• Title/Summary/Keyword: Multi-layer Construction Bladder

Search Result 1, Processing Time 0.014 seconds

Development of Internal Pressure Maintenance Equipment with Multi-layer Construction Bladder (다층구조 블래더를 이용한 내압제한장치 개발)

  • Baek, Nak-Gon;You, Gyong-Won;Jang, Ki-Won;Jun, Pil-Sun;Ha, Byoung-Geun;Lee, Beom-Cheol
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.335-337
    • /
    • 2009
  • Internal Pressure Maintenance Equipment absorbs internal pressure variation for it's storage has developed. The bladder ; main item of Internal Pressure Maintenance Equipment, has developed with multi-layer to prevent a penetration and to improve durability. And durability test and environment test was carried out to verify the performance in the condition that could be happened in storage or operation.

  • PDF