Reinforcement of Shotcrete Lining on the Side Wall of Tunnel in Enlargement of Existing ASSM Road Tunnel (측벽부 숏크리트 보강에 의한 재래식 도로터널 단면확대)

  • Kim, Donggyou;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.81-89
    • /
    • 2012
  • The existing tunnel in urban area can be enlarged because of requirement of road-widening by traffic growth. The protector with rectangular cross section can be set up in the tunnel, which will be constructed for enlargement of width, to solve traffic jam around the tunnel. It is impossible to install the rockbolt in the lower area of tunnel due to a limited space between the protector and cutting surface. The objective of this study is to suggest the method of shotcrete thickness increase instead of rockbolt installation in the side wall of tunnel for the stability of tunnel. Numerical analysis was performed to evaluate displacement at the crown of tunnel, convergence of tunnel, and stress in shotcrete lining in 3-lane and 4-lane NATM tunnels enlarged from 2-lane conventional tunnel. There were three types of analysis condition, rockbolt installation, no rockbolt installation, and increase of shotcrete thickness without rockbolt in the side wall of tunnel. There was no difference on the displacement at the crown and the convergence of upper tunnel. In the lower tunnel, the convergence in case of no rockbolt installation was larger as maximum 1.3mm than that in case of rockbolt installation. The stress in shotcrete lining in case of no rockbolt installation was larger as maximum 1.3MPa than that in case of rockbolt installation. Numerical analysis was performed to compare the behavior of shotcrete with rockbolt with that of shotcrete, which its thickness was increased, without rockbolt. The shotcrete has an increase of 20%(250mm ${\rightarrow}$ 300mm, 4-lane tunnel)~25%(200mm ${\rightarrow}$ 250mm, 3-lane tunnel) in its thickness to reduce the stress in shotcrete lining. The behavior of shotcrete lining increased the shotcrete thickness by 20%~25% was similar to that of existing shotcrete lining with rockbolt.

Effect of Steel-fiber Distribution on Flexural Strength and Toughness of Shotcrete-mimicked Concrete Specimen (숏크리트 모사 콘크리트 공시체에 혼합된 강섬유의 분산도가 휨강도 및 인성에 미치는 영향)

  • Park, Sung-Sik;Kim, Sang-Jung
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.6
    • /
    • pp.53-62
    • /
    • 2013
  • A 5-20 cm thick shocrete has been routinely constructed for NATM tunneling method to stabilize and confine the excavated rock of tunnel construction site. A $40kg/m^3$ of steel fibers are usually mixed into such shotcrete but these steel fibers may not be evenly distributed depending on shotcrete machines, mixing ratios and excavated rock conditions. In this study, square column shotcrete-mimicked concrete specimens of $15cm{\times}15cm{\times}55cm$ were prepared with 5 equal layers and 5 or 20% cement ratio. The specimens were prepared with different reinforced-patterns: non-reinforced, middle layer-reinforced, 1, 3, and 5 layers-reinforced, or all layers reinforced. The specimens were air-cured for 7 days and tested for flexural strength. The influence of steel-fiber distribution on flexural strength and toughness of shotcrete-mimicked concrete specimens was investigated. In the case of a specimen with cement ratio of 20%, a flexural strength increased as a number of fiber-reinforced layer increased. The flexural strength of one-layer reinforced specimen showed 20% less than that of evenly fiber-distributed specimen. On the other hand, a specimen with cement ratio of 5% decreased as the number of fiber-reinforced layers increased. A toughness index increased as the number of fiber-reinforced layers increased, regardless of cement ratios. The toughness index of evenly fiber-distributed specimen showed 2-3 times as large as that of one-layer reinforced specimen.

A Study on the Development of the Seismic Fragility Functions of the High Speed Railway Tunnels in use (기존 고속철도 터널의 지진취약도 함수 개발에 관한 연구)

  • Kim, Hongkyoon;Shin, Chulsik;Lee, Taehyung;Lee, Jonggun;Park, Duhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.11
    • /
    • pp.67-75
    • /
    • 2014
  • In this study, the staged seismic performance evaluations were conducted to the 91 high speed railway tunnels in use for checking whether to comply with the recent design criteria or not. In addition, the seismic fragility functions of the tunnels were developed to allow the probabilistic risk assessment. The results of the staged seismic performance evaluations which consist of a preliminary assessment and a detailed assessment, show that the tunnels comply with the recent design criteria. With reference to the results of previous studies, a form of the proposed seismic fragility functions was set as a log-normal distribution by PGA, and the parameters of the functions were determined by using the probability of damage for the design PGA level. The seismic fragility functions were developed for each types (Cut & Cover, NATM) of tunnels. The seismic fragility functions from this study and the existing research results (FEMA, 2004) were compared to evaluate the seismic performance level of the tunnels, as a result the tunnels of this study were relatively superior to the ASSM tunnels on the seismic performance.

Application technique on thrust jacking pressure of shield TBM in the sharp curved tunnel alignment by model tests (축소모형실험을 통한 급곡선 터널에서의 Shield TBM 추진 압력 적용 기술에 대한 연구)

  • Kang, Si-on;Kim, Hyeob;Kim, Yong-Min;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.335-353
    • /
    • 2017
  • This paper presents the application technique on thrust jacking pressuring of shield TBM in the sharp curved tunnel alignment by model tests. Recently, the application of shield TBM method as mechanized tunnelling is increasing to prevent the vibration and noise problems, which can be occurred in the NATM in the urban area in Korea. However, it is necessary to plan the sharp curved tunnel alignment in order to avoid the building foundation and underground structures, to develop the shield TBM operation technique in the shape curved tunnel alignment. Therefore, the main operation parameters of shield TBM in the curved tunnel alignment are reviewed and analyzed based on the case study and analytical study. The results show that the operation of shield jacking force system is the most important technique in the shape curved tunnel alignment. The simplified scaled model tests are also carried out in order to examine the ground-shield TBM head behaviour. The earth pressures acting on the head of shield TBM are investigated according to two different shield jacking force systems (uniform and un-uniform pressure) and several articulation angles. The results obtained from the model tests are analysed. These results will be very useful to understand the shield TBM head interaction behaviour due to the shield jacking operation technique in the shape curved tunnel alignment, and to develop the operation technique.

Determination of equivalent elastic modulus of shotcrete-tetragonal lattice girder composite (사변형 격자지보재-숏크리트 합성부재의 등가물성 결정 기법)

  • Kang, Kyung-Nam;Song, Ki-Il;Kim, Sun Gil;Kim, Kyoung Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.145-154
    • /
    • 2020
  • Steel set is a structure that stabilize the NATM tunnel until the installation of shotcrete, and it is combined after the shotcrete is installed to improve stability. In this study, determination approach for the equivalent elastic modulus of shotcrete-lattice girder composite is newly suggested for tunneling simulation. Also, a method was presented to calibrate the equivalent elastic modulus through the comparison of the full 3D model and equivalent model. When the conventional equivalent elastic modulus is used for shotcrete-lattice girder composite, the flexural strength of equivalent model is 130% smaller than that of full 3D model. Equivalent elastic modulus is adjusted considering the error of flexural strength. It is found that the error of flexural strength obtained from adjusted equivalent model using adjusted equivalent elastic modulus is reduced less than 1%.

A study on a reasonable modeling method of fully grouted rockbolt (전면접착형 록볼트의 거동 특성을 고려한 합리적인 모델링 방법에 대한 연구)

  • Hong-Joo Lee;Kyung-Nam Kang;Ki-Il Song;Sang-Don Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.1
    • /
    • pp.19-37
    • /
    • 2024
  • Rockbolts are the primary-supports in NATM tunnels and are widely used at tunnel construction sites. Among the rockbolts methods applied in domestic tunnel design, fully grouted rockbolts are the most representative and frequently used. Fully grouted rockbolts exhibit relative behavior between the bolt and the ground due to the grout material. However, during numerical analysis for tunnel design, fully grouted rockbolts are often modeled in a way that does not reflect their behavior characteristics. This may result in underestimating or overestimating the force of the supports. Based on a literature review, it was analyzed that fully grouted rockbolts are modeled using truss element or cable element. To analyze the effect of grout properties of cable elements on rockbolts behavior, this paper compared the behavior of rockbolts in two models: one estimating grout properties based on rockbolt pull-out test data, and another assuming complete adhesion between the rockbolts and the ground by applying large grout properties. Under identical tunnel conditions, the numerical analysis was conducted by modeling the fully grouted rockbolts differently using truss and cable elements, and the tunnel behavior was analyzed. The research results suggest that modeling fully grouted rockbolts as a function of the interface effect between the bolts and the ground, specifically considering grout, is desirable. The use of pull-out test data to simulate the behavior of actual fully grouted rockbolts was considered as a valid approach.

Review on the application of single-shell tunnel in Korea (싱글쉘 터널의 국내 적용에 대한 고찰)

  • Sangpil Lee;Heesang Ha;Donghyun Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.223-242
    • /
    • 2024
  • Single-shell tunnels, introduced to South Korea in the early 2000s, have not been adopted for the main tunnels of roads or railways over the past two decades despite several attempts starting with the Gwangju City Bypass. This reluctance likely arises from concerns about the long-term performance of supporting materials and the absence of relevant criteria and specifications. However, recent progress, including the incorporation of high-strength shotcrete standards and corrosion-resistant rock bolt specifications, alongside equipment and technique enhancements, necessitates a reassessment of single-shell tunnels. While the single-shell tunnel method offers advantages in environmental impact, construction cost and period compared to the conventional NATM, it is crucial to address the challenges, such as limited design and construction experience, incomplete detailed standards, and insufficient construction specifications, through further research and pilot projects. This paper reviewed the basic principles of single-shell tunnel, current application and research status, technical development trends, criteria and specifications, and remaining challenges. It aims to reignite discussions on the feasibility of applying single-shell tunnels in South Korea.

A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea (국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례)

  • Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

Effects of Earthquake on Tunnel Stability (지진이 터널 안정에 미치는 영향)

  • 박남서
    • Explosives and Blasting
    • /
    • v.14 no.2
    • /
    • pp.71-80
    • /
    • 1996
  • A series of nurmerical analysse for the earhtquake of Iran railway tunnles under construction by NATM(New Astrian Tunnelling Method) were careid out throuth a pseudo-dynamic analyses techique used in a FFM computer program, DWTAP(Daewoo Tunnel Analysis Program), and the results are described in the paper. The analyses were performErl for two case;one is for the primary supports and the other is for the rompletEd permanent roncrete lining. The horizontal and verical groW1d accelerations for the design were estimatEd as 0.34 g and 0.23 g, respectively based on the historical reismic rerords in the proj3et area and the empirical equations. The results show that the turmel would be safe W1der the anticipitOO earthquake motion with the permanent roncrete lining, but some minor cracks rnigt be developErl in the primary shotcrete lining without any significant structural damages.

  • PDF

Solving Non-deterministic Problem of Ontology Reasoning and Identifying Causes of Inconsistent Ontology using Negated Assumption-based Truth Maintenance System (NATMS를 이용한 온톨로지 추론의 non-deterministic 문제 해결 및 일관성 오류 탐지 기법)

  • Kim, Je-Min;Park, Young-Tack
    • Journal of KIISE:Software and Applications
    • /
    • v.36 no.5
    • /
    • pp.401-410
    • /
    • 2009
  • In order to derive hidden information (concept subsumption, concept satisfiability and realization) of OWL ontology, a number of OWL reasoners have been introduced. The most of these ontology reasoners were implemented using the tableau algorithm. However most reasoners simply report this information without providing a justification for any arbitrary entailment and unsatisfiable concept derived from OWL ontologies. The purpose of this paper is to investigate an optimized method for non-deterministic rule of the tableau algorithm and finding axioms to cause inconsistency in ontology. In this paper, therefore, we propose an optimized method for non-deterministic rule and finding axiom to cause inconsistency using NATMS. In the first place, we introduce Dependency Directed Backtracking to deal non-deterministic rule, a tableau-based decision procedure to find unsatisfiable axiom Furthermore we propose an improved method adapting NATMS.