 기상 자료와 농림부의 쌀생산량 통계 자료를 수집 분석하였다. 기상 자료로부터 순복사량, 증발산량 및 순1차 생산력지수 NPP를 산출하고, Jung의 모형을 이용하여 우리 나라 각 지역의 쌀 생각량을 산출하고, 이를 실생산량과 비교하였다. 7, 8월 기온의 장기 변이를 검토한 결과, 수원의 경우 장주기는 15.1년, 단주기는 7.4년으로 나타났고, 대구의 장주기는 32.9년, 단주기는 4.1년으로 나타났다. 장주기는 대구가 수원 보다 약 2배이상으로 주기성이 강했고, 단주기는 반대로 수원이 대구보다는 주기성이 강하게 나타났다. 한국의 67개 지점에서 순1차생산력지수인 NPP와 총생산력지수 GPP를 추정 결과, 순 복사량이, 16개 지점에서 기온, 1개 지점에서 강수량이 NPP의 제한 요소로 작용하는 것으로 나타났다. 순 복사량은 한국에서의 자연 생산력에 1차적으로 주된 제한 요인으로서 작용하였고, 2차적인 제한 요인는 주로 기온이 작용하였다. 남한 지역의 NPP는 10.87~17.52 Mg ha$^{-1}$, GPP가 18.63~36.31 Mg ha$^{-1}$의 범위이었고, 평균은 NPP와 GPP가 각각 14.69 Mg ha$^{-1}$, 27.94 Mg ha$^{-1}$의 값을 나타냈다. 북한 지역의 경우에는 NPP가 6.47~15.50Mg ha$^{-1}$, GPP가 10.08~24.64 Mg ha$^{-1}$의 범위이었고, 평균은 NPP와 GPP가 각각 12.59 Mg ha$^{-1}$, 13.62 Mg ha$^{-1}$의 값이 나타났다. Jung의 모델에 의하여 97년과 98년의 쌀 생산량을 추정한 결과 실제 쌀 생산량과 근접하였다. 경상도 지역은 타 지역에 비해 실측치보다 예측치가 높게 평가되었고, 추정 생산량과 실제 생산량간 사이에 상관이 없었다. 이 지역에 대한 모델의 수정이 필요하며, 순복사량과 강수량 요인이 고려되면 좀 더 정확한 분포도가 작성될 수 있을 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.