한옥의 모듈러 공법 적용에 관한 연구 (Study on the Application of Modular Technologies to Han-ok)

  • 이창재;임석호
    • 한국주거학회논문집
    • /
    • 제23권4호
    • /
    • pp.49-57
    • /
    • 2012
  • This study was conducted to apply the modular construction method to Han-ok. The modular method, which is differentiated from the existing one, means a construction method that equipments, windows and interior materials are prefabricated as a six-sided object at a plant and then they are assembled at the least process on the spot. As for the theoretical observation, the theoretical basis to apply the modular method to the modular housing and Hanok was divided into environmental and economic aspect. In order to apply the modular method to Hanok, the unit scale and size were selected and the plane of unit module Hanok was developed. And a standard with regard to the unit combination and material lifting transportation method was set and planned. In addition, through the comparison the unit modular Hanok to the existing Hanok, the difference was analyzed and the strength was identified in terms fo design method, structure, construction method, period and cost. In final, the conclusion, with regard to the economic, technical application in future, was drawn through arranging the study contents. The unit modular Hanok to carry out the high-quality dwelling through construction period reduction, standardized construction materials and improved insulation performance can meet the demands for a paradigm of new construction technology.

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

BLE 기술 기반 비콘을 활용한 모듈러 건축 현장 프로세스 제안 (Application of BLE-based Beacon in Modular Construction Process)

  • 김창재;강남우;권우빈;김하림;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.36-37
    • /
    • 2021
  • OSC(Off-Site Construction) is regarded as a faster and more economical method in the construction industry, and the attention towards the OSC is growing. In the modular construction process, which is one type of OSC, accurate identification of a module is essential. Because the installation position and the MEP(Mechanical, Electrical, and Plumbing) composition are distinct between modules, a defect in the finishing or junction area is likely to happen during the construction process. This study suggested the modular construction process by applying a beacon receiver using BLE(Bluetooth Low Energy) technology on each module. Construction quality management would be improved using the location and assembly data, particularly for a different module in modular construction.

  • PDF

한국형 모듈러 주택 시공의 시나리오 개발 (Development of a Korean Modular Housing Construction Scenario)

  • 김균태;김창한;이두헌;이영호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.81-83
    • /
    • 2011
  • A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.

  • PDF

모듈러 건축에서의 안전사고 원인 분석 및 저감방안 - 제작 및 시공단계 작업을 중심으로 - (Cause Analysis and Reduction of Safety Accident in Modular Construction - Focusing on Manufacturing and Construction Process -)

  • 정길수;이현수;박문서;현호상;김현수
    • 대한건축학회논문집:구조계
    • /
    • 제35권8호
    • /
    • pp.157-168
    • /
    • 2019
  • Modular Construction is regarded as having enhanced safety compared to traditional construction since most of modular manufacturing process in plants. Unlike general consideration for safety in modular construction, several industrial accident data and studies have pointed out that the accident rate of modular construction is not enough less as much as the practitioners have expected. It means that there is a clear need for improvement of safety management in modular construction. To enhance safety, it is necessary to identify the type and cause of accident through accident cases in order to prevent safety accident in advance. In this consideration, this study analyzed the types and causes of accidents through root cause analysis procedure with accident cases of U.S. OSHA. The classification was carried out in the order of process type, accident type and cause of accident. By following the classification criteria in this study, the causal factor was derived and the root cause map was created. Based on the analysis results, cross-analysis was conducted and it is shown that activity characteristics of modular construction are related to safety accidents. In addition, prevention methods to reduce safety accident by major activity are presented in terms of organizational, educational and technical aspects. This study contributes that the result can be used as the basic safety management in the manufacturing and construction process of modular construction.

Steel Module-to-Concrete Core Connection Methods in High Rise Modular Buildings: A Critical Review

  • Poudel, Bishal;Lee, Seungtaek;Choi, Jin Ouk
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.571-578
    • /
    • 2022
  • Modularization in a high-rise building is different from a small building, as it is exposed to more lateral forces like wind and earthquakes. The integrity, robustness, and overall stability of the modules and their performance is based on the joining techniques and strong structural systems. High lateral stiff construction structures like concrete shear walls and frames, braced steel frames, and steel moment frames are used for the stability of high-rise modular buildings. Similarly, high-rise stick-built buildings have concrete cores and perimeter frames for lateral load strength and stiffness. Methods for general steel-concrete connections are available in many works of literature. However, there are few modular-related papers describing this connection system in modular buildings. This paper aims to review the various research and practice adopted for steel-to-concrete connections in construction and compare the methods between stick-built buildings and modular buildings. The literature review shows that the practice of steel module-to-concrete core connection in high-rise modular buildings is like outrigger beams-to-concrete core connection in stick-built framed buildings. This paper concludes that further studies are needed in developing proper guidelines for a steel module-to-concrete core connection system in high-rise modular buildings.

  • PDF

국내 모듈러주택의 설계표준화를 위한 구조대 모듈정합 설계기준 및 사례 (MC Design Standards and Practices for Design Standardization of Domestic Modular Housing)

  • 정준수;임석호;백정훈;설욱제
    • 대한건축학회논문집:계획계
    • /
    • 제34권4호
    • /
    • pp.19-25
    • /
    • 2018
  • At present, there are many companies that can produce modular housing. However, if the housing projects are conducted without design standards and principles, each company will supply housing according to its own design standards, resulting in a loss of opportunity to promote standardization at a national level. Korea's modular construction technology is still in its infancy, and there is a lack of MC design applications due to the limited construction market. In recent years, however, related R&D has been carried out by the Ministry of Land, Infrastructure and Transport in order to activate modular construction. As a result, test-beds for public rental housing are currently being built, and the public rental housing applied with the modular construction method is expected to spread in the near future. In this regard, this study seeks to promote more economical and efficient production and supply of modular housing. To this end, it investigates the current status of modular construction, analyzes the problems and proposes a serious of MC design standards as part of the design standardization and open system for modular housing industry to solve the problems.

시공사례 분석을 통한 모듈러 주택 원가절감 우선순위 항목 도출 (Priority Derivation of Modular House Cost Reduction Factors through Case Analysis)

  • 류국무;문예지;조병후
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2016
  • Modular construction is attracting attention as the solution of recent problems in construction site. Such as lack of construction workforce, increasing labor costs, work delay due to extreme weather events and strengthening government regulations. However, despite the many advantages, Modular construction has not been activated dueto high construction costs compared to other construction methods. Accordingly, the object of this study is priority derivation of prefabricated house cost reduction factors and use as basic research data. For research performance, we have analyzed the blueprint and bill of quantities of a modular construction based public dormitory which was built in 2013. In result, the proportion of modular construction and on-site construction is 66% and 34%, and the construction cost proportion by activity was devided in to construction(79%), machinery(7%), electricity(5%) and civil(9%). Among these results in order to reduce costs, interior finishing(19.4) steel-frame(16.9%), metal works(13.5%), RC(11.8%), joinery(7.3%) is the order requires focused management.

  • PDF

Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

5D BIM Tool을 활용한 모듈러시스템의 효율성 연구 (A Study on Modular System Efficiency using 5D BIM Tool)

  • 김민웅;황인호;옥종호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.208-209
    • /
    • 2013
  • Recently, there is a growing interest in BIM and modular method because of changing in users attitudes about quality of building and construction environment. however, In domestic, study on Modular method still have addressed primarily basic contents. This study check efficiency about this process through comparative analysis of Modular method and RC method used 5D BIM tool for real project and suggest a fitting schedule management method for modular method.