• Title/Summary/Keyword: Model Embankment

Search Result 244, Processing Time 0.024 seconds

Evaluation of The Seepage Behavior for Reinforced Embankment (보강제체사면의 침투거동평가)

  • 신방웅;안병철
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.1
    • /
    • pp.146-152
    • /
    • 2000
  • To estimate the behavior of reinforced and unreinforced embankment constructed on a impermeable foundation ground, a laboratory model test was performed for two types of soils and water level increasing velocity of a flood period. The experiment models were constructed with slopes of water level is 1.25cm/min, 2.5cm/min each. From model test results, as the slope of reinforced and unreinforced embankment was the slower, the more seepage line rised. In the unreinforced embankment, the rising velocity of water level was the faster, the larger the embankment failure was. And the reinforced embankment with geotextile was the more safe than the unreinforced embankment for seepage force.

  • PDF

Characteristics of Reservoir Behavior According to Establishment Range of Waterproof Mat During Overflow (차수매트 포설 범위에 따른 저수지 월류시 거동 특성)

  • Kim, Young-Ik;Lee, Ik-Sang;Choi, Don-Hwan;Im, Eun-Sang;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.2
    • /
    • pp.59-66
    • /
    • 2010
  • This study was performed to develop the embankment protection method that can reduce demage by prevention of embankment loss and collapse from overflow due to heavy rain and flood. For overflow test, model dam was prepared and embankment behaviors were monitored with the established piezometer and strain meter during overflow. As a result of overflow test for model dam, in case of embankment without waterproof mat, the lower end of embankment was collapsed within 40 seconds after beginning of overflow. On the other hand, in case of embankment with waterproof mat, embankment collapse didn't occurred during overflow. Accordingly, establishment of waterproof mat for embankment showed that be absolutely effective for the embankment protection during overflow in reservoir. Also, it showed that the minimum establishment range of waterproof mat to prevent embankment collapse in reservoir is from maximum storage level to the lower end of embankment.

Model Tests for Vertical Loads Acting on Embankment Piles (성토지지말뚝에 작용하는 연직하중에 대한 모형실험)

  • 홍원표;강승인
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.4
    • /
    • pp.171-181
    • /
    • 2000
  • A series of model tests were performed both to investigate the load transfer by soil acrching in fills above embankment pils and to verify of the theoretical analysis. In the model tests, the piles were installed in a row below the embankment and the cap beams were placed on the pile heads perpendicular to the longitudinal axias of the embankment. The space between pile cap beams and the embankment height was focused as the major factors affecting the load transfer in embankment fill. When the embankment fill was higher than the minimum required height, which was about 33% higher than the radius of the soil arch proposed by theoretical discussion in the previous study, not only the soil arching could be developed completely but also the experimental results showed good agreement with theoretical predictions. The portion of the embankment load carried by model pile cap beams decreased with increment of the space between pile cap beams, while it increased with increment of the embankment height. Therefore, to maximize the effect of embankment load transfer by piles on design, the interval ratio of pile cap beams should be decreased under considerably high embankments by reducing the space between cap beams and/or enlarging the width of pile cap beams.

  • PDF

Settlement Behavior Of High Rock Embankment With Construction Path (시공이력을 반영한 고성토 암버력 지반의 침하거동 분석)

  • Bae, Kyung-Tae;Kim, Tae-Hoon;Kang, In-Kyu;Lee, Won-Je;Yu, Nam-Jae;Lee, Kang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.956-962
    • /
    • 2009
  • A high embankment is generally constructed by dividing into several sub-embankments. Unlike any soil embankment, a rock embankment is constructed by means of dynamic compaction. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements and large plate loading tests.

  • PDF

Seismic evaluation of Southern California embankment dam systems using finite element modeling

  • Kamalzare, Mehrad;Marquez, Hector;Zapata, Odalys
    • Geomechanics and Engineering
    • /
    • v.31 no.3
    • /
    • pp.319-328
    • /
    • 2022
  • Ensuring the integrity of a country's infrastructure is necessary to protect surrounding communities in case of disaster. Embankment dam systems across the US are an essential component of infrastructure, referred to as lifeline structures. Embankment dams are crucial to the survival of life and if these structures were to fail, it is imperative that states be prepared. Southern California is particularly concerned with the stability of embankment dams due to the frequent seismic activity that occurs in the state. The purpose of this study was to create a numerical model of an existing embankment dam simulated under seismic loads using previously recorded data. The embankment dam that was studied in Los Angeles, California was outfitted with accelerometers provided by the California Strong Motion Instrumentation Program that have recorded strong motion data for decades and was processed by the Center for Engineering Strong Motion Data to be used in future engineering applications. The accelerometer data was then used to verify the numerical model that was created using finite element modeling software RS2. The results from this study showed Puddingstone Dam's simulated response was consistent with that experienced during previous earthquakes and therefore validated the predicted behavior from the numerical model. The study also identified areas of weakness and instability on the dam that posed the greatest risk for its failure. Following this study, the numerical model can now be used to predict the dam's response to future earthquakes, develop plans for its remediation, and for emergency response in case of disaster.

Crack Propagation in Earth Embankment Subjected to Fault Movement (단층 운동시 댐 파괴 거동 해석)

  • 손익준
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1988.06c
    • /
    • pp.3-67
    • /
    • 1988
  • Model studies on the response of homgeneous earth embankment dams subjected to strike-slip fault movement have been penomed via centrifuge and finite element analysis. The centrifuge model tests have shown that crack development in earth embankment experiences two major patters: shear failure deep inside the embankment and tension failure near the surface. The shear rupture zone develops from the base level and propagates upward continuously in the transverse direction but allows no open leakage chnnel. The open tensile cracks develop near the surface of the embankment, but they disappear deep in the embankment. The functional relationship has been developed based on the results of the centrifuge model tests incorporating tile variables of amount of fault movement, embankment geometry, and crack propagation extent in earth des. This set of information can be used as a guide line to evaluate a "transient" safety of the duaged embankment subjected to strike-slip fault movement. The finite element analysis has supplemented the additional expluations on crack development behavior identified from the results of the centrifuge model tests. The bounding surface time-independent plasticity soil model was employed in the numerical analysis. Due to the assumption of continuum in the current version of the 3-D FEM code, the prediction of the soil structure response beyond the failure condition was not quantitatively accurate. However, the fundamental mechanism of crack development was qualitatively evaluated based on the stress analysis for the deformed soil elements of the damaged earth embankment. The tensile failure zone is identified when the minor principal stress of the deformed soil elements less than zero. The shear failure zone is identified when the stress state of the deformed soil elements is at the point where the critical state line intersects the bounding surface.g surface.

  • PDF

The safety behavior of agricultural reservoirs due to raising the embankment

  • Lee, Dalwon;Lee, Younghak
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.3
    • /
    • pp.243-252
    • /
    • 2013
  • This study was carried out to investigate safety evaluation of agricultural reservoirs due to raising the embankment. The seepage analysis and large-scale model test were performed to compare and analyze the pore water pressure(PWP), leakage quantity, settlement and piping phenomenon in the inclined core type and the vertical core type embankments. The PWP after raising the embankment showed smaller than before raising the embankment and the stability for piping after raising the embankment. The allowable seepage quantity and the allowable leakage for the steady state and transient conditions is within the range of safe management standard. After raising the embankment in the inclined core, there was no infiltration by leakage. For the vertical core, the PWP showed a large change by faster infiltration of pore water than in the inclined core. In a rapid drawdown, inclined core was remained stable but the vertical core showed a large change in PWP. Settlement after raising the embankment showed larger amounts of settlement than before raising the embankment. The leakage quantity before raising the embankment and the inclined core type showed no leakage. From the result, an instrument system that can accurately estimate a change of PWP shall be established for the rational maintenance and stabilization of raising the embankment for agricultural reservoirs.

Laboratory Model Tests on the Load Transfer in Geosynthetic-Reinforced and Pile-Supported Embankment System (토목섬유보강 성토지지말뚝시스템에서의 하중전이 효과에 관한 모형실험)

  • Hong, Won-Pyo;Lee, Jae-Ho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.3
    • /
    • pp.9-18
    • /
    • 2010
  • A series of model tests were performed to investigate the load transfer by soil arching in geosynthetic-reinforced and pile-supported(GRPS) embankment systems. In the model tests, model piles with isolated cap were inserted in the model container and geosynthetics was laid on the pile caps below sand fills. The settlement of soft ground was simulated by rubber form. The loads acting on pile caps and the tensile strain of geosynthetics were monitored by data logging system. At the given interval ratio of pile caps, the efficiency in GRPS embankment systems increased with increasing the height of embankment fills, then gradually converged at constant value. Also, at the given height of embankment fills, the efficiency decreased with increasing the pile spacing. The embankment loads transferred on pile cap by soil arching increased when the geosynthetics installed with piles. This illustrated that reinforcing with the geosynthetics have a good effect to restraint the movement of surrounding soft grounds. The load transfer in GRPS embankment systems was affected by the interval ratio, height of fills, properties of grounds and tensile stiffness and so on.

  • PDF

The Characteristics for Seepage Behaviour of Soil Structure by Modeling Tests (모형실험에 의한 토공구조물의 침투거동특성)

  • 신방웅;강종범
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.4
    • /
    • pp.158-167
    • /
    • 1999
  • In parallel flow condition, to estimate the stability of the extended embankment constructed on a permeable foundation ground, a laboratory model test was performed due to extended materials and water level increasing velocity of a flood period. A laboratory model test was peformed for different permeability coefficients ($K_1=2.0{\times}10^{-5}cm/sec,\;K_2=1.5{\times}10^{-4}cm/sec,\;K_3=2.3{\times}10^{-3}cm/sec$) using seepage. The fluctuation of water level occurring to an extended embankment was analyzed by laboratory model tests as vary the increasing velocity of water level with 0.6cm/min, 1.2cm/min, 2.4cm/min respectively. In analysis results, the increase of water level into embankment occurs rapidly because seepage water moving along with a permeable soil flow into embankment. The larger the permeability coefficient of an extended part is the longer initial seepage distance, and the exit point of downstream slope is gradually increased and then shows unstable seepage behavior as occurring partial collapse. As the increasing velocity of water level increase, the initial seepage line is formed low, and the discharge increases. Therefore, the embankment extended by a lower permeable soil than existing embankment shows stable seepage behavior because an existing embankment plays a role as filter for an extended part.

  • PDF

Variation of Slope Stability under rainfall considering Train Speed (열차의 속도 하중을 고려한 강우시 성토사면의 안정성 변화)

  • 김정기;김현기;박영곤;신민호;김수삼
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.601-607
    • /
    • 2002
  • Infiltration of rainfall causes railway embankment to be unstable and may result in failure. Basic relationship between the stability of railway embankment and rainfall introducing the partial saturation concept of ground are defined to analyze the stability of embankment by rainfall. A pressure plate test is also peformed to obtain soil-water characteristic curve of unsaturated soils. Based on this curve, the variables in the shear strength function and permeability function are also defined. These functions are used fur the numerical model for evaluation of railway embankments under rainfall. As comparing the model and case studies, the variation of shear strength, the degree of saturation and pore-water pressure for railway embankment during rainfall can be predicted and the safety factor of railway embankment can be expressed as the function of rainfall amount namely rainfall index. Therefore, the research on safety factor on railway embankment considering train speed and rainfall infiltration with the variation of rainfall intensity and rainfall duration was carried out in this paper.

  • PDF