• Title/Summary/Keyword: Multi-heuristic Algorithm

Search Result 171, Processing Time 0.017 seconds

Greedy Heuristic Algorithm for a Multidepot Aircraft Scheduling and Crew Scheduling Problem (복수모기지의 항공기 운항계획및 승무계획 문제의 발견적 기법)

  • Jang, Byeong-Man;Park, Sun-Dal
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.11 no.2
    • /
    • pp.155-163
    • /
    • 1985
  • This paper presents a heuristic algorithm for a multidepot aircraft scheduling and crew scheduling with deal-head flights. This algorithm is extended from a Greedy heuristic algorithm for a multi-depot multi-salesman traveling salesman problem. We first transform a given flight schedule into a multi-depot multi-traveling salesman problem, considering aircraft flight policies and crew management constraints. Then we solve this problem by applying a modified Greedy heuristic algorithm.

  • PDF

On the Multi-Stage Group Scheduling with Dependent Setup Time (종속적 준비시간을 갖는 다단계 그룹가공 생산시스템에서의 그룹스케듈링에 관한 연구)

  • 황문영
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.31
    • /
    • pp.115-123
    • /
    • 1994
  • Group scheduling, which is a kind of operations scheduling based on the GT concept is analyzed in a multi-stage manufacturing system. The purpose of this research is to develop and evaluate a heuristic algorithm for determining gro up sequence and job sequence within each group to minimize a complex cost function, i.e. the sum of the total pe-nalty cost for tardiness and the total holding cost for flow time, in a multi-stage manufacturing system with group setup time dependent upon group sequence. A heuristic algorithm for group sc heduling is developed, and a numerical example is illustrated. For the evaluation of the pro-posed heuristic algorithm, the heuristic solution of each of 63 problems is compared with that of random scheduling. The result shows that the proposed heuristic algorithm provides better solution in light of the proposed cost function.

  • PDF

The Optimal Allocation Model for SAM Using Multi-Heuristic Algorithm : Focused on Aircraft Defense (복합 휴리스틱 알고리즘을 이용한 지대공 유도무기 최적배치 모형 : 항공기 방어를 중심으로)

  • Kwak, Ki-Hoon;Lee, Jae-Yeong;Jung, Chi-Young
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.34 no.4
    • /
    • pp.43-56
    • /
    • 2009
  • In korean peninsular, aircraft defense with SAM (Surface-to-Air Missile) is very important because of short range of combat space in depth. Effective and successful defense operation largely depends on two factors, SAM's location and the number of SAM for each target based on missile's availability in each SAM's location. However, most previous papers have handled only the former. In this paper, we developed Set covering model which can handle both factors simultaneously and Multi-heuristic algorithm for solving allocation problem of the batteries and missile assignment problem in each battery. Genetic algorithm is used to decide optimal location of the batteries. To determine the number of SAM, a heuristic algorithm is applied for solving missile assignment problem. If the proposed model is applied to allocation of SAM, it will improve the effectiveness of air defense operations.

The Optimal Allocation Model for SAM Using Multi-Heuristic Algorithm : Focused on Theater Ballistic Missile Defense (복합-휴리스틱 알고리즘을 이용한 지대공 유도무기(SAM) 최적배치 방안 : 탄도미사일 방어를 중심으로)

  • Lee, Jae-Yeong;Kwak, Ki-Hoon
    • IE interfaces
    • /
    • v.21 no.3
    • /
    • pp.262-273
    • /
    • 2008
  • In Korean peninsular, Air Defense with SAM(Surface-to-Air Missile) is very important, because of threatening by North Korea's theater ballistic missiles installed with nuclear or biochemistry. Effective and successful defense operation largely depends on two factors, SAM's location and the number of SAM for each target based on missile's availability in each SAM's location. However, most previous papers have handled only the former. In this paper, we developed Multi-heuristic algorithm which can handle both factors simultaneously for solving allocation problem of the batteries and missile assignment problem in each battery. To solve allocation problem, genetic algorithm is used to decide location of the batteries. To solve missile assignment problem, a heuristic algorithm is applied to determine the number of SAM for each target. If the proposed model is applied to allocation of SAM, it will improve the effectiveness of missile defense operations.

A Hybrid Heuristic Approach for Supply Chain Planningwith n Multi-Level Multi-Item Capacitated Lot Sizing Model (자원제약하의 다단계 다품목 공급사슬망 생산계획을 위한 휴리스틱 알고리즘)

  • Shin Hyun-Joon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.1
    • /
    • pp.89-95
    • /
    • 2006
  • Planning distributed manufacturing logistics is one of main issues in supply chain management. This paper proposes a hybrid heuristic approach for the Multi-Level, multi-item Capacitated Lot Sizing Problem (MLCLSP) in supply chain network. MLCLSP corresponds to a mixed integer programming (MIP) problem. With integer variable solutions determined by heuristic search, this MIP problem becomes linear program (LP). By repeatedly solving the relaxed MIP problems with a heuristic search method in a hybrid manner, this proposed approach allocates finite manufacturing resources fur each distributed facilities and generates feasible production plans. Meta heuristic search algorithm is presented to solve the MIP problems. The experimental test evaluates the computational performance under a variety of problem scenarios.

  • PDF

A heuristic algorithm for the multi-trip vehicle routing problem with time windows (시간제약을 가진 다회방문 차량경로문제에 대한 휴리스틱 알고리즘)

  • Kim Mi-Lee;Lee Yeong-Hun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1740-1745
    • /
    • 2006
  • This paper is concerned with a novel heuristic algorithm for the multi-trip vehicle routing problem with time windows. The objective function is the minimization of total vehicle operating time, fixed cost of vehicle and the minimization of total lateness of customer. A mixed integer programming formulation and a heuristic algorithm for a practical use are suggested. A heuristic algorithm is constructed two phases such as clustering and routing. Clustering is progressed in order to assign appropriate vehicle to customer, and then vehicle trip and route are decided considering traveling distance and time window. It is shown that the suggested heuristic algorithm gives good solutions within a short computation time by experimental result.

  • PDF

Group Scheduling Problem in Multi - Stage Manufacturing Systems with Dependent Setup time (준비시간(準備時間)이 종속인 다단계(多段階) 생산(生産) 시스템의 집단일정계획(集団日程計劃))

  • No, In-Gyu;Nam, Hui-Yeol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.2
    • /
    • pp.33-44
    • /
    • 1986
  • This research is concerned with group scheduling problems in multi-stage manufacturing system with dependent setup time. The objective of the research is to develop and evaluate a heuristic algorithm for determining group sequence and job sequence within each group to minimize total tardiness in multi-stage manufacturing systems with sequence dependent group setup time. The group scheduling heuristic algorithm is developed and evaluated by comparisons with twenty-seven problems with the known optimum solutions and 144,000 random schedules of a large variety problems. The results indicate that the proposed heuristic algorithm gets the same optimum solutions for the problems and also provides the good solutions in comparison with the random schedules of the large variety problems. A numerical example is given to illustrate the heuristic algorithm.

  • PDF

A Look-ahead Heuristic Algorithm for Large-scale Part-Machine Grouping Problems (대단위 부품-기계 군집 문제를 위한 Look-ahead 휴리스틱 알고리듬)

  • Baek Jong-Kwan;Baek Jun-Geol;Kim Chang Ouk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.3
    • /
    • pp.41-54
    • /
    • 2005
  • In this paper, we consider a multi-objective machine cell formation problem. This problem Is characterized as determining part route families and machine cells such that total sum of inter-ceil part movements and maximum machine workload imbalance are simultaneously minimized. Together with the objective function, alternative part routes and the machine sequences of part routes are considered In grouping Part route families. Due to the complexity of the problem, a two-phase heuristic algorithm is proposed. And we developed an n-stage look-ahead heuristic algorithm that generalizes the roll-out algorithm. Computational experiments were conducted to verify the performance of the algorithm.

Probabilistic Model for Performance Analysis of a Heuristic with Multi-byte Suffix Matching

  • Choi, Yoon-Ho
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.4
    • /
    • pp.711-725
    • /
    • 2013
  • A heuristic with multi-byte suffix matching plays an important role in real pattern matching algorithms. By skipping many characters at a time in the process of comparing a given pattern with the text, the pattern matching algorithm based on a heuristic with multi-byte suffix matching shows a faster average search time than algorithms based on deterministic finite automata. Based on various experimental results and simulations, the previous works show that the pattern matching algorithms with multi-byte suffix matching performs well. However, there have been limited studies on the mathematical model for analyzing the performance in a standard manner. In this paper, we propose a new probabilistic model, which evaluates the performance of a heuristic with multi-byte suffix matching in an average-case search. When the theoretical analysis results and experimental results were compared, the proposed probabilistic model was found to be sufficient for evaluating the performance of a heuristic with suffix matching in the real pattern matching algorithms.

Multi-Stage Group Scheduling with Dependent Setup Time (종속적(從屬的)인 준비시간을 갖는 다단계공정(多段階工程)에서의 그룹스케듈링 해법(解法))

  • Song, Yeong-U;No, In-Gyu;Kim, Man-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.11 no.2
    • /
    • pp.75-85
    • /
    • 1985
  • The application of GT results in the mass production effect to multi-product, small lot-sized production. Group scheduling, which is operations scheduling based on the GT concept, is analyzed in a multistage manufacturing system. But the research has been limited in independent setup time models. A heuristic algorithm has been developed to minimize the mean flow time when setup times are dependent to sequence of group in multistage. For evaluation of the heuristic algorithm, the solution of heuristic algorithm is compared with that of random scheduling. The result of comparison indicates that the proposed heuristic algorithm provides good solutions with relatively fewer computational effort.

  • PDF