A SCHEDULING TECHNIQUE FOR MULTIPLE RESOURCE ALLOCATION TO MULTIPLE PROJECTS IN CONSTRUCTION

  • K Ananthanarayanan;Murali Jagannathan
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.201-208
    • /
    • 2011
  • Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.

  • PDF

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

A Dual-Population Memetic Algorithm for Minimizing Total Cost of Multi-Mode Resource-Constrained Project Scheduling

  • Chen, Zhi-Jie;Chyu, Chiuh-Cheng
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.2
    • /
    • pp.70-79
    • /
    • 2010
  • Makespan and cost minimization are two important factors in project investment. This paper considers a multi-mode resource-constrained project scheduling problem with the objective of minimizing costs, subject to a deadline constraint. A number of studies have focused on minimizing makespan or resource availability cost with a specified deadline. This problem assumes a fixed cost for the availability of each renewable resource per period, and the project cost to be minimized is the sum of the variable cost associated with the execution mode of each activity. The presented memetic algorithm (MA) consists of three features: (1) a truncated branch and bound heuristic that serves as effective preprocessing in forming the initial population; (2) a strategy that maintains two populations, which respectively store deadline-feasible and infeasible solutions, enabling the MA to explore quality solutions in a broader resource-feasible space; (3) a repair-and-improvement local search scheme that refines each offspring and updates the two populations. The MA is tested via ProGen generated instances with problem sizes of 18, 20, and 30. The experimental results indicate that the MA performs exceptionally well in both effectiveness and efficiency using the optimal solutions or the current best solutions for the comparison standard.

Intelligent Document Management System based on Multi Agents (다중 에이전트 기반의 문서 관리 지원 시스템의 설계 및 구현)

  • 조홍진;이은석
    • Proceedings of the IEEK Conference
    • /
    • 1999.11a
    • /
    • pp.997-1000
    • /
    • 1999
  • It is becoming increasing1y the norm for project teams to be composed of individuals who are geographically distributed but connected by high speed network. In such environments a lot of work related documents are created, so there is real needs for the system that facilitate the effective sharing, maintaining. managing of them. This paper present the system that satisfy this needs, which is known as IDOMA(Intelligent Documents management system based on Multi Agent). IDOMA is the cooperative multi agent based documents management system which has not centralized database.

  • PDF

A MULTI-OBJECTIVE OPTIMIZATION FOR CAPITAL STRUCTURE IN PRIVATELY-FINANCED INFRASTRUCTURE PROJECTS

  • S.M. Yun;S.H. Han;H. Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.509-519
    • /
    • 2007
  • Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.

  • PDF

ECONOMIC ANALYSIS BY GLASS TYPES IN BALCONY CONVERSION OF MULTI-FAMILY HOUSING PROJECTS

  • H.G. Kim;D.I. Kim;D.W. Ko;T.H. Hong;C.T. Hyun;K.J. Koo
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.625-634
    • /
    • 2007
  • Energy-saving is one of important issues in multi-family housing projects in South Korea. According to the study by Yu et al. (2002), the balcony conversion causes energy loss approximately one and a half times. Therefore, it is important to select the economical glass type in the balcony window. In order to identify the most economical glass type of balcony conversion in multi-family housing projects, the most typical type of the multifamily housing projects in the metropolitan area was selected as a candidate project. The selected candidate project has been simulated using ENERGY-10 program to estimate the heat load by the different five types of glasses as well as their life cycle cost analysis (LCCA) using present worth method. Finally, sensitivity analysis has been conducted to determine the most economical glass types under a different discount rate (interest rate) and service life of building.

  • PDF

Development of a multi criteria decision analysis framework for the assessment of integrated waste management options for irradiated graphite

  • Abrahamsen-Mills, Liam;Wareing, Alan;Fowler, Linda;Jarvis, Richard;Norris, Simon;Banford, Anthony
    • Nuclear Engineering and Technology
    • /
    • v.53 no.4
    • /
    • pp.1224-1235
    • /
    • 2021
  • An integrated waste management approach for irradiated graphite was developed during the European Commission project 'Treatment and Disposal of Irradiated Graphite and other Carbonaceous Waste'. This included the identification of potential options for the management of irradiated graphite, taking account of storage, retrieval, treatment and disposal methods. This paper describes how these options can be assessed using multi-criteria decision analysis (MCDA) for a case study relating to a generic power reactor. Criteria have been defined to account for safety, environmental, economic and socio-political factors, including radiological impact, resource usage, economic costs and risks. The impact of each option against each criterion has been assessed using data from the project and the wider literature. A linear additive approach has been used to convert the calculated impacts to scores. To account for the relative importance of the criteria, example weightings were allocated. This application has shown that MCDA approaches can be used to support complex decisions regarding irradiated graphite management, accounting for a wide range of criteria. Use of this approach by individual countries or organisations will need to account for the specific options, scores, weightings and constraints that apply, based on their national strategies, regulatory requirements and public acceptability.

An algorithm for resolution of resource conflicts in scheduling

  • Han, Jaemin
    • Korean Management Science Review
    • /
    • v.9 no.1
    • /
    • pp.119-137
    • /
    • 1992
  • A two phase heuristic algorithm has been developed for the resolution of resource conflicts in a single project scheduling problem. Phase 1 of the algorithm generates a feasible schedule by repairing resource conflicts. Phase 2 finds local improvements in the schedule found in phase 1. Then, the algorithm has been applied to multi project and job shop scheduling. Computational results are compared with those of dispatching procedures. Index Terms-disjunctive constraints, heuristic algorithm, project scheduling, job-shop scheduling.

  • PDF

PROGRAM MANAGEMENT STRATEGY FOR THE MaCC PROJECT

  • Boknam Lee;Wooyoung Kim;Seokin Choi;Hyounseung Jang;Bonsang Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1582-1590
    • /
    • 2009
  • In 2006, Korean Government decided to relocate the several Government bodies and public institutes. They include total of 49 central Government agencies, semi-government agencies, and 17 national research institutes. The completion of the relocation program has been set to be final in 2030. The target population for the city plan is set to be 500,000. The goal of MAC is first to complete the first phase of the program by 2014 within the budget. In order to achieve the goal, considerable time has been spent to properly establish the program management system. The success of MAC's Multi-function Program Administration System is too early to determine as it is still in progressive. The success depends on the operations not the development.

  • PDF

Data-Driven Approaches for Evaluating Countries in the International Construction Market

  • Lee, Kang-Wook;Han, Seung H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.496-500
    • /
    • 2015
  • International construction projects are inherently more risky than domestic projects with multi-dimensional uncertainties that require complementary risk management at both the country and project levels. However, despite a growing need for systematic country evaluations, most studies have focused on project-level decisions and lack country-based approaches for firms in the construction industry. Accordingly, this study suggests data-driven approaches for evaluating countries using two quantitative models. The first is a two-stage country segmentation model that not only screens negative countries based on country attractiveness (macro-segmentation) but also identifies promising countries based on the level of past project performance in a given country (micro-segmentation). The second is a multi-criteria country segmentation model that combines a firm's business objective with the country evaluation process based on Kraljic's matrix and fuzzy preference relations (FPR). These models utilize not only secondary data from internationally reputable institutions but also performance data on Korean firms from 1990 to 2014 to evaluate 29 countries. The proposed approaches enable firms to enhance their decision-making capacity for evaluating and selecting countries at the early stage of corporate strategy development.

  • PDF