• Title/Summary/Keyword: Minor rural roads

Search Result 3, Processing Time 0.018 seconds

Analysis on the Improvement Level of Minor Rural Roads - A Cast Study on the County Areas of Chonnam Province - (농어촌 도로의 정비현황 조사 분석 - 전남 군지역을 중심으로 -)

  • Choi, Soo-Myung;Lee, Haeng-Wook
    • Journal of Korean Society of Rural Planning
    • /
    • v.9 no.3 s.20
    • /
    • pp.25-34
    • /
    • 2003
  • This study was carried out to propose some useful advices for the improvement policy of the minor rural roads. For the detailed case studies on structural improvement level of the minor rural roads, 5 county areas in Chonnam Province were selected ; Damyang (peri-urban), Gurye(remoter mountainous), Jindo(remotest island), Yuongam(intermediate flat) and Bosung (intermediate semi-mountainous). In each county, the official survey data on pavement types, widths and ratios of district(Myun in Korean) and parish(Ri in Korean) roads were collected. There were no apparent differences between district and parish roads in terms of structural improvement level, while the former was ranked higher than the latter in the minor rural road improvement law, so, the present hierarchial classification system of rural roads should be readjusted. And above a third of minor rural roads in the case study areas did not meet the statutory minimum level of road width, which means the necessity of substantial upgrade of road improvement works in rural areas.

Analysis on the Improvement Level of Minor Rural Roads - A Case Study on the Country Areas of Chonnam Province - (농어촌 도로의 정비현황 조사 분석 - 전남 군지역을 중심으로 -)

  • Choi, Soo-Myung;Lee, Haeng-Wook;Choi, Dong-Jin
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.119-122
    • /
    • 2003
  • This study was carried out to propose some useful advices for the improvement policy of the minor rural roads. From the case study on 5 country areas of Chonnam Province, it was ascertained that above a third of minor rural roads did not meet the statutory minimum level of their width, which means the necessity of substantial upgrade of road improvement works in rural areas.

  • PDF

An Alternative Strategy on Minor Rural Road Improvement Project (농어촌도로 정비사업의 정책적 전개방향)

  • Choi, Soo-Myung;Choi, Dong-Jin
    • Journal of Korean Society of Rural Planning
    • /
    • v.8 no.2 s.16
    • /
    • pp.42-49
    • /
    • 2002
  • Since legislation of Rural Minor Road Improvement Act 1990, a quarter of its total length had been paved now. However, over 80% of arterial road length(national+provincial roads) had been paved, so, road improvement policy should be focussed on the local road(county+rural minor roads) from now. Generally, in the greater part of coastal plain and island areas, arterial road intensity(total road length/total catchment area) is relatively low, but local road intensity is relatively high. So, in terms of balanced development, much more efforts for rural minor road improvement should be concentrated in coastal plain and islands areas. In Chonnam Province, the maximum differentials of minor rural road improvement ratio was over 20%(the lowest; 14.1% in Goheung, the highest; 35.6% in Goksung) in 1999, but the improvement budget have been allocated in proportion to unpaved road length of each county by the provincial government. However, the differentials should not be fairly narrowed in the near future if the present budget allocation policy be maintained. To solve this problem, target differentials of rural minor road improvement between regions should be set up for each planning year and road improvement budget be allocated according to this policy change.