• Title/Summary/Keyword: Mission Trajectory Design

Search Result 52, Processing Time 0.02 seconds

Mission Design and Analysis based on SEM Angle by Using Variable Coast During 3.5 Earth-Moon Phasing Loop Transfer (Variable Coast를 이용하는 3.5 지구-달 위상전이궤적에서 SEM 각도에 따른 임무설계 및 해석)

  • Choi, Su-Jin;Lee, Donghun;Lim, Seong-Bin;Choi, Suk-Won
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.46 no.1
    • /
    • pp.68-77
    • /
    • 2018
  • In order to analyze the overall characteristics of the lunar orbiter, the Variable Coast method, which can be launched everyday, is applied to the 3.5 phasing loop transfer trajectory. The mission scenario for the entire process from launching to entering the lunar orbit is set up and performed simulation by selecting the launch pad and launch vehicle. In particular, the SEM(Satellite-Earth-Moon) angle defined in Earth-Moon rotating frame is an important constraint to comprehensively evaluate the 3.5 phasing loop transfer trajectory. The simulation using SEM angle is analyzed from various viewpoints such as launch epoch, coast duration, perigee altitude and ${\Delta}V$ not only trans-lunar trajectory but lunar orbit insertions and the optimum SEM angle is suggested in this study. It is expected that this results will be helpful to evaluate the characteristics of the 3.5 phasing loop transfer trajectory according to the launch vehicle selection by comparison with Fixed Coast analysis results in the future.

Analysis of Delta-V Losses During Lunar Capture Sequence Using Finite Thrust

  • Song, Young-Joo;Park, Sang-Young;Kim, Hae-Dong;Lee, Joo-Hee;Sim, Eun-Sup
    • Journal of Astronomy and Space Sciences
    • /
    • v.28 no.3
    • /
    • pp.203-216
    • /
    • 2011
  • To prepare for a future Korean lunar orbiter mission, semi-optimal lunar capture orbits using finite thrust are designed and analyzed. Finite burn delta-V losses during lunar capture sequence are also analyzed by comparing those with values derived with impulsive thrusts in previous research. To design a hypothetical lunar capture sequence, two different intermediate capture orbits having orbital periods of about 12 hours and 3.5 hours are assumed, and final mission operation orbit around the Moon is assumed to be 100 km altitude with 90 degree of inclination. For the performance of the on-board thruster, three different performances (150 N with $I_{sp}$ of 200 seconds, 300 N with $I_{sp}$ of 250 seconds, 450 N with $I_{sp}$ of 300 seconds) are assumed, to provide a broad range of estimates of delta-V losses. As expected, it is found that the finite burn-arc sweeps almost symmetric orbital portions with respect to the perilune vector to minimize the delta-Vs required to achieve the final orbit. In addition, a difference of up to about 2% delta-V can occur during the lunar capture sequences with the use of assumed engine configurations, compared to scenarios with impulsive thrust. However, these delta-V losses will differ for every assumed lunar explorer's on-board thrust capability. Therefore, at the early stage of mission planning, careful consideration must be made while estimating mission budgets, particularly if the preliminary mission studies were assumed using impulsive thrust. The results provided in this paper are expected to lead to further progress in the design field of Korea's lunar orbiter mission, particularly the lunar capture sequences using finite thrust.

Mission Orbit Design of CubeSat Impactor Measuring Lunar Local Magnetic Field

  • Lee, Jeong-Ah;Park, Sang-Young;Kim, Youngkwang;Bae, Jonghee;Lee, Donghun;Ju, Gwanghyeok
    • Journal of Astronomy and Space Sciences
    • /
    • v.34 no.2
    • /
    • pp.127-138
    • /
    • 2017
  • The current study designs the mission orbit of the lunar CubeSat spacecraft to measure the lunar local magnetic anomaly. To perform this mission, the CubeSat will impact the lunar surface over the Reiner Gamma swirl on the Moon. Orbit analyses are conducted comprising ${\Delta}V$ and error propagation analysis for the CubeSat mission orbit. First, three possible orbit scenarios are presented in terms of the CubeSat's impacting trajectories. For each scenario, it is important to achieve mission objectives with a minimum ${\Delta}V$ since the CubeSat is limited in size and cost. Therefore, the ${\Delta}V$ needed for the CubeSat to maneuver from the initial orbit toward the impacting trajectory is analyzed for each orbit scenario. In addition, error propagation analysis is performed for each scenario to evaluate how initial errors, such as position error, velocity error, and maneuver error, that occur when the CubeSat is separated from the lunar orbiter, eventually affect the final impact position. As a result, the current study adopts a CubeSat release from the circular orbit at 100 km altitude and an impact slope of $15^{\circ}$, among the possible impacting scenarios. For this scenario, the required ${\Delta}V$ is calculated as the result of the ${\Delta}V$ analysis. It can be used to practically make an estimate of this specific mission's fuel budget. In addition, the current study suggests error constraints for ${\Delta}V$ for the mission.

A Study for Controllability, Stability by Optimal Control of Load and Angular Velocity of Flying Objects using the Spiral Predictive Model(SPM) (나선 예측 모델에서의 비행체 하중수 및 각속도 최적 제어에 의한 제어성과 안정성 성능에 관한 연구)

  • Wang, Hyun-Min
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.3
    • /
    • pp.268-272
    • /
    • 2007
  • These days many scientists make studies of feedback control system for stability on non-linear state and for the maneuver of flying objects. These feedback control systems have to satisfy trajectory condition and angular conditions, that is to say, controllability and stability simultaneously to achieve mission. In this paper, a design methods using model based control system which consists of spiral predictive model, Q-function included into generalized-work function is shown. It is made a clear that the proposed algorithm using SPM maneuvers for controllability and stability at the same time is successful in attaining our purpose. The feature of the proposed algorithm is illustrated by simulation results. As a conclusion, the proposed algorithm is useful for the control of moving objects.

Optimal battery selection for hybrid rocket engine

  • Filippo, Masseni
    • Advances in aircraft and spacecraft science
    • /
    • v.9 no.5
    • /
    • pp.401-414
    • /
    • 2022
  • In the present paper, the optimal selection of batteries for an electric pump-fed hybrid rocket engine is analyzed. A two-stage Mars Ascent Vehicle, suitable for the Mars Sample Return Mission, is considered as test case. A single engine is employed in the second stage, whereas the first stage uses a cluster of two engines. The initial mass of the launcher is equal to 500 kg and the same hybrid rocket engine is considered for both stages. Ragone plot-based correlations are embedded in the optimization process in order to chose the optimal values of specific energy and specific power, which minimize the battery mass ad hoc for the optimized engine design and ascent trajectory. Results show that a payload close to 100 kg is achievable considering the current commercial battery technology.

KOREAN MARS MISSION DESIGN USING KSLV-III (KSLV-III를 이용한 한국형 화성 탐사 임무의 설계)

  • Song, Young-Joo;Yoo, Sung-Moon;Park, Eun-Seo;Park, Sang-Young;Choi, Kyu-Hong;Yoon, Jae-Cheol;Yim, Jo-Ryeong;Choi, Joon-Min;Kim, Byung-Kyo
    • Journal of Astronomy and Space Sciences
    • /
    • v.23 no.4
    • /
    • pp.355-372
    • /
    • 2006
  • Mission opportunities and trajectory characteristics for the future Korean Mars mission have designed and analyzed using KSIV-III(Korea Space Launch Vehicle-III). Korea's first space center, 'NARO space center' is selected as a launch site. For launch opportunities, year 2033 is investigated under considering the date of space center's completion with KSLV series development status. Optimal magnitude of various maneuvers, Trans Mars Injection (TMI) maneuver, Trajectory Correction Maneuver (TCM), Mars Orbit Insertion (MOI) maneuver and Orbit Trim Maneuver(OTM), which are required during the every Mars mission phases are computed with the formulation of nonlinear optimization problems using NPSOL software. Finally, mass budgets for upper stage (launcher for KSIV-III and spacecraft are derived using various optimized maneuver magnitudes. For results, daily launch window from NARO space center for successful Korean Mars mission is avaliable for next 27 minutes starting from Apr. 16. 2033. 12:17:26 (UTC). Maximum spacecraft gross mass which can delivered to Mars is about 206kg, with propellant mass of 109kg and structure mass of 97kg, when on board spacecraft thruster's Isp is assumed to have 290 sec. For upper stage, having structure ratio of 0.15 and Isp value of 280 sec, gross mass is about 1293kg with propellant mass of 1099kg and structure mass of 194kg. However, including 10% margins to computed optimal maneuver values, spacecraft gross mass is reduced to about 148kg with upper stage's mass of 1352kg. This work will give various insights, requiring performances to developing of KSIV-III and spacecraft design for future Korean Mars missions.

Preliminary Mission Design of Transfer Orbit of a Lunar Lander Launched by a Korean Space Launch Vehicle (국내 발사체를 이용한 달착륙선 발사시 전이 궤도 예비 임무 설계)

  • Song, Eun-Jung;Lee, Sang-il;Choi, iyoung;Sun, Byung-Chan;Roh, Woong-Rae
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.50 no.12
    • /
    • pp.867-875
    • /
    • 2022
  • The preliminary mission analysis of a lunar lander, which is mounted on the upper stage of a Korean space launch vehicle, is performed when landing on the moon through a trans-lunar injection maneuver after being injected into the earth's low orbit by th launcher in this paper. Both direct landing and orbital landing methods, which have each advantage and disadvantages, are applied and their transfer orbit characteristics are analyzed according to the launch date when launching in lunar October 2030. We also analyzed the launch dates which satisfying eclipse conditions, solar elevation conditions, and tracking time intervals such as the US lunar lander Surveyor-1. The obtained results show that the most appropriate launch date is the 4th day of lunar October in case of direct landing method, and the 3rd day in case of indirect landing method, since the argument of perigee of the trans-lunar injection orbit and eclipse conditions are favorable in the dates.

An Orbital Design Method for Satellite Formation Flying

  • Cui Hai-Ying;Li Jun-Feng;Gao Yun-Feng
    • Journal of Mechanical Science and Technology
    • /
    • v.20 no.2
    • /
    • pp.177-184
    • /
    • 2006
  • An orbital design method of the formation initialization based on the relative orbital element method is presented. It firstly constructed the relative motion equation of the satellite formation flying in terms of the leader and followers' orbital elements. Then the equation was simplified when the orbit eccentricity of the leader satellite was small. And according to the satellites' mission, a general design method for the relative trajectory was proposed. The advantage of this method is that one can get a very simple analytical formula of each follower satellite's orbital elements when the orbital eccentricity of the leader satellite is zero. The simulation results show that the method is effective.

Design and Analysis of Korean Lunar Orbiter Mission using Direct Transfer Trajectory (직접 전이궤적을 이용한 한국형 달 궤도선 임무설계 및 분석)

  • Choi, Su-Jin;Song, Young-Joo;Bae, Jonghee;Kim, Eunhyeuk;Ju, Gwanghyeok
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.12
    • /
    • pp.950-958
    • /
    • 2013
  • The Lunar orbiter is expected to be inserted into a ~300km low Earth orbit using Korea Space Launch Vehicle-II(KSLV-II). After the states are successfully determined with obtained tracking data, the Trans Lunar Injection(TLI) burn has to be done at appropriate epoch to send the lunar orbiter to the Moon. In this study, we describe in detail the mission scenario of the Korean lunar orbiter from the launch at NARO Space Center to lunar orbit insertion(LOI) stage following direct transfer trajectory. We investigate the launch window including launch azimuth, delta-V profile according to TLI and LOI burn positions. We also depict the visibility conditions of ground stations and solar eclipse duration to understand the characteristics of the direct transfer trajectory. This paper can be also helpful not only for overall understanding of ${\Delta}V$ trend by changing TOF and coasting time but for selecting launch epoch and control parameters to decrease fuel consumption.

The design of Ground Flight Termination System for Space Launch Application (위성발사를 위한 지상국비행종단지령장비 설계)

  • Lee, Sung-Hee;Bae, Young-Jo;Oh, Chang-Yul;Lee, Hyo-Keun
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.229-235
    • /
    • 2008
  • The ground flight termination system(GFTS) could be used for the termination of launch vehicle in flight motion when the launch vehicle deviates from the designated route due to the system malfunction or failure as well as the launch vehicle can't be tracked by the ground tracking system. This paper introduces the basic concept and design of the ground flight termination system to be used for KSLV launch mission in NARO space center. In order to design the optimal ground flight termination system for KSLV launch application, the operational concept reflected on the flight trajectory and system characteristics of KSLV launch vehicle should be considered. Moreover the RF link budget analysis, and the analysis for system availability and reliability are done. Based on the analysis above, the each subsystem of ground flight termination to transmit the termination signal in stable is designed for KSLV launch mission.

  • PDF