• Title/Summary/Keyword: Multi-Path

Search Result 1,445, Processing Time 0.025 seconds

Application of the GPS & EDM System for 3D Orthophoto in Small Area (소규모지역에서 3차원 정사사진 구현을 위한 GPS와 EDM의 적용)

  • Choi Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.5
    • /
    • pp.890-896
    • /
    • 2006
  • It's very difficult to acquire the accurate GCP(Ground Control Point) in the urban center and forest aerial photo because of occurring of irregular multi-path error. The purpose of this study is to apply the CPS and the EDM system for 3D orthophoto in the small areas. GCPs surveyed by accuracy triangulation from EDM after from triangulation points to a fiducial point at study area used to GPS. And I have a comment on how to use areal orthophoto for future 3D-GIS after 3D-Modelling using areal orthophoto. As the results, EDM surveying could resolve multi-path error according to GPS surveying and It is possible for using aerial orthophoto on the basis of the 3D-GIS database.

Time-Delay Estimation in the Multi-Path Channel based on Maximum Likelihood Criterion

  • Xie, Shengdong;Hu, Aiqun;Huang, Yi
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.6 no.4
    • /
    • pp.1063-1075
    • /
    • 2012
  • To locate an object accurately in the wireless sensor networks, the distance measure based on time-delay plays an important role. In this paper, we propose a maximum likelihood (ML) time-delay estimation algorithm in multi-path wireless propagation channel. We get the joint probability density function after sampling the frequency domain response of the multi-path channel, which could be obtained by the vector network analyzer. Based on the ML criterion, the time-delay values of different paths are estimated. Considering the ML function is non-linear with respect to the multi-path time-delays, we first obtain the coarse values of different paths using the subspace fitting algorithm, then take them as an initial point, and finally get the ML time-delay estimation values with the pattern searching optimization method. The simulation results show that although the ML estimation variance could not reach the Cramer-Rao lower bounds (CRLB), its performance is superior to that of subspace fitting algorithm, and could be seen as a fine algorithm.

A proposal on multi-agent static path planning strategy for minimizing radiation dose

  • Minjae Lee;SeungSoo Jang;Woosung Cho;Janghee Lee;CheolWoo Lee;Song Hyun Kim
    • Nuclear Engineering and Technology
    • /
    • v.56 no.1
    • /
    • pp.92-99
    • /
    • 2024
  • To minimize the cumulative radiation dose, various path-finding approaches for single agent have been proposed. However, for emergence situations such as nuclear power plant accident, these methods cannot be effectively utilized for evacuating a large number of workers because no multi-agent method is valid to conduct the mission. In this study, a novel algorithm for solving the multi-agent path-finding problem is proposed using the conflict-based search approach and the objective function redefined in terms of the cumulative radiation dose. The proposed method can find multi paths that all agents arrive at the destinations with reducing the overall radiation dose. To verify the proposed method, three problems were defined. In the single-agent problem, the objective function proposed in this study reduces the cumulative dose by 82% compared with that of the shortest distance algorithm in experiment environment of this study. It was also verified in the two multi-agent problems that multi paths with minimized the overall radiation dose, in which all agents can reach the destination without collision, can be found. The method proposed in this study will contribute to establishing evacuation plans for improving the safety of workers in radiation-related facilities.

Performance Analysis of HDR-WPAN System under Indoor Radio Channel (실내 무선채널에서 HDR-WPAN 시스템의 성능 분석)

  • Gang, Cheol-Gyu;O, Chang-Heon
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.277-283
    • /
    • 2005
  • In this paper, the performance of high data rate-wirelesss personal area network(HDR-WPAN) system is analyzed under multi-path indoor channel. In the analysis, Saleh and Valenzuel channel model is used for the multi-path indoor channel. From the results, HDR-WPAN system has reliability of 10-5 at Eb/No = 18.5dB in multi-path indoor channel. It is a suitable performance for high data rate personal area network applications.

  • PDF

A Mechanism of Finding QoS Satisfied Multi-Path in Wireless Sensor Networks

  • Kang, Yong-Hyeog
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.2
    • /
    • pp.37-44
    • /
    • 2017
  • Wireless sensor networks are composed of many wireless sensor nodes that are sensing the environments. These networks have many constraints that are resource constraints, wireless communication, self-construction, etc. But they have many applications that are monitoring environment, tracking the object, etc. In this paper, a mechanism of finding QoS Satisfied multi-path is proposed in wireless sensor networks. In order to satisfy the QoS requirement, the proposed mechanism extends the AODV protocol to find multiple paths from a source node to a destination node by using the additional AODV message types that are proposed. This mechanism will be used to support many QoS applications such as minimum delay time, the better reliability and the better throughput by using the QoS satisfied multi-path. Overheads of the proposed mechanism are evaluated using simulation, and it is showed that QoS satisfied multiple paths are found with a little more overhead than the AODV mechanism.

Uncertainty Analysis for the Multi-path Ultrasonic Flowmeter UR- 1000 with Dry Calibration (간접 교정에 의한 다회선 초음파유량계 UR-1000 불확도 분석)

  • Hwang, Shang-Yoon;Park, Sung-Ha;Park, Kyung-Am
    • 유체기계공업학회:학술대회논문집
    • /
    • 2002.12a
    • /
    • pp.378-386
    • /
    • 2002
  • Multi-path ultrasonic Sow measurement system uncertainty is determined by assigning an expected error of each component of flow measurement and then defining the total flow measurement uncertainty as square root of the sum of squared values of the individual error. Sources of uncertainty for flow measurement are geometry, transit time and velocity profile integration uncertainty. A theoretical uncertainty model for multi-path ultrasonic transit time flowmeter configured with parallel 5 chords, is derived from and calculated by dry calibration method.

  • PDF

Study on the Laser Scanning Path Creation Time of Rapid prototype Using Jewellery Data (쥬얼리 데이터를 이용한 쾌속조형장치의 주사경로 생성 시간에 관한 연구)

  • 한민식;김태호;김민주;이준희;전언찬
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.190-193
    • /
    • 2004
  • This paper presents studies on the creation time of scanning path using rapid prototype device. In the case of Jewellery, it needs to take time too much at the whole process of rapid prototype in accordance with heigh of the multi-layered. When increases the number of polygon by heigh of the Multi-layered, it has proper influence on the creation time of scanning path. Therefore, we can get the spending time and the number of polygon for the creation during increase the heigh of the multi-layered. These values are showed by the quantitative. We try to analyze relation between these and heigh of the multi-layered.

  • PDF

A Study on Vibration Transfer Path Identification of Vehicle Driver's Position by Multi-dimensional Spectral Analysis (다차원 스펙트럼 해석법을 이용한 차실내 운전자석 진동전달경로 규명에 관한 연구)

  • Lee, You-Yub;Park, Sang-Gil;Oh, Jae-Eung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.17 no.8
    • /
    • pp.741-746
    • /
    • 2007
  • In this study, transfer path identification and output estimation are simulated by multi-dimension spectral analysis method (MDSA). Multi -input/single-output system give expression the vehicle suspension which each inputs are correlated reciprocally. In case of correlating with inputs, the system needs separating the each input signal by MDSA. Main simulations are about finding effective input by coherent output spectrum and selecting optimal input's number by multiple coherence function. Also, by shielding transfer path of each input, transfer path characteristic is identified in terms of overall integrated contribution level.

Flowrate Integration Errors of Multi-path Ultrasonic Flowmeter using Weighting Factors (가중계수에 의한 다회선 초음파 유량계의 유량적분오차)

  • Lee, Ho-June;Hwang, Shang-Yoon;Kim, Kyoung-Jin
    • 유체기계공업학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.154-160
    • /
    • 2003
  • Multi-path ultrasonic flowrate measuring technology is being received much attentions from a variety of industrial fields to exactly measure the flowmeter. Multi-path ultrasonic flowmeter has much advantage since it has no moving parts and not occurred pressure loss. It offers good accuracy, repeatability, linearity and Tum-down ratio can measure over 1:50. The present study investigates flowrate integration errors using weighting factors. A theoretical flow model uses power law to describe a fully developed velocity profiles and wall roughness changes. The methods of weighting factor simulate three configurations of measuring location of gaussian, chebyshev and tailor method. The obtained results show that many chord arrangements are not affected for wall roughness changes and can measure accurate flowrate.

  • PDF

Studies on Post Contract Schedule Analysis (준공현장의 분쟁해결방안으로서의 사후적 공정분석에 관한 연구)

  • KIHYUK, KO;SUNGPIL, PARK;YONGKIL, KIM
    • Journal of Arbitration Studies
    • /
    • v.32 no.4
    • /
    • pp.103-141
    • /
    • 2022
  • Traditionally, schedule analysis in Korea has been used, mainly through the Critical Path Method, to evaluate the claim for extension of time and/or the amount of liquidated damages for delay. Critical path method, however, cannot identify the delay event and its impact occurred in non-critical path especially in multi facility projects. In multi facility projects that comprise several independent but related facilities or structures, each facility has its own facility critical path the duration of which will be impacted by facility specific critical delays. Thus, only through the non-critical delay analysis along with the critical delay analysis damages not attributable to contractors may be remedied in full. Because all the records and pictures can reveal what has actually happened in post contract review, only the retrospective analysis rather than the prospective analysis based on the assumptions can establish the cause and allocate the each parties' responsibilities appropriately.