• Title/Summary/Keyword: N.P removal

Search Result 1,008, Processing Time 0.04 seconds

The Effect of a Piezoelectric Ultrasonic Scaler with Curette Tip on Casting Gold Removal in Vitro (큐렛팁을 장착한 압전방식 초음파치석제거기의 작업조건에 따른 치과주조용 합금의 삭제에 관한 연구)

  • Lee, Young-Kyoo
    • Journal of Periodontal and Implant Science
    • /
    • v.31 no.3
    • /
    • pp.531-542
    • /
    • 2001
  • Periodontal debridement is most important procedure in periodontal treatment, because periodontal disease is the biofilm infection. The use of ultrasonic instrument has many clinical advantages compared to classical hand instrument. The introduction of newly developed ultrasonic scaler tips made the use of ultrasonic scaler popular. However the study of tooth substance removal according to the working parameters of ultrasonic scaler with newly developed tips is not sufficient. The purpose of this study is to evaluate the effects of working parameters of piezoelectric ultrasonic scaler with curette tip on casting gold removal. The working parameters was standardized by the sledge device which controls lateral force(0.5 N, 1.0 N, 2.0 N) and power setting was adjusted 2, 4, 8 in P mode and S mode and instrumentation time was 5 seconds. The defect depth and width were measured with profile meter and defect surface was examined by SME. The depth of defect was significantly large in S mode( $39.58{\pm}19.35{\mu}m$) compared to P mode( $8.37{\pm}6.98{\mu}m$). There was significant decrease of depth of defect between 1.0N($32.87{\pm}27.18{\mu}m$) and 2.0N( $14.86{\pm}15.04{\mu}m$). The area of defect was also significantly large in S mode($4482.42{\pm}3551.71{\mu}m^2$) compared to P mode( $922.06{\pm}960.32{\mu}m^2$). There was significant decrease of area of defect between 1.0N($3889.12{\pm}3936.00{\mu}m$) and 2.0N( $974.66{\pm}986.01{\mu}m$). The change of mode did not effect on the width of the defect. The change of power setting did not effect on the depth, width, and area of defect. In spite of limitation of this study it could be concluded that the use of piezoelectric ultrasonic scaler with curette tip on S mode could make significant tooth substance loss.

  • PDF

Evaluation of Wastewater Treatment Efficiency in Dongbokcheon Constructed Wetlands for Treating Non-point Source Pollution at Different Treatment Time and Wastewater Loading (비점오염원 처리를 위한 동복천 인공습지의 시기별 및 부하량별 수처리 효율 평가)

  • Lee, Sang-Gyu;Seo, Dong-Cheol;Kang, Se-Won;Choi, Ik-Won;Lim, Byung-Jin;Park, Jong-Hwan;Kim, Kap-Soon;Lee, Jun-Bae;Heo, Jong-Soo;Cho, Ju-Sik
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.44 no.5
    • /
    • pp.929-936
    • /
    • 2011
  • To treat non-point source pollution in Dongbok lake, removal efficiencies of pollutants were investigated in Dongbokcheon constructed wetlands (CWs) at different treatment time and wastewater loading. The wetlands consisted of forebay, wetlands ($1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$, $5^{th}$, $6^{th}$, $7^{th}$, and $8^{th}$ wetlands) and sedimentation pond. The concentrations of BOD, SS, T-N, and T-P in inflow ranged $0.85{\sim}3.14mg\;L^{-1}$, $3.33{\sim}9.70mg\;L^{-1}$, $0.64{\sim}5.33mg\;L^{-1}$, and $0.03{\sim}0.10mg\;L^{-1}$ from April to October in 2008, respectively. The removal rates of BOD, SS, T-N, and T-P in Dongbokcheon CWs were 34%, 5%, 31%, and 13%, respectively. The removal rates of BOD and T-N were higher than those for SS and T-P. The amounts of pollutant removal in Dongbokcheon CWs were higher in the order of forebay > wetlands > sedimentation pond for BOD, sedimentation pond > wetlands > forebay for SS, sedimentation pond > forebay > wetlands for T-N. The amount of T-P removal in wetlands was higher than forebay and sedimentation pond.

Removal of Nitrogen and Phosphorus in Anaerobic Fermentation Supernatant by Struvite Crystallization (Struvite 결정화를 이용한 혐기성 발효액의 질소와 인 제거)

  • Kim, Jongoh;Jung, Jongtae;Kim, Harkkyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.6
    • /
    • pp.5-12
    • /
    • 2006
  • This study was conducted to investigate the effect of operational parameters such as dosage of magnesium and phosphate, pH, reaction time and existence crystal core for the removal of nitrogen and phosphorus in anaerobic fermentation supernatant by struvite crystallization. Optimal mole ratio of $Mg^{2+}:NH_4{^+}:PO_4{^{3-}}$ was 1.2:1.0:1.2. Under the optimal molar ratio, removal ratio and reaction rate constant of $NH_4{^+}-N$ and $PO_4{^{3-}}-P$ were 79.2, 96.8%, 0.157 and $0.344min^{-1}$, respectively. Optimal pH and reaction time were 11 and 10 minutes, respectively, in the optimal molar ratio. Residual concentration of $NH_4{^+}-N$ and $PO_4{^{3-}}-P$ showed lowest value with 1 g/L of crystal core addition. SEM analysis of struvite crystallization with crystal core showed higher crystal core growth than that of without crystal core. Struvite precipitate proved to be orthorhomic crystal structure by XRD analysis.

  • PDF

Feasibility of Aquatic Plants (Eichhornia crassipes and Water dropwort) for Nutrients Removal (수생식물(부레옥잠 및 미나리)을 이용한 영양염류 제거에 관한 연구)

  • Choi, Don-Hyeok;Kang, Ho;Lee, Mi-Kyung
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.2
    • /
    • pp.141-148
    • /
    • 2010
  • Feasibility of floating aquatic plants (Eichhornia crassipes and Water dropwort) was investigated in order to control of sewage depending on various initial loading in a lab scale test. In addition, field test was conducted to assess the uptake rate of nutrient by E. crassipes. Lab-scale test applying primary domestic effluent operated at 4 day HRT shows that the highest uptake rates were 1.06 g N/$m^2{\cdot}day$ and 0.39 g P/$m^2{\cdot}day$ in the E. crassipes reactor. BOD removal efficiency in E. crassipes reactor was as high as 80% when the loading value was lower than 185 kg BOD/$ha{\cdot}day$. While 70 ~ 80% removal efficiency of BOD was achieved when the loading value was lower 80 kg BOD/$ha{\cdot}day$ at the W. Dropwort reactor. Experiment results show that E.crassipes has a higher nutrients removal efficiency than W. dropwort under high pollutant loading. Input loadings of TN and TP should not exceed to 10 kg TN/$ha{\cdot}day$ and 2.0 kg TP/$ha{\cdot}day$ respectively to provide a 50% TN and 80% TP removal efficiencies using E. crassipes. The field test demonstrated that an annual yield of E. crassipes mass was estimated as a fresh weight of 30.9 $m^3/ha{\cdot}yr$. E. crassipes grown in field pads absorbed 76.7 kg N/$ha{\cdot}yr$ and 13.4 kg P/$ha{\cdot}yr$ as a dry weight.

Removal of Ammonium-Nitrogen {$NH_4^+$ -N) Using Immobilized Nitrifier Consortium in PVA(PolyvinylalcohoI) (PVA에 고정화된 Nitrifier Consortium을 이용한 암모니아성 질소의 제거)

  • 서재관;서근학;김성구
    • KSBB Journal
    • /
    • v.14 no.1
    • /
    • pp.51-57
    • /
    • 1999
  • The immobilization of nitrifier consortium was carried out for the application to recirculating aquaculture system(RAS). The abilities of $NH_4^+$-N removal by immobilized nitrifier consortia prepared with boric acid treated, ethanol treated, ad freezing-thawing treated PVA beads at the concentration 15% were examined. To identify the possibility of applying the beads in the fluidized bed reactor, characteristics of beads were evaluated. The suitable bead was boric acid treated beads which had highest ammonia removal rate of 16.09 g/$m^3$/day. It took 12 days for nitrifier consortium immobilized beads to be stable for the removal of $NH_4^+$-N. Life spans of the beads were more than three months with aggressive aeration in the fluidized ed reactor when nitrifier consortia immobilized in PVA beads were used. In order to apply the nitrifier consortium immobilized beads to aquaculture facility, the continuous reactor was used for 49 days with synthetic aquacultural water containing 2 mg/L ammonia. The highest ammonia removal rate of 31.87 g/$m^3$/day was observed when hydraulic residence time was 0.6 hour(36min.).

  • PDF

A Study on Removal of Organics, Nitrogen and Phoschorus of Domestic Wastewater in Pilot-Scale Upflow Packed Bed Column Reactor (Pilot 규모의 상향류식 충전탑 반응기를 이용한 생활오수의 유기물 및 질소, 인 처리에 관한 연구)

  • Seon, Yong-Ho
    • KSBB Journal
    • /
    • v.22 no.4
    • /
    • pp.191-196
    • /
    • 2007
  • This study used biofilm process, which needs simple operation, maintenance and smaller facility area than conventional activated sludge process with the small plant operation, in the treatment of increasing sewage with the rapid industrial growth. The reactor used in this study consists of one anaerobic and one aerobic chamber filled with waste ceramic and waste vinyl as media and the treated sewage was from restaurant source. The experiment was scaled up from lab. to pilot scale and lasted for about 100 days. We focused on the removal efficiency of organics, nitrogen and phosphorus with constant HRT and continuous aeration. The removal efficiency of $BOD_5$ and SS were 94.33% and 87.77% respectively, which was a satisfaction level. However the removal efficiency of $COD_{Cr}$ was 81.46% somewhat below the desired level of 90%, and that of T-N and T-P showed 71.92% and 21.10% respectively, that was below the expected value. The removal efficiency of $COD_{Cr}$ and T-N in the pilot scale was about 10% low compared with the lab.-scale.

ALC(Autoclaved Light-weight Concrete)를 이용한 생물학적 반응벽체에 관한 연구

  • Park Geun-Min;Lee Jae-Yeong;O Byeong-Taek;Choi Sang-Il
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2006.04a
    • /
    • pp.402-406
    • /
    • 2006
  • The physical and chemical characteristics of ALC were analyzed and showed 2.2 of specific gravity and 9.05 of pH. The results of leaching tests with standard method for soil and waste indicated heavy metals(Cu, Cd, Pb, $Cr^{6+}$) were under maximum concentration level. The anaerobic digestion sludge was attached in the surface of ALC within 90 hours. As the results of batch test, pH of the ALC and Bio-ALC were decreased from initial pH of ALC to 8.7 and 7.8 respectively Also, the concentration of heavy metals was rapidly eliminated in the solution with the batch test. The result of column experiment indicates that the removal efficiency of ALC was showed 66% of T-P, 60% of T-N, and 67% of CODcr. Also, removal efficiency of Bio-ALC was slightly higher than that of ALC in T-N (64%) and CODcr (74%).

  • PDF

A Study on the Removal of Ammonia by Using Peat Biofilter (미생물 활성토탄을 이용한 암모니아 제거에 관한 연구)

  • Choung, Youn Kyoo;Ahn, Jun Seong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.3
    • /
    • pp.655-668
    • /
    • 1994
  • Conventional deodorization filters using soil and compost reach the capacity limitation of deodorization in short period, because its removal mechanism primarily depends on adsorption. Therefore, in this study the experiment was performed on the removal of ammonia which is a strong inorganic malodor, frequently emitted from night soil treatment plants and sewage treatment plants, by seeding activated sludges on the bio-peat containing higher organic contents, water conservation capacity, permeability and lower pressure drop. As a result, in raw peat filter natural ammonia outlet was observed in consequence of pH increase resulted from ammonia ionizing in liquid phase. Ammonia removal mechanism primarily depended on the adsorption onto the anion colloidal substances in peat. In peat bio-filter, theoretical ammonium salts ratio was higher than that of raw peat, resulted from slight pH increase by microorganism activity, however, the experimetal value of ammonia-nitrogen accumulated in bio-peat was lower than that of raw peat because of nitrification by nitrifying bacteria. In the initial reaction period, adsorption was predominant in the ammonia removal mechanism, but nitrification was conspicuous after the middle period. Mass balance of nitrogen was established using experimental data of input $NH_3$ loading, output $NH_3$ loading, $NH_4{^+}$-N, $NO_x$-N, and Org-N. The critical time of unsteady state, which is the maximum activating point of microorganism in bio-filter, was determined using experimental data, and the ammonia adsorption curve was computed using regression analysis. On the basis of the results obtained by above analysis, the delay days for the saturation of adsoption capacity in peat bio-filter was calculated.

  • PDF

A Study on the Improvement of Treatment Efficiency for Nitrogen and Phosphorus by Improved Sewage Treatment Process in Constructed Wetland by Natural Purification Method (자연정화공법에 의한 인공습지 하수처리장에서 하수처리 공정개선에 따른 질소 및 인의 처리효율 향상 방안)

  • Seo, Dong-Cheol;Park, Woo-Young;Lim, Jong-Sir;Park, Chan-Hoon;Lee, Hong-Jae;Kim, Hong-Chul;Lee, Sang-Won;Lee, Do-Jin;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.27 no.1
    • /
    • pp.27-34
    • /
    • 2008
  • To effectively treat the domestic sewage that was produced on a small-scale in farming and fishing village in order to encourage an ecologically friendly environment, a small-scale sewage treatment apparatus using natural purification methods that consisted of an aerobic and an anaerobic plots were constructed. The efficiency of sewage treatment according to the sewage loading was investigated to obtain the optimum sewage loading in small-scale sewage treatment apparatus. Removal rate of pollutants according to the sewage loading were in the order of $150\;Lm^{-2}day^{-1}{\fallingdotseq}300\;Lm^{-2}day^{-1}>600\;Lm^{-2}day^{-1}$. Therefore, the optimum sewage loading was 300 L m-2 day-1. Under the optimum sewage loading, removal rate of BOD, $COD_{Mn}$, turbidity, T-N and T-P were 99, 94, 99, 49 and 89%, respectively. However, to satisfy the water quality standard in effluent in small-sclae sewage treatment apparatus for domestic sewage treatment, the low removal efficiency of T-N and T-P must be improved. So to improve the removal rate of T-N and T-P, the efficiency of sewage treatment according to the improved sewage treatment process such as, re-treatment at aerobic plot, anaerobic condition of aerobic plot, changing the filter media sizes and the depths in anaerobic plot, and also addition of oyster shells to filter media at anaerobic plot were investigated. In case of 150 cm depth in anaerobic plot with filter medium A (effectivity particle size 1.50 mm) and addition of oyster shells to filter media at anaerobic plot, removal rate of T-N and T-P in both plots were increased by 10 and 3%, and 14 and 7% in comparison with 100 cm depth in anaerobic plot with filter medium B(effectivity particle size 0.95 mm), respectively. The optimum improved sewage treatment process in small-scale sewage treatment apparatus were 150 cm depth in anaerobic plot with filter medium A and addition of oyster shells to filter media at anaerobic plot.

Recovery of N and P Resources from Animal Wastewater by Struvite Crystallization (Struvite 결정화에 의한 축산폐수로 부터 질소.인 자원의 재생)

  • Jo, W.S.;Yoon, S.J.;Ra, C.S.
    • Journal of Animal Science and Technology
    • /
    • v.45 no.5
    • /
    • pp.875-884
    • /
    • 2003
  • Operational parameters for struvite crystallization, as a process to recover nitrogen and phosphorus resources from animal wastewater, were studied in this research. Crystallization distinctive of NH$_4$-N and PO$_4$$^{3-}$ in accordance to chemical sources, influent pH, aeration and stirring was examined using 2L of working volume of struvite reactor. Also, to find an effective treatment process combining with electrolysis method, removal characteristics of NH$_4$-N and PO$_4$$^{3-}$ in 6 different processes was tested. As chemical sources for the derivation of struvite formation, MgSO$_4$ and MgCl$_2$ were superior to CaCO$_3$ and CaCl$_2$. From experiment which was conducted to know the effects of aeration and stirring on struvite formation, it was revealed that aeration stimulated the crystallization reaction by inducing faster pH increase. While 90% of P removal was achieved within 1 hour under aeration, 14 hours was consumed under stirring condition. Struvite formation under aeration was affected by influent pH. No crystallization was observed at pH 5 level, but active crystallization reaction was induced over pH 6.0. 95% of P removal by struvite formation at pH 6, 7 and 9 was achieved within 3h, 2h and 10 min., respectively. However, over pH 10, operational problem due to excessive foam formation occurred, and blunting of crystallization reaction was observed at pH 11. When consider the pH range of animal wastewater, pH 7 to 9, efficient struvite formation could be achieved by simple aeration, without any chemical usage for pH adjustment. Among tested processes, the treatment process which electrolyzing the supernatant from struvite reactor, providing air to both reactors, showed best pollutant removal efficiencies. In this combined process, the removal efficiencies of NH$_4$-N and PO$_4$$^{3-}$ was 86% and 98%, respectively, and 92.4% of color removal was obtained.