Chung, Eun-Sung;Jun, Sang-Mook;Lee, Jin Hee;Ahn, Jong Ho
Journal of Korean Society on Water Environment
/
v.29
no.2
/
pp.259-269
/
2013
This study aims to show the feasibility of wastewater reuse through hydrological analysis and propose a framework for planning using multi-criteria decision making technique. Ten alternatives of wastewater reuse (BOD: 3.0 mg/L & 4.7 mg/L) and two references in the urban watershed were considered and analyzed by using Hydrological Simulation Program in Fortran (HSPF). Though wastewater reuse has a positive effect on water quantity, it may degrade the water quality due to the high discharge concentration. This study showed that wastewater reuse can be a great alternative for the rehabilitation of distorted water cycle, if the quality is improved up to the natural streamflow and the quantity is increased up to the instreamflow requirement. In addition, to determine the project priority, three criteria were compared: 1) impacts on water quantity and water quality, respectively, 2) consideration of present hydrologic vulnerabilities on water quantity and quality and not, and 3) social and economic considerations and not. From the performance values to all criteria, the specific ranking can be derived and the feasibility of each wastewater reuse project can be checked with the comparison of the existing facilities. As a result, DJ and DR were derived to become effective in any evaluation conditions while SS and WG were improper alternatives if various criteria were considered. The decision making for project prioritization must be careful with the consideration of various impacts of wastewater reuse because the evaluation of wastewater reuse alternative showed very different priorities for each criteria.
Four programs, i.e. TRMM, ADEOS2, ASTER, and ALOS are going on in Japanese Earth Observation programs. TRMM and ASTER are operating well, and TRMM operation will be continued to 2009. ADEOS2 was failed, but AMSR-E on Aqua is operating. ALOS (Advanced Land Observing Satellite) was successfully launched on $24^{th}$ Jan. 2006. ALOS carries three instruments, i.e., PRISM (Panchromatic Remote Sensing Instrument for Stereo Mapping), AVNIR-2 (Advanced Visible and Near Infrared Radiometer), and PALSAR (Phased Array L band Synthetic Aperture Radar). PRISM is a 3 line panchromatic push broom scanner with 2.5m IFOV. AVNIR-2 is a 4 channel multi spectral scanner with 10m IFOV. PALSAR is a full polarimetric active phased array SAR. PALSAR has many observation modes including full polarimetric mode and scan SAR mode. After the unfortunate accident of ADEOS2, JAXA still have plans of Earth observation programs. Next generation satellites will be launched in 2008-2012 timeframe. They are GOSAT (Greenhouse Gas Observation Satellite), GCOM-W and GCOM-C (ADEOS-2 follow on), and GPM (Global Precipitation Mission) core satellite. GOSAT will carry 2 instruments, i.e. a green house gas sensor and a cloud/aerosol imager. The main sensor is a Fourier transform spectrometer (FTS) and covers 0.76 to 15 ${\mu}m$ region with 0.2 to 0.5 $cm^{-1}$ resolution. GPM is a joint project with NASA and will carry two instruments. JAXA will develop DPR (Dual frequency Precipitation Radar) which is a follow on of PR on TRMM. Another project is EarthCare. It is a joint project with ESA and JAXA is going to provide CPR (Cloud Profiling Radar). Discussions on future Earth Observation programs have been started including discussions on ALOS F/O.
The rapid trends toward outsourcing have created more complex and fragmented multi-tier supply chains for Engineering, Procurement & Construction(EPC) industry. Working with suppliers and sub-suppliers requires continuous integration activities during project execution. The purpose of this study is to identify the factors influencing the performances and relationship satisfaction of second-tier suppliers participating in the project-based supply chain. This study proposes the network embeddedness, collaboration, information-sharing and flexibility as antecedents variables, and collected the survey responses from the second-tier suppliers having experiences with complex projects. The statistical results indicate that the collaboration with supply chain leading firm and first-tier supplier has significant impact on the performances and relationship satisfaction of second-tier suppliers. It was also found that the information-sharing and flexibility influence the network embeddedness as well as collaboration, and that the embeddedness have significant impact on the collaboration.
In late 1980s, many suburban cities in Tokyo metropolitan area have tried to construct office parks, such as Makuhari New Town, Minato Mirai 21 to promote knowledge based economy. As the most important player of this mesa project, the local government mobilized local resources from various private sectors. The local government adopted place marketing strategy to attract companies and consumers with thick pocket. The composition of this strategy embraces publicity, uniqueness, centrality of function and information and comfortability for formation of the office park. Headquarters and producer service offices were relocated in the suburban office parks for the first time in the history of modem Tokyo since 1920s. Although it is the ongoing project that encounters some financial difficulties, the office park Project will be a sound foundation for future growth of knowledge-based economy.
The Burj Dubai Project will be the tallest structure ever built by man; when completed the tower will be more than 700 meter tall and more than 160 floors. While the early integration of aerodynamic shaping and wind engineering considerations played a major role in the architectural massing and design of this multi-use/residential tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria, the material selection for the structural systems of the tower was also a major consideration and required detailed evaluation of the material technologies and skilled labor available in the market at the time Concrete was selected for its strength, stiffness, damping, redundancy, moldability, free fireproofing, speed of construction, and cost effectiveness. In addition, the design challenges of using concrete for the design of the structural system components will be addressed. The focus on this paper will also be on the early planning of the concrete works of the Burj Dubai Project.
Korean Journal of Construction Engineering and Management
/
v.7
no.4
s.32
/
pp.91-99
/
2006
The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.
This study is that MD-FDA and the existing method were applied together the outlet project under the construction in the Gulpo River basin. The results of both of them mot the economic feasibility of the Project. But, MD-FDA evaluated the suitable damage according to situations; 1) without project, 2) after 20m outlet construction, 3) after 80m outlet construction. That is, MD-FDA could exactly evaluate the Annual Expected Flood Damage by considering the characteristics to the inundated area. If M-FDA may use in the flood control projects, the projects will be able to be taken into account all characteristics of the total damage area and performed by reasonable criteria.
Hyo Sub Jun;Kuhyun Yang;Jongyeon Kim;Jin Pyeong Jeon;Jun Hyong Ahn;Seung Jin Lee;Hyuk Jai Choi;Jong Wook Choi;Sung Min Cho;Jong-Kook Rhim
Journal of Korean Neurosurgical Society
/
v.66
no.5
/
pp.488-493
/
2023
We aimed to develop a cloud-based telemedicine platform for patients with intracerebral hemorrhage (ICH) at local hospitals in rural and underserved areas in Gangwon-do using artificial intelligence and non-face-to-face collaboration treatment technology. This is a prospective and multi-center development project in which neurosurgeons from four university hospitals in Gangwon-do will participate. Information technology experts will verify and improve the performance of the cloud-based telemedicine collaboration platform while treating ICH patients in the actual medical field. Problems identified will be resolved, and the function, performance, security, and safety of the telemedicine platform will be checked through an accredited certification authority. The project will be carried out over 4 years and consists of two phases. The first phase will be from April 2022 to December 2023, and the second phase will be from April 2024 to December 2025. The platform will be developed by dividing the work of the neurosurgeons and information technology experts by setting the order of items through mutual feedback. This article provides information on a project to develop a cloud-based telemedicine platform for acute ICH patients in Gangwon-do.
International conference on construction engineering and project management
/
2013.01a
/
pp.640-647
/
2013
Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.
Journal of the Korean Association of Geographic Information Studies
/
v.13
no.2
/
pp.64-73
/
2010
This research collected some multi-image information of Nakdong River Estuary Eulsukdo area in last 30 years, which are used as the basis information in running the qualitative analysis of the topography relief's deformation. First, to obtain the data, this research carried out a field survey and GCP measurement, then classified and collected the image information by analog and digital image. The acquired images which have passed a high-precise scan process and geometric correction is manufactured by Ortho Mosaic image, then divided them into 9 sections time period classification before we run a qualitative analysis. In late of 1980's there are many changes of environmental topography deformation of the Eulsukdo area which caused by large scale building constructions, appeared to be known through this research. And then in late of 1990's, we organized the wild cultivated lands, started the wetland restoration of the artificial ecology, in 2000's we are able to know the existence of topograph relief change which caused by big scale of bridge construction. Hereafter, in this quick process of the environmental and topographical change of this area caused by the 4 major rivers restoration project, the analysis results of this experiment are expected to be something applicable as important basic data.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.