• 제목/요약/키워드: Military Contractors

검색결과 9건 처리시간 0.025초

개산형 방산계약에서의 원가이전에 관한 실증연구 (Study on Cost-shifting in Cost Reimbursement type of Defense Contracts)

  • 이정동;이춘주;정경인
    • 한국국방경영분석학회지
    • /
    • 제31권2호
    • /
    • pp.1-12
    • /
    • 2005
  • Defense firms' excess profitability by shifting common overhead costs from non-defense sector to defense sector in the award of cost reimbursement type of defense contracts is a widespread conclusion in prior researches. In this paper, we reviewed cost-shifting incentives in defense-contracting firms and extended the analysis of McGowan and Vendrzyk(2002) by applying modified model to Korea Defense Contracts. We formulated six hypotheses to test the relation of cost-shifting and excess profitability regarding market openness, auditing system, ranking in defense contracts, and firm types(sole defense contractors, sole non-defense contractors, and defense and non-defense mixed contractors). But, we could not find any evidence that defense firms shifted costs from non-defense sector to defense sector for the period 1997-2002. The results suggest that the excess profitability of Korea defense firms may not be from the cost-shifting but from other reasons.

국방품질경영시스템 인증 심사결과 분석을 통한 인증제도 개선 방안 (Improving Certification System by Analyzing Audit Result of the Defense Quality Management System)

  • 김영현;이종찬;최재호;변재현
    • 품질경영학회지
    • /
    • 제46권3호
    • /
    • pp.465-482
    • /
    • 2018
  • Purpose: This article aims 1) to propose improvement directions of the certification by recognizing the quality management practices based on the analysis of the audit results of the military contractors and 2) to suggest some ideas on quality audit planning preparation to help the government quality assurance representatives. Methods: Based on the nonconformity report of the defense quality management system (DQMS) requirements, frequently occurring requirement components are found and summarized. Three hypothesis testings are executed to check whether the maturity levels of the quality management systems are influenced by the company size, weapon tye, and company type, regarding the nonconformity frequency as dependent variable. Results: Nonconformity occurs most frequently in the order of product realization, measurement analysis and improvement, management responsibility, resource management, and quality management system. Nonconformity reduces when the company size increases, for the guided weapons, and in the defense companies. Conclusion: Since small-sized companies are inferior to larger companies with respect to the DQMS maturity level, more support should be provided to these small-sized companies which produce military supplies.

군사시설 건설사업의 설계변경 요인분석 및 개선방향 (Causes of Change Orders in the Military Facility Construction Projects and Suggestions for Improvement)

  • 이경한;최종수
    • 한국건축시공학회지
    • /
    • 제13권3호
    • /
    • pp.263-271
    • /
    • 2013
  • Change orders have been widespread in both the private and public construction sectors. In particular, in the case of G2B (Government to Business) contracts, adjustment of contract price and/or schedule extension is a frequent occurrence due to change orders. To uncover the causes of change orders and suggest an appropriate strategy, this study analyzed 296 cases of change orders in military facility construction projects from 2008 to 2010. The analysis revealed that the major causes of change orders are users' additional requirements (28.38%), a change of finishing materials (23.99%), and change of footing type (17.57%), in that order. Building on the results of this analysis, the authors suggest plans for practical improvements. Specific recommendations include 1) reflect user requirements at the early stage, 2) minimize the use of additional budget due to change orders, and 3) reduce the process and time for contract amendment, among others. The results of this study may provide significant implications to those involved in military construction projects, particularly project owners (i.e., the Ministry of Defense) and contractors.

대형 체계 개발사업의 체계공학 수행을 위한 요구사항 추적성 확립 (Requirements Traceability in Systems Engineering for Large-scale Systems Development)

  • 박영원;송해상
    • 한국군사과학기술학회지
    • /
    • 제3권2호
    • /
    • pp.149-155
    • /
    • 2000
  • This paper presents results from a computer-aided systems engineering application to system development projects. RDD-100 version of ALC Inc. was used in this work. The framework adopted in the study takes a unified approach to the system design and the process management associated with it, thereby coherent and full traceability between them is maintained. Conventional system engineering process supported by the tool is adopted in the system design. On the other hand, the same tool is also used to the systems engineering management to get full traceability between system design data and engineering management data. It is greatly helpful in managing many sub-contractors in the sense that the traceability can help identify the sub-project responsibility as well as the objectives of the project in coordination with interface requirements. We conclude with the advantage and limits of our unified approach.

  • PDF

설계정보 CITIS 프로토타입 구현에 관한 연구 (A Study on the Development of Design Information CITIS Prototype)

  • 박정선;김성희
    • 정보기술과데이타베이스저널
    • /
    • 제6권1호
    • /
    • pp.47-57
    • /
    • 1999
  • CITIS(Contractor Integrated Technical Information Service) is a service standard which specifies guidelines which are required for the fulfillment of a contract between a purchaser and a supplier. It was initiated as a military standard and is now becoming a commercial standard. In this paper, we propose how the guidelines, which were usually developed by Client/Server methods in previous works, can be implemented in WWW environments, and show a prototype which can be used for the confirmation of CAD drawings between contractors(purchaser and provider). We have a hope our study can provide a small foundation for the building of CITIS references.

  • PDF

가덕도 외양포의 일본군사시설에 관한 연구 -군막사 및 포대진지의 구축과정과 건축특성을 중심으로- (A Study on the Japanese Military Installations of Oiyang-po in Gadeok-do - Focused on the Architectural Characteristics and Constructional Process of an Army Barracks and Artillery Position -)

  • 이지영;서치상
    • 건축역사연구
    • /
    • 제19권3호
    • /
    • pp.51-70
    • /
    • 2010
  • This paper aims to examine the constructional background and process of the Japanese military installations of Oiyang-po(外洋浦), especially based on the military secret documents. Furthermore, it aims to analyze the characteristics of the remains. The results are as follow; 1) The number of the Japanese military secret documents concerning with the installations of Oiyang-po, summed up to 33s. Especially, 14 documents about the expropriation of the lands and houses, and the constructions of the artillery position are reserved in "Mildae-ilgi"(密大日記)written from 1893 to 1942. 2) Imperialist Japan constructed firstly the military installations of Oiyang-po against the Russo-Japanese War. After the moving of the artillery headquarters into Masan in 1911, these installations had been maintained for the defense of Busan and Jinhae Bays. 3) As soon as 1904, the lands and houses of Oiyang-po were forcibly expropriated according to (韓日議定書). The Korean Government payed the expropriation prices to the dwellers. But the amount of money were too small and were lately payed. Moreover the dwellers' fishery right were never recompensed. 4) In 1904, the artillery headquarters and position were constructed by the 3rd Chookseong-dan(築城團) under the command of Matsui, a military engineer officer. The executional constructions were accomplished by the Japanese construction contractors. 5) After the moving of the artillery headquarters into Masan in 1911, the 3rd Chookseong-dan had usually repaired and consolidated the explosive warehouses and artillery facilities. 6) The artillery position constructed with the thick concrete walls was located at the foot of the mountain in back. It's plan was similar to the rectangular shape. It reserved six 280㎜ howizers and several explosive warehouses. 7) The reserve funds and arsenal funds were used for the constructions. And the items of expenses such as the establishments of the electric lights and communication networks, and the repairs of the explosive warehouses were mainly recoded in "Mildae-ilgi".

군수업체의 품질문화 수준조사 및 향상방안 (A Study on the Quality Culture Level Survey and Improvement Plan for the Defense Industry Companies)

  • 김영현;변재현
    • 품질경영학회지
    • /
    • 제47권2호
    • /
    • pp.217-236
    • /
    • 2019
  • Purpose: This article aims 1) to identify key elements for building quality culture, 2) to design and analyze survey data from defense industry companies, and 3) to suggest directions for enhancing quality culture levels. Methods: Key elements and items for a quality culture are derived by investigating related references and using affinity diagram. Questionnaire items to investigate the quality culture level of the organizations are prepared and the survey data on the level of quality culture of military defense companies are analyzed. Results: 1) Descriptive statistical analyses are presented to compare the levels of the six key elements. 2) In each element items with low scores are identified, which should be improved. 3) Among six key elements, 'support 'element shows lowest level. 4) The quality culture level of the small-sized companies are relatively low. Conclusion: 1) To improve the quality culture level of the defense industry companies, it is necessary to provide quality education, to enhance recognition and rewards, and to invest resources for employees' self-development. 2) Small-sized companies can easily be adapted to quality-oriented cultural change if the CEO leadership focuses on quality culture.

치안보조인력 제도의 개편에 관한 연구 (A Study on Reorganization of System of Assistant Police Officer)

  • 김문귀
    • 시큐리티연구
    • /
    • 제62호
    • /
    • pp.255-276
    • /
    • 2020
  • 치안보조인력으로서 치안유지 및 사회안전 확보의 중추적인 역할을 담당하고 있는 의무경찰제도가 국방부의 전환복무요원과 대체복무요원 폐지 결정에 따라 향후 경찰의 치안공백 문제를 최소화하기 위한 절대적인 경찰인력 확보에 난항이 예상되고 있다. 이러한 상황에서 본 연구에서는 치안보조인력인 의무경찰을 대체할 인력으로서 병역자원도 정규경찰관도 민간경비 또는 기타 보안인력도 아닌 민간인 신분의 계약직으로 충원하고 이 인력을 치안보조업무에 활용하는 구체적인 방안을 제시하고자 한다. 보다 궁극적으로 이 연구는 기존의 연구에서 다룬바 있는 의무경찰 감축 혹은 폐지에 따른 대체인원 확보라는 차원을 넘어 보다 큰 틀에서 우리나라의 현행 치안보조인력제도(의무경찰제도)의 개편을 통해 바람직한 경찰인력 구조 및 운용방향을 제시하고 이를 통해 의무경찰 폐지로 인한 치안공백을 최소화하며 경찰이 양질의 대국민 치안서비스를 제공할 수 있게끔 하는 것을 목적으로 한다. 이러한 연구목적을 달성하기 위해 본 연구에서는 1) 현행 경찰인력 현황을 분석하고 치안수요 및 치안환경변화에 따른 절대적 경찰인력 확보 혹은 경찰인력 증원의 필요성 및 당위성을 도출하고, 2) 현행 치안보조인력제도의 개편 필요성 및 방향을 논의한 뒤, 3) 한국와 유사한 치안보조인력을 활용하고 있는 외국의 사례 분석을 통해 정책적 시사점을 도출하고, 4) 채용절차에서부터 활동영역에 이르기까지 한국에서의 민간계약직 치안보조인력의 구체적인 운영방안 및 법적·제도적 정비방안을 제시하였다.

국가원수 경호적 측면에서의 EMP(Electro Magnetic Pulse) 방호 시스템에 대한 고찰 (Aspect of the chief of state guard EMP (Electro Magnetic Pulse) protection system for the consideration)

  • 정주섭
    • 시큐리티연구
    • /
    • 제41호
    • /
    • pp.37-66
    • /
    • 2014
  • 최근 전자공학의 급격한 발달로 컴퓨터와 전자 통신 기술에 의존도가 높아지고 있으며 각 부분이 상호 연계되어 모든 전자 장비를 무용지물로 만드는 EMP에 의한 직접적 또는 간접적인 피해가 발생하고 있다. 대한민국과 긴박한 대치 상황에 놓여 있는 북한은 상당한 수준의 EMP 관련 기술을 가지고 있으며, EMP 무기를 이미 보유했거나 수년 내 EMP 무기의 개발을 완료할 것으로 전망하고 있다. 북한은 장거리 미사일발사 직후에 여러 차례 핵실험을 실시하였으며 노골적인 핵 협박 공세가 강화되었음을 보았을 때, 고고도 핵실험을 언제라도 할 수 있는 능력을 보유하였다고 보아야 하며, 이는 EMP 무기의 실전적인 공격능력이 갖추어 졌다는 것을 의미한다고 할 것이다. 이러한 시점에서 피해상황을 예측하여 대한민국의 안보현실에 부합되는 EMP 방호시스템의 구축은 무엇보다도 필요한 과제이다. 그 피해의 규모는 예측 불가하지만 크게 군사적 피해와 사회 경제적 피해 그리고 인명피해상황으로 구분해 보았을 때 통신 시스템 및 위성장비의 마비를 시작으로 군사안보시스템과 수송, 금융, 국가비상체계 등 여러 부문으로 피해가 나타난다. 일반적으로 EMP는 직접적인 인명피해는 없다고 보고되지만 의료기기에 의존하는 사람들에게는 치명적인 피해가 나타날 수 있다. 또한, 국가전력체계 마비로 인한 전력공급중단이 가져다주는 피해만 생각 할 것이 아니라 주 전력발전 중 원자력발전소 의존도가 높은 국내는 블랙아웃현상발생 시 심각한 원전사고로 이어질 수 있는 발전소 내부의 문제점도 예측해 보아야 한다. 우선 특별 전문 위원회를 구성하여 EMP 방호시설 및 장비에 대한 수요조사를 실시하고, 그에 맞는 소요예산을 구성하여 엄격한 기준 아래 시공업체를 선별하여야 한다. 그 후 EMP 방호성능검증을 위한 기관을 만들어 성능을 검증 한 후 유지 보수 안전 및 설계 시공회사 보안 관리를 하는 조직적이고 체계적인 과정을 거쳐 경호시설물이나 경호통신장비 기동장비 등에 대한 완벽한 EMP 방호시스템을 갖추어 놓아야 할 것이다.

  • PDF