• Title/Summary/Keyword: Multiple Supply

Search Result 621, Processing Time 0.04 seconds

Evaluating the Performance of Revenue Sharing Contract in Three Stage Supply Chain System

  • Chungsuk RYU
    • Journal of Distribution Science
    • /
    • v.22 no.1
    • /
    • pp.95-103
    • /
    • 2024
  • Purpose: Focusing on the complex supply chain operations beyond the simple dyadic relationship, this study evaluates the performance of the revenue sharing contract in three stage supply chain system. Research design, data, and methodology: The optimization model is developed to describe the supply chain system where one manufacturer, one wholesaler, and one retailer exist and pursue the maximum level of their own profits. In the numerical examples of the proposed supply chain model, two types of the revenue sharing contract, pairwise and spanning methods, are tested and their performances are compared with the traditional system. Results: The numerical analysis reveals that both types of the revenue sharing contract outperform the traditional system. All supply chain members can achieve the improved profits only when they determine the proper combination of revenue share ratios and price discount rates. Conclusions: This study finds out that both pairwise and spanning revenue sharing contracts can make the positive outcome that is acceptable to all members in three stage supply chain system. When the proper contract content is agreed among the supply chain members, the revenue sharing contract has the potential to be the practically feasible collaboration program for the multiple stage supply chain system.

Buyer-Supplier Collaboration and Benefit-Sharing Strategy in a Supply Chain (공급망 상생협력 활동과 성과 공유 전략)

  • Yoo, Seung-Ho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.36 no.1
    • /
    • pp.69-84
    • /
    • 2011
  • In this study, based on the principal-agent paradigm, we investigate a joint cost reduction activity in a buyer-supplier supply chain where a buyer motivates its operations department and a supplier to reduce the supply chain's production cost. We construct a benefit-sharing model based on the target cost scheme, a basic philosophy in practice which has not been explored in previous studies. The model also incorporates various supply chain issues such as the cooperation of multiple agents, the opportunity loss, and the degree of strategic relationship between the buyer and the supplier. Based on the analysis of the principal-agent model, we investigate the benefit-sharing rule to control agents' actions, and we also provide important managerial implications into supply chain practices via extensive comparative static analyses.

Analysis of Operation Plan by Multipurpose Supply for Heightened Agricultural Reservoir (둑높임저수지 다중용수공급에 따른 운영 방안 분석)

  • Kim, Hae Do;Lee, Kwang Ya;Park, Jong Yoon;Han, Guk Heon;Lim, Heung Chang
    • KCID journal
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • The aim of this study was to analyze the operation plan for heightened agricultural reservoir, in terms of water supply to downstream paddy fields and instreams. Operation of agricultural reservoir before the heightened reservoir project is easy to manage because of its single purpose, which is irrigation water supply. However, after proceeding the heightened project, there is needed to be set the operation rule because of its multiple purpose, which is water for irrigation and supply to the stream. In this paper, propose the method of design the criteria of supply to the stream and operation rule curve for the heightened reservoir. According to simulation results by proposed operating rule for the Gumsa reservoir, the yearly amount of water supply to the stream can be 2,588 thousand $m^3$, 3 times of the heightened space (2,588 thousand $m^3$).

  • PDF

Design of Gate Driver Power Supply for 3-Phase Inverter Using SiC MOSFET (SiC MOSFET를 사용한 3상 인버터용 게이트 드라이버 전원 설계)

  • Lee, Sangyong;Chung, Se-Kyo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.26 no.6
    • /
    • pp.429-436
    • /
    • 2021
  • The design of a gate driver power supply for a three-phase inverter using a silicon carbide (SiC) MOSFET. The requirements for the power supply circuit of the gate driver for the SiC MOSFET are investigated, and a flyback converter using multiple transformers is used to make the four isolated power supplies. The proposed method has the advantage of easily constructing the power supply circuit in a limited space as compared with a multi-output flyback converter using a single core. The power supply circuit for the three-phase SiC MOSFET inverter for driving an AC motor is designed and implemented. The operation and validity of the implemented circuit are verified through simulations and experiments.

Development of Optimal Network Model for Conjunctive Operation of Water Supply System with Multiple Sources (다수원 상수도시스템 연계운영을 위한 최적 네트워크 모형 구축)

  • Ryu, Tae-Sang;Ha, Sung-Ryong;Cheong, Tae-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.12
    • /
    • pp.1001-1013
    • /
    • 2011
  • Development of an optimal water supply system considering water quantity, quality, and economical efficiency is needed to decide optimal available area by combine water supply systems in overlapped area where are more than 2 water sources. The EPAnet and the KModSim were coupled to develop optimal network model. The developed network model was calibrated by measured data from water supply system in Geoje City, Korea in 2007 which have three water sources such as Sadeong booster pumping station, Guchun dam reservoir and Yoncho dam reservoir. The optimum network model was validated by operating results of 2011 to assess the economically optimized service area and optimal pump combination under the given hydraulic operating rules developed in this study. The developed model can be applied into designing water supply systems and operating rules for the conjunctive operation since the model can give the optimal solution satisfied with water quantity, economical efficiency and quality.

Real-time Water Supply Facilities Monitoring System based on the USN (USN 기반의 실시간 수도설비 모니터링 시스템)

  • Kim, Yong-Tae;Yoo, Neung-Hwan;Park, Gil-Cheol;Kim, Seok-Soo;Kim, Tai-Hoon;Lee, Sang-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.11 no.6
    • /
    • pp.1207-1213
    • /
    • 2007
  • This paper has researched water supply facilities management using real-time water utility monitoring system based on USN(Ubiquitous Sensor Network) which is consisted of wireless sensors transferring waterworks facilities md treatment information about a valve-room and flowmeter-room of water supply installation. In the manholes, it was installed with flowmeter, pressure sensors, vibration sensors, Co-sensors, and hydro-thermograph sensors. These measurement values which are received by PDA are used for facilities operation on the spot safely and conveniently. It has also provided safe installation management via CDMA(Code Division Multiple Access) network which transfers data to remote servers to monitoring at a distance place. With safety management system of water supply facilities on USN technology convenience and safety is increased in real situation, and it is expected that we can supply clean water to people as much safer and more effective water supply installation management.

Critical Assessment of Programme-Based Conflict Resolution Model Applied to Multiple Stakeholders Within The Context of Industrialized Building Production and Life Cycle Supply Chain System

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.551-562
    • /
    • 2022
  • The building production system has been analysed by the dichotomy "employer-contractor" relationship, which failed to take into account of the role and function of multiple stakeholders within the life-cycle supply chain. This is further observed in the current conflict resolution model, which, in my argument, struggles to contribute to industrialize the building production and achieve better efficiency and effectiveness as expected. The purpose of this paper is to critically assess the issues of current programme-based conflict resolution model, and discuss alternative models how they can be modelled and applied to the construction projects. The conclusions of findings are; First, the current model is framed around the contracts and dispute resolutions based on the legal concept of "claimant and respondent" where one party(s) advances a claim once and the other(s) objects, as such it fails to reflect the nature of construction projects where multiple stakeholders are involved concurrently and for a long period of life-cycle of buildings. Second, an alternative is "Six-stakeholders model" which represents the multiple stakeholders and clarifies the flow of obligation-liability-monetary relationships among participants for a long period of life-cycle of buildings. Further, with reference to both historical and recent cases, a reflection and insight into pros and cons of programming method is added, especially as to why this method is considered to have become a mandate of the modern construction management, and how academics and practitioners should deal with it more cautiously and prudently.

  • PDF

Joint Optimization of the Number of Suppliers and the Order Quantities Considering Compensation Orders under Supply Chain Disruptions (공급사슬 중단에 대비한 공급업체의 수와 주문량 및 보완주문 최적화 방안에 관한 연구)

  • Jin, Zhen-yan;Seo, Yong Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.42 no.2
    • /
    • pp.19-34
    • /
    • 2017
  • In this study, we develop an optimal sourcing strategy considering compensation orders to mitigate the supply chain disruption risks. We considered two-echelon supply chain consisting of a single buyer and multiple suppliers who have fixed transaction cost and probabilistic disruption risks. Under this setting, we provide the joint optimization method to determine the number of suppliers and the order quantities. Through numerical examples, we provide managerial implications on the sourcing strategy by investigating changes in the order quantities and the number of suppliers due to the degree of supply chain disruption risks.

Demand and Supply of Dental Manpower by the Econometrical Model (계량경제모델에 의한 치과의사 이력수급에 관한 연구)

  • 김용란;이승우
    • Journal of Oral Medicine and Pain
    • /
    • v.6 no.1
    • /
    • pp.45-56
    • /
    • 1981
  • The demand and supply of dentists was studied by the econometrical model. It is based on the data of socio-economic-cultural statistic from 1967 to 1977; GNP, average monthly consumption expenditure per household, consumption of milk, populat ion, consumption of energy, water supply per person a day and entrance rate of senior high school. 1.The curved regression equation and multiple correlation coefficient (R)between the number of dentists(Y) and year (x)were $Y=4,122(1.06)^x$,R=0.995. 2. From 1982 to 1985, expected demand and expected supply will be approximately balanced. But dentists will be oversupplied conspicuously from the year of 1986. Such a oversupply will be remarkably incresed to the amount of 1860 in the year of 2000. 3. It is seemed that balanced number of graduates of dental colleges will be about 350 to the year of 1985, from the year of 1986, will be about 450, from the year of 1981, will be about 600 and from the year of 1996, will be about 700. 4. In 2000, persons served by each dentist will be 3550 by the expected supply and 4120 by the expected demand.

  • PDF