Deep excavations for development of subway systems in metropolitan regions surrounded by adjacent buildings is an important geotechnical problem, especialy in Tabriz city, where is mostly composed of young alluvial soils and weak marly layers. This study analyzes the wall displacement and ground surface settlement due to deep excavation in the Tabriz marls using two dimensional finite element method. The excavation of the station L2-S17 was selected as a case study for the modelling. The excavation is supported by the concrete diaphragm wall and one row of steel struts. The analyses investigate the effects of wall stiffness and excavation width on the excavation-induced deformations. The geotechnical parameters were selected based on the results of field and laboratory tests. The results indicate that the wall deflection and ground surface settlement increase with increasing excavation depth and width. The change in maximum wall deflection and ground settlement with considerable increase in wall stiffness is marginal, however the lower wall stiffness produces the larger wall and ground displacements. The maximum wall deflections induced by the excavation with a width of 8.2 m are 102.3, 69.4 and 44.3 mm, respectively for flexible, medium and stiff walls. The ratio of maximum ground settlement to maximum lateral wall deflection approaches to 1 with increasing wall stiffness. It was found that the wall stiffness affects the settlement influence zone. An increase in the wall stiffness results in a decrease in the settlements, an extension in the settlement influence zones and occurrence of the maximum settlements at a larger distance from the wall. The maximum of settlement for the excavation with a width of 14.7 m occurred at 6.1, 9.1 and 24.2 m away from the wall, respectively, for flexible, medium and stiff walls.
본 연구에서는 서울메트로 2 호선 상왕십리역에서 발생한 전동열차 충돌사고에 대하여 사고재현 시뮬레이션을 수행하고 사고 발생 시 피해를 최소화할 수 있는 개선방안을 제시한다. 사고재현을 위해 상용 충돌해석 소프트웨어인 LS-DYNA를 사용하여 1 차원 및 3 차원 시뮬레이션을 수행하였다. 1 차원 시뮬레이션을 통해 각 차량 연결기의 하중, 변위, 충격흡수 에너지 및 차량의 가속도를 분석하여 사고 시 충돌안전도를 평가하였으며, 3 차원 시뮬레이션을 통해 차량의 변형 및 타고오름 현상을 분석하였다. 또한 사고 전동차의 충돌안전도 향상을 위한 개선방안들을 제시하고, 그 중 선두차량에 고용량 완충장치를 적용하는 방안에 대하여 1 차원 시뮬레이션을 통해 충돌안전도의 개선 여부를 확인하였다.
This paper is implemented a control algorithm in order to be stable and minimized to entire train traffic system at delayed case. Signal ing system is described wi th algebraic equations given for train headway, Discrete-event simulation principles are reviewed and a demonstration block signaling model using the technique is implemented. Train congestion at station entrance for short headway operation is demonstrated and the propagation of delays along a platform of trains from any imposed delay to the leading train is also shown. A rail way signaling system is by nature a distributed operation with event triggered at discrete intervals. Although the train kinematic variables of position, velocity, and acceleration are continually changing, the changes are triggered when the trains pass over section boundaries and arrive at signals and route switches. This paper deals with linear-mode1ing, stability and optimal control for the traffic on such metro line of the model is reconstructed in order to adapt the circuits. This paper propose optimal control laws wi th state feedback ensuring the stability of the modeled system for circuits. Simulation results show the benefit to be expected from an efficient traffic control. The main results are summarized as follows: 1. In this paper we develop a linear model describing the traffic for both loop lines, two state space equations have been analyzed. The first one is adapted to the situation where a complete nominal time schedule is available while second one is adapted when only the nominal time interval between trains is known, in both cases we show the unstability of the traffic when the proceeding train is delayed following properties, - They are easily implemented at law cost on existing lines. - They ensure the exponetial stability of loop system. 2. These control laws have been tested on a traffic simulation software taking into the non-linearites and the physical constraints on a metro line. By means of simulation, the efficiency of the proposed optimal control laws are shown.
This study attempted to find an alternative method for fine dust control in the pre-exiting facilities of metro-subway stations. A new double-layer design was proposed for the MVAC (mechanical ventilation and air control) system. Several filter lay-outs were combined a pre-filter with electret filter (EF), electret bundle filter (EBF), or electret pleated filter (EPF), and were then examined focusing on the collection efficiency of particulate matters and pressure drop across the filter layers. The experimental results from the lab and field tests showed the best collection efficiency with EPF, which achieved 85% for $PM_{10}$ and 55% for $PM_{2.5}$. It was also found from the long term field test that the new filter lay-out could provide quite consistent dust level particularly in underground platform regardless of external condition.
A new subway, line 9 linking Western and Eastern Seoul began its services for citizens between Gimpo airport and Gangnam area within 30 minutes by express transit service. Seoul Metro Line 9 Corporation plans to operate both local transit service which will stop at every station, and express transit service that will stop at several key stations including junctions. The passengers on line 9 will be able to transfer to lines 2, 3, 5, 8, Bundang and Incheon International Airport. The Line 9 is expected to disperse the demand for line 2, having the most number of subway users, and will provide passengers with less crowded travel. The new line will also help residents in southern Seoul outskirts and Gyeonggi provincial cities including Bundang vicinity, and Gangdong area commuters get better access to Gimpo and incheon Airports. The Corporation expects to transfer 560,000 passengers daily by the subway line 9. Seoul Development Institute conducted network reshuffle study for Seoul Metro system to sort out congestion problem due to its irrational line alignments and inconvenient transfer. Among several candidate plans of network reshuffling, the direct connection of line 9 with line 5 was chosen as a pilot study. The study found that direct connection of the 2 lines is essential for enhancing transit utility and reducing automobile commuters.
대심도 역사에서의 화재 발생시 승객의 주 대피이동로인 계단이 매우 길기 때문에 피난의 어려움이 예상된다. 이에 본 연구에서는 서울 지하철 호선별 대심도 역사 중에서 하나인 숭실대역(7호선, 47m)을 선정하여, 화재시뮬레이션을 수행하였고, 이를 통하여 열기류 및 연기의 거동을 분석하였고, 적절한 피난대책을 고찰하였다. 최근에 지하역사에서의 화재유동 시뮬레이션이 몇 몇 기관에서 수행되고 있으나, 지하의 전역사에서 화재 유동 해석은 드물게 수행되어 왔다. 특히 지하 40m가 넘는 대심도 역사에서의 유동해석은 일반 PC로는 불가능하기 때문에 이에 대한 연구가 전무하였으나, 본 연구에서는 리눅스 클러스터(Linux cluster) 장비를 이용한 병렬처리기법을 적용하여 대심도 역사에서의 화재해석을 수행하였다. 화재유동해석은 화재전용 FDS code를 이용하였으며, 난류모델은 LES 기법을 적용하였다. 화원의 규모는 10MW이고, 성장모델은 Ultrafast model를 적용하였다. 적정한 격자크기는 화원의 특성직경을 통하여 산출하였다. 본 연구에 사용된 총 격자규모는 약 10,000,000개이다. 이는 일반 PC에서는 다루기가 불가능한 격자수이므로, 병렬처리기법을 적용하여 6 cpu 리눅스 클러스터 장비로 수치해석을 수행하였다.
도시철도 지하역사에 설치되어 운영중인 승강장 안전문(PSD)은 승객의 추락방지 등 안전사고 예방에 큰 기여를 하고 있지만, 기존 승강장 선로 배기설비의 차단으로 인해, 일부 역사에서 승강장내 환기효율 저하문제를 발생시키고 있다. 본 연구에서는 PSD가 설치된 승강장의 기존 급배기 시스템의 환기효율 개선을 위해, 승강장과 대합실로 통하는 계단부 하부공간의 무효한 공간(창고)에 국부적인 하부 배기시스템을 추가하고, 승강장 배기용 덕트를 선로부의 기존 배기시스템에 연결하여 연동함으로써 기존 시스템에 무리 없이 승강장 실내환경을 개선하고자 하였다. 즉, PSD 설치이후 승강장 내부의 전체적인 기류혼합효과와 오염된 실내공기를 효율적으로 배출하기 위한 하부배기 방식을 연구하였다. 이러한 하부배기 방식의 효과를 예측하기 위하여, 서울지하철 2호선 역사를 선정하여 급배기량을 실측하고, 이를 바탕으로 전산수치해석 연구를 수행하여 개선효과를 예측해보았다. 하부 배기시스템의 적용은 승강장 기류의 지체상태 및 환기효율 특성을 나타내는 공기연령 측면에서 약 16.5%의 개선효과가 있는 것으로 분석되었다.
Seoul Metro and Seoul Metropolitan Rapid Transit Corp. have started installing screen doors at subway platforms to improve the environment of subways and prevent passengers' accidents since 2006. They are still installing screen doors at subway platforms and Metropolitan Rapid Transit Corporations in other areas are also proceeding with installment of screen doors or making preparations for it. Grounding is necessary for installing PSD systems. In case that PSD grounding is connected with existing electrical equipment grounding system, it was decided to install separate grounding for safe operation of PSD system and passenger safety. However, it's very difficult to install new grounding at the subway station compound. A way to improve this condition is that we proceed with grounding by composing grounding station by carbon grounding rod. This paper will mainly deal with how to design and construct carbon ground rod, which has been applied to PSD system grounding since 2006, including its experimental examples. In this paper, ways to secure ground resistance below 5 ohms, which is resistance necessary for PSD grounding, and to compose grounding system were also discussed. Furthermore, a ground test to check the ability to fulfill a role of PSD grounding system was conducted. As a result of applying carbon grounding module, PSD system is being operated without any problem and the installment of PSD system will be continuously expanded in the future. It's also thought that a way to integrate grounding of each functional room which has been installed at the subway station compound and to arrange equipotential grounding should be reviewed and performed promptly.
우리나라 대중교통 시스템은 서로 다른 수단간 복합적인 상호 연계로 그 교차지점에서 승객의 이동이 많이 발생하는 환승 위치가 점점 많아지고 있다. 즉, 2개 이상의 교통수단이 한 곳에서 교차하는 환승센터의 올바른 기능은 보행자의 편리성과 안락함등으로 직결되고, 그로 인한 더 많은 대중교통 이용유발이 촉진된다. 이처럼 중요한 기능을 담당하는 역할에도 불구하고 국내에는 아직 환승보행센터의 배치기준이나 그것을 평가할 수 있는 기준을 제시하지 못하고 있다. 따라서 본 연구에서는 환승센터를 이용하는 보행자의 이용실태(환승거리 및 시간, 접근거리 및 시간, 역사 내 승객 이동경로)를 조사 분석하였다. 그 분석결과를 토대로 환승센터에서의 연계시설 배치 평가기준을 승용차 이용자 보행 편리성과 대중교통 이용자의 보행 편리성으로 나누어 평가하는 방안을 제시하였다. 환승시설에서의 배치 평가기준은 보행자의 주요 이동 경로를 설정하고, 그에 따른 도보시간을 평가기준으로 설정하였다.
The development of a city is closely linked to the construction and operation of its subway system. However, constructing a new subway tunnel under an existing station is an extremely complex task, and the deformation characteristics and mechanical behavior of the new subway tunnel during the excavation process can greatly impact the normal operation of the existing station. Although the previous studies about the case of underpass engineering have been carried out, there is limited research on the condition of a newly-built subway tunnel that closely undercrossing an existing station with zero distance between them. Therefore, this study analyzes the deformation law and mechanical behavior characteristics of the preliminary lining of the underpass tunnel during the excavation process based on the real engineering case of Chengdu Metro Line 8. This study also makes an in-depth comparison of the influence of different excavation methods on this issue. Finally, the accuracy of numerical simulation is verified by comparing it with on-site result. The results indicate that the maximum bending moment mainly occurs at the floor slab of the preliminary lining, while that of the ceiling is small. The stress state at the ceiling position is less affected by the construction process of the pilot tunnel. Compared to the all-in-one excavation method, although the process of partial excavation method is more complicated, the deformation of preliminary lining caused by it is basically less than the upper limit value of the standard, while that of the all-in-one excavation method is beyond standard requirements.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.