Proceedings of the Korean Society of Environment and Ecology Conference
/
2003.10a
/
pp.105-126
/
2003
In Korea most of annual rainfall is concentrated in several episodic heavy rains during the season of summer monsoon and typhoon. Because of uneven rainfall distribution many dams have been constructed in order to secure water supply in dry seasons. The Han River system has the most dams among Korean rivers, and the river is a series of dams now. Reservoirs need different strategy of water quality control from river water. Autochthonous organic matter and phosphorus should be the major target to be controlled in lakes. In this Paper some problems are discussed that makes efforts of water quality improvement ineffective in lakes of Korea, even after the substantial investment to wastewater treatment facilities.1) Phosphorus is the key factor controlling eutrophication of lakes and the reduction ofphosphors should be the major target of water treatment. However, water quality management strategy in Korea is still stream-oriented, and focused on BOD removal from sewage. Phosphorus removal efficiency remains as low as 10-30%, because biological treatment is adopted for both secondary treatment and advanced treatment. The standard for TP concentration of the sewage treatment plant effluent is 6 mgP/l in most of regions, and 2 mg/l in enforced region near metropolitan water intake point. TP in the effluents of sewage treatment plants are usually 1-2 mg/1, and most of plants meet the effluent regulation without a further phosphorus removal process. The generous TP standard for effluents discourages further efforts to improve phosphorus removal efficiency of sewage treatment. Considering that TP standard for the effluent is below 0.1 mg/l in some countries, it should be amended to below 0.1 mg/l in Korea, especially in the watershed of large lakes.2) Urban runoff and combined sewer overflow are not treated, even though their total loading into lakes can be comparable to municipal sewage discharges on dry days. Chemical coagulation and rapid settling might be the solution to urban runoff in regard of intermittent operation on only rainy days.3) Aggregated precipitation in Korea that is concentrated on several episodic heavyrains per year causes a large amount of nonpoint source pollution loading into lakes. It makes the treatment of nonpoint source discharge by methods of other countries of even rain pattern, such as retention pond or artificial wetland, impractical in Korea.4) The application rate of fertilizers in Korea is ten times as high as the average ofOECD countries. The total manure discharge from animal farming is thought to be over the capacity of soil treatment in Korea. Even though large portion of manure is composted for organic fertilizer, a lot of nutrients and organic matter emanates from organic compost. The reduction of application rate and discharge rate of phosphorus from agricultural fields should be encouraged by incentives and regulations.5) There is a lot of vegetable fields with high slopes in the upstream region of the HanRiver. Soil erosion is severe due to high slopes, and fertilizer is discharged in the form of adsorbed phosphorus on clay surface. The reduction of soil erosion in the upland area should be the major preventive policy for eutrophication. Uplands of high slope must be recovered to forest, and eroded gullies should be reformed into grass-buffered natural streams which are wider and resistant to bank erosion.
Kwon, Se Young;Kang, Min Sun;Kim, Se Woon;Shin, Jung-Hun;Choi, Han-Na;Jang, Hoon;Cho, Jin Woo
Journal of Korean Society of Water and Wastewater
/
v.28
no.1
/
pp.13-23
/
2014
A lab-scale Anaerobic Baffled Reactor (ABR) was applied to treat a primary sludge taken from a municipal wastewater treatment plant. In this experiment, acidogenic reaction was promoted by operating the ABR with short hydraulic retention time (HRT) to produce sufficient volatile fatty acids (VFA) instead of production of methane. The performance of ABR on the VFA production and total solids reduction was observed with different operating conditions with 2, 4, 6, and 8 days of HRT. Corresponding organic loading rates were 6.7, 3.4, 2.2, and $1.6kgCOD_{cr}/m^3{\cdot}day$. As HRT increased the removal rate of TCOD was also increased (82.5, 84.2, 96.9, and 95.9 % in average for HRT of 2, 4, 6, and 8 days, respectively) because the settlement of solids was enhanced in the baffle by the decrease of upflow velocity. At HRT of 2 days the average concentration of VFA in the effluent was measured at $1,306{\pm}552$ mgCOD/L corresponding to 107 % increment as compared to the VFA concentration in the influent. However, as HRT increased VFA concentraiotn was decreased to $143{\pm}552$ mgCOD/L at HRT of 8 days. The reduction rates of total solids were 12.2, 26.5, 24.8, and 43.0 % for HRT of 2, 4, 6, and 8 days. As HRT increased the hydrolysis of organic particulate matters in the reactor was enhanced due to the increasing of solids retention time in the baffle zone with low upflow velocity in long HRT condition. Consequently, we found that a primary sludge became a good source of VFA production by the application of ABR process with HRT less than 4 days and the 12-26 % of total solids reduction was expected at these conditions.
Journal of the Korean Society for Marine Environment & Energy
/
v.9
no.1
/
pp.14-20
/
2006
In this study, the feasibility of simultaneous removal of organic materials and nitrogen in the waste-water from fisheries processing plant was evaluated using entrapped mixed microbial cell technique(EMMC) process. The experiment was performed using activated sludge from municipal sewage treatment plant which was immobilized with gel matrix by cellulose triacetate. It was found that the stable operation at the treatment system which is composed of anoxic and oxic tank, was possible when the organic and nitrogen loading rates were increased stepwise. The organic and nitrogen loading rates were applied from 0.65 to $1.72kgCOD/m^3/d$ and from 0.119 to $0.317kgT-N/m^3$ with four steps, respectively. The maximum nitrogen loading rate which could satisfy the regulated effluent standard of nitrogen concentration, was $0.3kgT-N/m^3/d$. The removal efficiency of total nitrogen was decreased apparently as increasing nitrogen loading rates, whereas the removal efficiency of ammonium nitrogen was effective at the all tested nitrogen loading rates. Therefore, it was concluded that nitrification was efficient at the system. Nitrate removal efficiency ranged from 98.62% to 99.51%, whereas the nitrification efficiency at the oxic tank ranged 94.0% to 96.9% at the tested loading rates. The removal efficiencies of chemical oxygen demand(COD) and those of total nitrogen at the entire system ranged from 94.2% to 96.6% and 73.4% to 83.4%, respectively.
A prototype of expert system which can support the operation for the municipal waste water treatment plant located at Kyoung-Ki Do, Kwang-ju Kun was developed and tested. This system provides (i) tracking the cause of the problem, (ii) analysis, and (iii) solution Knowledge-base consists of about 100 production-rules for the biological wastewater process, such as bio-reactor and final clarifier. Rules were obtained from the analysis of the problems such as sludge bulking. The system provides stable process control and management and effectively helps inexperienced operators with advanced and standard technologies. Future works will focus to develop a statistical process control model and associate with expert system. The control model can process the operation data statistically; analyze the relationship between affecting factors and control variables; and provide optimum operation parameters.
Batch experiments were conducted to investigate the effect of electron donor on reductive dechlorination of 2,4,5-trichlorophenol by a methanogenic consortium. The methanogenic consortium was obtained from the anaerobic digester of a municipal wastewater treatment plant. The batch reactor containing methanogenic consortium was spiked with 2,4,6-trichlorophenol at 10 mg/$\ell$. Acetate, ethanol, glucose of methanol, each was added as an electron donor for methanogenic consortium. During the course of the experiments liquid samples were taken from the batch reactor to measure dechlorination rate and find the dechlorination pathway of 2,4,6-trichlorophenol. After incubation 2,4,6-trichlorophenol was first dechlorinated to 2,4-dichlorophenol and then to 4-chlorophenol. Phenol was not detected in the batch reactor the highest rate of dechlorination of 2,4,6-trichlorophenol was observed when ethanol was used as an electron donor.
Kang, Ho;Lee, Hye Mi;Cho, Sang Sun;Park, Sun Uk;Jeong, Ji Hyun
Journal of Korean Society on Water Environment
/
v.26
no.5
/
pp.754-760
/
2010
This study was carried out not only to evaluate optimal operating condition to increase biogas production, but also to estimate feasibility of renewable energy from anaerobic digester of sewage sludge. Semi- continuous Fed and Mixed Reactors (SCFMRs) were operated in various condition to quantify the reactor variables. The result of SCFMR operation showed that the biogas productivity and total volatile solids (TVS) removal of total solids (TS) 4% reactor at hydraulic retention time (HRT) 20 days with Organic Loading Rate (OLR) of $1.45kg/m^3-d$ were $0.39m^3/m^3-d$ and 26.7%, respectively which was two times higher than that of TS 2.5% reactor. Consequently the daily biogas production of $20,000m^3$ would be possible from the total volume of $52,000m^3$ of anaerobic digesters of the municipal wastewater treatment plant in D city. In feasibility study for the Biogas utilization, combined heat and power system (CHP) and CNG gasification were examined. In case of CHP, the withdrawal period of capital cost for gas-engine (GE) and micro gas-turbine (MGT) were 7.7 years and 9.1 years respectively. biogas utilization as Clean Natural Gas (CNG) shows lower capital cost and higher profit than that of CHP system. CNG gasificaion after biogas purification is likely the best alternative for Biogas utilization which have more economic potential than CHP system. The withdrawal period of capital cost appeared to be 2.3 years.
Journal of the Korea Organic Resources Recycling Association
/
v.12
no.1
/
pp.67-74
/
2004
A bacterium which grow on phenol as an only carbon and energy source was isolated from the sewage sludge at Nangi municipal wastewater treatment plant in Seoul. This bacterium was found to be a Gram negative rod with high motility, and well grew on 0.05%, 0.1%, and 0.15% of phenol. No matching strain was found from the result of the BBL test. Phylogenetic analysis of the strain by comparison of the 16s-rDNA has revealed that this bacterium has 99% of similarity with Stenotrophomonas maltophilia strain of Xanthomonas group, which belongs t the Gamma (${\gamma}$) subdivision of Proteobacteria. This strain has also shown 98% of similarity with nitrogen fixing bacterium MAGDE3 and Pseudomonas cissicola strain, and 97% of similarity with Stenotrophomonas sp. LMG198 and Xanthomonas cucurbitae.
Kim, Won-Kyoung;Kim, Dong-Soo;Kang, Ji-Hoon;Chae, Kyu-Jung;Kim, Jung-Yeon;Lee, Chul-Hyung;Park, Wan-Soon
Proceedings of the Korea Water Resources Association Conference
/
2012.05a
/
pp.216-220
/
2012
본 연구는 경기도 용인시에 위치한 공공하수처리장을 대상으로 소수력발전 성능특성을 예측하고 경제성을 분석하여 소수력발전소의 건설타당성을 제시하였다. 방류구에서의 수준측량 조사에 따르면 실제 유효 낙차는 4.3m로 나타났다. 최근 5년간 방류량 자료를 살펴보면 일평균 실제 처리량은 약 $30,000m^3/day$로 나타났으며, 우수 유입과 물 사용량이 증가하는 여름 및 가을에 처리량이 증가하였다. 설계유량은 유량변화에 따른 누적 확률밀도와 유량지속곡선에 근거해 산정하였으며, 시간빈도로 보았을 때 17%의 유량이 지속되는 $0.35m^3/sec$가 설계유량으로 나타났다. 예상되는 수차 발전용량은 11kW급이며, 시스템 가동율은 74%, 그리고 계통선에 송출될 수 있는 연 전력생산량은 71.3MWh로 나타났다. 경제성 평가는 신재생에너지 경제성 분석 도구인 RETScreen 프로그램을 사용하여 B/C ratio, IRR, 개발투자비 등의 경제성 평가지표들을 산정하였다. 편익(Benefit) 산정시 전력기준단가는 133.67원/kWh, 할인율 7%를 적용하였으며, 비용(Cost) 산정시 유지관리비는 초기 건설비의 1%, 사용연한 30년을 적용하였다. 경제성 분석결과 기흥레스피아의 소수력발전소 건설시 초기 건설공사비가 $165,000 일 때, B/C 1.0, NPV $3,534, 투자회수기간 15.1년으로 산정되었고 따라서 초기 건설비용이 $165,000 이하일 때 가장 경제적인 것으로 파악되었다.
Journal of Korean Society of Environmental Engineers
/
v.22
no.11
/
pp.2047-2058
/
2000
The effects of operating parameters on performance of upflow anaerobic sludge blanket(UASB). anaerobic filter(AF), and two-stage anaerobic sludge bed filter (ASBF) bioreactors in treating swine wastewater were evaluated by operating the lab-scale bioreactors upto hydraulic retention time(HRT) of 1 day and organic loading rate (OLR) of $5.1kg-COD/m^3{\cdot}d$ for 200 days. Swine wastewaters of which characteristics were affected by types of hog raising and seasons contained high concentrations of COD, SS, and ammonia. Inoculation of the bioreactors with waste sludge from anaerobic treatment facility of local municipal wastewater treatment plant was effective in developing biomass in the bioreactors. Acclimation period of the bioreactors with swine wastewaters required approximately 40 days, but that for AF and two-stage ASBF, which were filled with media, was faster than VASB. The bioreactors showed high and stable COD removal efficiency of 77~91% at influent T-N concentrations of 370~800mg/L but low and unstable COD removal efficiency of 24~94% at influent T-N concentrations of 760~1,310mg/L. It is essential to remove ammonia prior to anaerobic treatment since the concentrations of ammonia in swine wastewaters showed toxic effects to methanogenic bacteria. The bioreactors were effective in treating swine wastewaters with COD removal efficiency of 78.9~81.5% and biogas generation rate of $0.39{\sim}0.59m^3/kg-COD_r$ at OLR of $1.1{\sim}2.2kg-COD/m^3{\cdot}d$: however, an increase of OLR by reducing HRT and increasing influent COD caused decrease of COD removal efficiency. The extent of decrease in COD removal efficiency was higher in UASB than AF and two-stage ASBF. AF and two-stage ASBF anaerobic bioreactors were effective in treating varing characteristics of swine wastewaters since they showed high and stable COD removal efficiency at high OLR due to effective retention of biomass by media and staging.
Journal of Korean Society of Environmental Engineers
/
v.22
no.1
/
pp.121-132
/
2000
This study is to investigate the performance of a new BNR process using predenitrification scheme focusing on nitrogen removal and the possibility of adapting a computer simulation scheme in BNR process development. By using a pre-denitrification basin, higher $COD/NO_3-N$ ratio could be sustained in this BNR process. The results of the investigation showed a SDNR value of 9.04mg/gMv/hr. In the anoxic tank, the average value of SPRR of 6.25mgP/gMv/hr was observed to be very sensitive to SCOD load of influents. By calibrating internal parameters (stoichiometric and kinetic parameters) of the simulation model, the results of simulation for various BNR processes gave good agreement with observed data. The major adjustment was given with three parameters, maximum specific growth rate of heterotrophic biomass, short chain fatty acid (SCFA) limit, and phosphorous release rate. With the series of simulations on varying operational conditions, the simulation by computer program can be a useful tool for process selection, and design and operation of municipal wastewater treatment plant.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.