• Title/Summary/Keyword: Model Clash

Search Result 22, Processing Time 0.023 seconds

Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability

  • Seo, Jung-Ho;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.299-314
    • /
    • 2012
  • One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means of a 3D product model. In the conventional construction project process, clashes have been found during construction phase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at design phase, relevant business process and guide for this task should be provided. This study aims to identify hindrances in clash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenience of IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasks according to business process. For this reason, in this research, Business Process Model and Notation (BPMN) is introduced to provide ideal process and required decision making governance. The provide BPMN model will provide insights for a BIM-based collaborative environment to enhance the constructability through the construction project.

VIRTUAL CONSTRUCTION OF TRANSFER FLOORS IN REINFORCED CONCRETE BUILDING USING BIM

  • Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.12-16
    • /
    • 2011
  • Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.

  • PDF

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

Estimate of Wave Overtopping Rate on Armoured Slope Structures Using FUNWAVE-TVD Model (FUNWAVE-TVD 모델을 이용한 경사구조물의 월파량 산정)

  • Moon Su Kwak
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.36 no.1
    • /
    • pp.11-19
    • /
    • 2024
  • In this study, the program was modified by adding the empirical formula of EurOtop (2018) to enable calculation of wave overtopping on armoured slope structures in the FUNWAVE-TVD model using the fully nonlinear Boussinesq equation. The validity of the modified numerical model was verified by comparing it with CLASH data and experiment data for the rubble mound structure. This model accurately reproduced the change in wave overtopping rate according to the difference in the roughness factor of the armoured block, and well reproduced the rate of decrease in wave overtopping rate due to the increase in relative freeboard. The overtopping rate of the armoured slope structures showed significant differences depending on the positioning condition of the armoured blocks. When Tetrapods were placed with regular positioning, the overtopping rate increased significantly compared to when they were placed with random positioning, and it was consistent with when they were placed with Rocks. Meanwhile, when rocks were placed in one row, the wave overtopping rate was greater than when rocks were placed in two rows, which is believed to be due to the influence of the roughness and permeability of the structure's surface.

Musculoskeletal model during isokinetic knee motion;Simulation and Experiment (슬관절 등속 운동시 하지근육구동모델;모의실험과 임상실험)

  • Bae, Tae-Soo;Cho, Hyeon-Seok;Kang, Sung-Jae;Choi, Kyong-Joo;Kim, Shin-Ki;Mun, Mu-Seong
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.1554-1559
    • /
    • 2003
  • This study validated the musculoskeletal model of the human lower extremity by comparative study between calculated muscle parameters through simulation using modified hill-type model and measured them through isokinetic exercise. And the relationship between muscle forces and moments participated in motion was quantified from the results of simulation. For simulation of isokinetic motion, a three-dimensional anatomical knee model was constructed using trials of gait analysis and the EMG-force model was used to determine muscle activation level exciting muscles. The modified Hill-type model was used to calculate individual muscle forces and moments in dynmaic analysis and the results were validated by comparing them of experiments on BIODEX. The results showed that there was a high correlation between calculated torques from simulation and measured them from experiments for isokinetic motion(R=0.97). Therefore we concluded that the simulation by using musculoskeletal model was so useful means to predict and convalesce musculoskeletal-related diseases, and analyze unrealizable experiment such as clash condition.

  • PDF

Legal Culture and Commercial Arbitration in the United States and Japan

  • Kim, Chin-Hyon;Chung, Yong-Kyun
    • Journal of Arbitration Studies
    • /
    • v.23 no.3
    • /
    • pp.185-212
    • /
    • 2013
  • In this paper, a conceptual model of legal culture based on Ehrlich's "living law" theory and Cole's social-cultural explanation can explain the low utilization rates of arbitration of Japan and the high utilization rates of arbitration in the United States, simultaneously. This model highlights the clash between social norms and legal provisions in Japan. Japan has developed a two-tiered system of dispute resolution. At the official level, Japanese people accept the legal system imposed by the outside world. But, at a deeper level, they utilize diverse forms of informal dispute resolution mechanisms, such as reconcilement and conciliation, reflecting their own social norms. In contrast, there is no conflict between social norms and legal provisions in United States. This study may show that there are distinctions between American-style arbitration and Japanese-style arbitration, reflecting their own respective social norms. The question of reconciliation between the American style of arbitration and the Japanese style of arbitration can be resolved by an international arbitrator.

  • PDF

A MBASE-based Development Method for Ubiquitous Computing Systems (MBASE를 적용한 유비쿼터스 컴퓨팅 시스템 개발 방법론)

  • Kim, Sangsoo;Lee, Donghyun;In, Hoh
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.5-11
    • /
    • 2005
  • Ubiquitous computing is an emerging technic for various areas such as public, private (individual), military, industrial, medical sectors. The applications of ubiquitous computing are expected to be prevailed from home to office. Unfortunately, it is not effective to apply existing system/software development methodologies into this emerging ubiquitous computing applications. In this paper, MBASE (Model-Based system Architecting and Software Engineering) is applied as a development method of ubiquitous computing applications. The advantage of MBASE is to identify mismatches of product, process, property, and success models and resolve them in developing the ubiquitous computing applications. A SmartView, a ubiquitous computing application, is presented as a case study o f MBASE.

  • PDF

Information Modeling for BIM Based Design of Precast Concrete Platform (BIM 기반의 설계를 위한 프리캐스트 콘크리트 승강장의 정보모델링)

  • Jeong, Ji-Sook;Lee, Kwang-Myong;Park, Ki-Hyun;Park, Young-Shik
    • Journal of KIBIM
    • /
    • v.4 no.1
    • /
    • pp.1-7
    • /
    • 2014
  • The construction method using PC(Precast Concrete) has been widely used because the method can shorten the construction period and improve construction quality. In this paper, through the analysis of present design process for PC railway platform, design parameters on the geometry and properties were extracted and 3D information models for PC railway platform were constructed by the parametric modeling technique. Furthermore, the interface module was developed to link 3D models to the structural analysis/design sheet and database program using VBA(Visual Basic Application). This information model could be used in various areas including structural analysis and design, 2D drawing, quantity estimation and 4D simulation including clash detection.

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

A Study on the Communication Strategy to Risk Management of Agri-marine Products Distribution Policy (농수산물 유통정책의 위기관리에 따른 커뮤니케이션전략에 관한 연구 - 유통정책 갈등해소에 대한 스캐닝, 모니터링을 중심으로)

  • Kim, Man-Ki
    • Journal of Digital Convergence
    • /
    • v.6 no.1
    • /
    • pp.63-73
    • /
    • 2008
  • The present study attempted to explore effective scanning and monitoring in process of risk management on agri-marine products distribution policy. The interest public's group interests clash in accordance with theme for issue on marking policy. For executing a better systematic scanning and monitoring on actual affairs of marketing, selecting information personnel, gathering and analysing information, issue and risk management and their valuation with ongoing and simultaneously. Especially, In order to explore effective scanning and monitoring as a model of risk management, the study attempted to analyze within and without environment of marketing, to analyze issue management strategy, to evaluate issue activity for likelihood and impact, risk cycle analysis, interest public's group concerned, grade of interest public's group threatened(power, legitimacy, willingness), rapport(staying close, credibility, meeting expectation). And the study make an ongoing observation progress of subjects, and the serious subjects need have made an close observation. The study suggested to establish friendly relationship between organization and interest public's group, and to regularly accomplish two-way symmetric communication.

  • PDF