• Title/Summary/Keyword: Multi Project

Search Result 789, Processing Time 0.034 seconds

A Study on Evaluation and Prioritization Process of Wastewater Reuse Alternative in Watershed Level (유역차원의 하수처리수 재이용 대안평가와 우선순위 결정과정에 관한 연구)

  • Chung, Eun-Sung;Jun, Sang-Mook;Lee, Jin Hee;Ahn, Jong Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.2
    • /
    • pp.259-269
    • /
    • 2013
  • This study aims to show the feasibility of wastewater reuse through hydrological analysis and propose a framework for planning using multi-criteria decision making technique. Ten alternatives of wastewater reuse (BOD: 3.0 mg/L & 4.7 mg/L) and two references in the urban watershed were considered and analyzed by using Hydrological Simulation Program in Fortran (HSPF). Though wastewater reuse has a positive effect on water quantity, it may degrade the water quality due to the high discharge concentration. This study showed that wastewater reuse can be a great alternative for the rehabilitation of distorted water cycle, if the quality is improved up to the natural streamflow and the quantity is increased up to the instreamflow requirement. In addition, to determine the project priority, three criteria were compared: 1) impacts on water quantity and water quality, respectively, 2) consideration of present hydrologic vulnerabilities on water quantity and quality and not, and 3) social and economic considerations and not. From the performance values to all criteria, the specific ranking can be derived and the feasibility of each wastewater reuse project can be checked with the comparison of the existing facilities. As a result, DJ and DR were derived to become effective in any evaluation conditions while SS and WG were improper alternatives if various criteria were considered. The decision making for project prioritization must be careful with the consideration of various impacts of wastewater reuse because the evaluation of wastewater reuse alternative showed very different priorities for each criteria.

JAXA'S EARTH OBSERVING PROGRAM

  • Shimoda, Haruhisa
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.7-10
    • /
    • 2006
  • Four programs, i.e. TRMM, ADEOS2, ASTER, and ALOS are going on in Japanese Earth Observation programs. TRMM and ASTER are operating well, and TRMM operation will be continued to 2009. ADEOS2 was failed, but AMSR-E on Aqua is operating. ALOS (Advanced Land Observing Satellite) was successfully launched on $24^{th}$ Jan. 2006. ALOS carries three instruments, i.e., PRISM (Panchromatic Remote Sensing Instrument for Stereo Mapping), AVNIR-2 (Advanced Visible and Near Infrared Radiometer), and PALSAR (Phased Array L band Synthetic Aperture Radar). PRISM is a 3 line panchromatic push broom scanner with 2.5m IFOV. AVNIR-2 is a 4 channel multi spectral scanner with 10m IFOV. PALSAR is a full polarimetric active phased array SAR. PALSAR has many observation modes including full polarimetric mode and scan SAR mode. After the unfortunate accident of ADEOS2, JAXA still have plans of Earth observation programs. Next generation satellites will be launched in 2008-2012 timeframe. They are GOSAT (Greenhouse Gas Observation Satellite), GCOM-W and GCOM-C (ADEOS-2 follow on), and GPM (Global Precipitation Mission) core satellite. GOSAT will carry 2 instruments, i.e. a green house gas sensor and a cloud/aerosol imager. The main sensor is a Fourier transform spectrometer (FTS) and covers 0.76 to 15 ${\mu}m$ region with 0.2 to 0.5 $cm^{-1}$ resolution. GPM is a joint project with NASA and will carry two instruments. JAXA will develop DPR (Dual frequency Precipitation Radar) which is a follow on of PR on TRMM. Another project is EarthCare. It is a joint project with ESA and JAXA is going to provide CPR (Cloud Profiling Radar). Discussions on future Earth Observation programs have been started including discussions on ALOS F/O.

  • PDF

A Study on the Effect of Network Embeddedness on Collaboration and Performance in the Project Supply Chain : Focusing on Second-tier Suppliers (프로젝트 공급망에서 네트워크 배태성이 협업과 기업성과에 미치는 영향연구 : 2차 협력업체를 중심으로)

  • Park, Seong Taek;Rhe, MoonKi Kyle;Ryu, Seonjeong
    • Journal of Digital Convergence
    • /
    • v.12 no.6
    • /
    • pp.93-103
    • /
    • 2014
  • The rapid trends toward outsourcing have created more complex and fragmented multi-tier supply chains for Engineering, Procurement & Construction(EPC) industry. Working with suppliers and sub-suppliers requires continuous integration activities during project execution. The purpose of this study is to identify the factors influencing the performances and relationship satisfaction of second-tier suppliers participating in the project-based supply chain. This study proposes the network embeddedness, collaboration, information-sharing and flexibility as antecedents variables, and collected the survey responses from the second-tier suppliers having experiences with complex projects. The statistical results indicate that the collaboration with supply chain leading firm and first-tier supplier has significant impact on the performances and relationship satisfaction of second-tier suppliers. It was also found that the information-sharing and flexibility influence the network embeddedness as well as collaboration, and that the embeddedness have significant impact on the collaboration.

Real Estate Development and Place Marketing Strategy in Dimension of Spatial Policy - A Case Study of Tokyo Metropolitan Area - (공간정책수단으로서 부동산개발과 장소마케팅전략 - 동경대도시권을 사례로 -)

  • 이정훈
    • Journal of the Korean Geographical Society
    • /
    • v.37 no.1
    • /
    • pp.61-74
    • /
    • 2002
  • In late 1980s, many suburban cities in Tokyo metropolitan area have tried to construct office parks, such as Makuhari New Town, Minato Mirai 21 to promote knowledge based economy. As the most important player of this mesa project, the local government mobilized local resources from various private sectors. The local government adopted place marketing strategy to attract companies and consumers with thick pocket. The composition of this strategy embraces publicity, uniqueness, centrality of function and information and comfortability for formation of the office park. Headquarters and producer service offices were relocated in the suburban office parks for the first time in the history of modem Tokyo since 1920s. Although it is the ongoing project that encounters some financial difficulties, the office park Project will be a sound foundation for future growth of knowledge-based economy.

Design and Construction of the Burj Dubai Concrete Building Project (버즈 두바이 콘크리트 건물의 설계와 시공)

  • Abdelrazaq, Ahmad
    • Magazine of the Korea Concrete Institute
    • /
    • v.20 no.6
    • /
    • pp.28-35
    • /
    • 2008
  • The Burj Dubai Project will be the tallest structure ever built by man; when completed the tower will be more than 700 meter tall and more than 160 floors. While the early integration of aerodynamic shaping and wind engineering considerations played a major role in the architectural massing and design of this multi-use/residential tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria, the material selection for the structural systems of the tower was also a major consideration and required detailed evaluation of the material technologies and skilled labor available in the market at the time Concrete was selected for its strength, stiffness, damping, redundancy, moldability, free fireproofing, speed of construction, and cost effectiveness. In addition, the design challenges of using concrete for the design of the structural system components will be addressed. The focus on this paper will also be on the early planning of the concrete works of the Burj Dubai Project.

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.

Multi-Dimensional Flood Damage Analysis (Ⅱ): Application (다차원 홍수피해산정방법 (Ⅱ): 적용)

  • Choi, Seung-An;Yi, Choong-Sung;Shim, Myung-Pil;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.1 s.162
    • /
    • pp.11-22
    • /
    • 2006
  • This study is that MD-FDA and the existing method were applied together the outlet project under the construction in the Gulpo River basin. The results of both of them mot the economic feasibility of the Project. But, MD-FDA evaluated the suitable damage according to situations; 1) without project, 2) after 20m outlet construction, 3) after 80m outlet construction. That is, MD-FDA could exactly evaluate the Annual Expected Flood Damage by considering the characteristics to the inundated area. If M-FDA may use in the flood control projects, the projects will be able to be taken into account all characteristics of the total damage area and performed by reasonable criteria.

Development of Cloud-Based Telemedicine Platform for Acute Intracerebral Hemorrhage in Gangwon-do : Concept and Protocol

  • Hyo Sub Jun;Kuhyun Yang;Jongyeon Kim;Jin Pyeong Jeon;Jun Hyong Ahn;Seung Jin Lee;Hyuk Jai Choi;Jong Wook Choi;Sung Min Cho;Jong-Kook Rhim
    • Journal of Korean Neurosurgical Society
    • /
    • v.66 no.5
    • /
    • pp.488-493
    • /
    • 2023
  • We aimed to develop a cloud-based telemedicine platform for patients with intracerebral hemorrhage (ICH) at local hospitals in rural and underserved areas in Gangwon-do using artificial intelligence and non-face-to-face collaboration treatment technology. This is a prospective and multi-center development project in which neurosurgeons from four university hospitals in Gangwon-do will participate. Information technology experts will verify and improve the performance of the cloud-based telemedicine collaboration platform while treating ICH patients in the actual medical field. Problems identified will be resolved, and the function, performance, security, and safety of the telemedicine platform will be checked through an accredited certification authority. The project will be carried out over 4 years and consists of two phases. The first phase will be from April 2022 to December 2023, and the second phase will be from April 2024 to December 2025. The platform will be developed by dividing the work of the neurosurgeons and information technology experts by setting the order of items through mutual feedback. This article provides information on a project to develop a cloud-based telemedicine platform for acute ICH patients in Gangwon-do.

READINESS OF NIGERIAN BUILDING DESIGN FIRMS TO ADOPT BUILDING INFORMATION MODELLING (BIM) TECHNOLOGIES

  • Mu'awiya Abubakar;Yahaya Makarfi Ibrahim;Kabir Bala
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.640-647
    • /
    • 2013
  • Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.

  • PDF

Change Analysis of Eulsukdo Wetland Using Qualitative Multi-temporal Image Data (다중시기 영상자료를 이용한 을숙도 습지 지역의 정성적 변화분석)

  • Lee, Jae-One;Kim, Yong-Suk;We, Gwang-Jae
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.13 no.2
    • /
    • pp.64-73
    • /
    • 2010
  • This research collected some multi-image information of Nakdong River Estuary Eulsukdo area in last 30 years, which are used as the basis information in running the qualitative analysis of the topography relief's deformation. First, to obtain the data, this research carried out a field survey and GCP measurement, then classified and collected the image information by analog and digital image. The acquired images which have passed a high-precise scan process and geometric correction is manufactured by Ortho Mosaic image, then divided them into 9 sections time period classification before we run a qualitative analysis. In late of 1980's there are many changes of environmental topography deformation of the Eulsukdo area which caused by large scale building constructions, appeared to be known through this research. And then in late of 1990's, we organized the wild cultivated lands, started the wetland restoration of the artificial ecology, in 2000's we are able to know the existence of topograph relief change which caused by big scale of bridge construction. Hereafter, in this quick process of the environmental and topographical change of this area caused by the 4 major rivers restoration project, the analysis results of this experiment are expected to be something applicable as important basic data.