• Title/Summary/Keyword: Metro Railway

Search Result 318, Processing Time 0.022 seconds

Evaluation of the Railroad Track Life Cycle Based on the Metro Rail Wear Data Regression Analysis (지하철 마모 데이터 회귀분석을 통한 궤도 수명 평가)

  • Jeong, Min-Chul;Kim, Jung-Hoon;Lee, Jee-Ha;Kang, Yun-Suk;Kong, Jung-Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.86-93
    • /
    • 2010
  • The wear of railway track affects loss of rough ride, noise or vibration of train and traveling safety. Moreover as the track is worn away, this promotes destruction of structural mechanism of rail track which can bring about increasing of rail track maintenance cost drastically. For this reason, it is very important and interested research subject to design railway track structure and to analyse train movement mechanism based on systematic analysis of the reasons causing rail wear possible in real field. In this research, for the efficient maintenance, Life Cycle Performance of rail track and maintenance characteristics are computed considering some track components such as track type, contracting type, sleeper type and roadbed type. Time - Wear probabilistic distribution relationship as well as multiple regression analysis based on time, curvature and wear data are computed to predict the service life remainder of railway track and to be adapted to safety assessment.

A Study on Improvement of Maintenance System for Timber Sleepers of Ballast-less track on Railway Bridge (무도상 강철도 교량상 목침목 유지관리체계 개선방안에 관한 연구)

  • Choi, Jung-Youl;Shin, Tae-Hyoung;Kim, Sang-Jin;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.1
    • /
    • pp.389-394
    • /
    • 2019
  • In case of damaged timber sleepers, maintenance is carried out according to the track inspection standard. However, it is difficult to detect the extent of damage on the bridge, and maintenance is depended on inspector's judgment. In this study, we propose to improve the evaluation criterion of timber sleepers for the ballast-less tracks on serviced urban railway bridge. The timber sleepers on railway bridge was classified according to degree of damage, and damage scores were calculated for each damage grade. Also we have improved the maintenance system of the timber sleepers through the history management system of the individual timber sleepers on railway bridge. As a results, it was judged that systematic management of timber sleepers could be possible during maintenance.

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

A Study on TPS based on ATO for Driverless LRT (ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구)

  • Lee, Chang Hyung;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.609-615
    • /
    • 2012
  • TPS (Train Performance Simulation) based on ATO (Automatic Train Operation) is required for driverless LRT (Light Rail Transit) operation plan instead of typical TPS based on driver operation. In this paper, new TPS model using ATO pattern is proposed and compared with the automatic train operation result in a test line of Seoul Metro Line 6 and in a whole line of Busan-Gimhae LRT. The actual ATO pattern can be very accurately simulated by new TPS model with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. The commercial scheduled time for driverless automatic train operation can be proposed to have "Fast" mode TPS trip time plus 3 seconds/km margin recommended by Korean standard LRT specification in this paper.

Risk Management for Casuality Accident at Urban Railway Stations (도시철도 역사 내 철도안전사상사고 위험도 관리 방안)

  • Kim, Jin Tae;Kim, Si Gon;Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.529-534
    • /
    • 2016
  • The paper suggests risk management methodology for alleviating casuality accidents at urban railway stations. Risk management deals with countermeasures for reducing accident probability or consequences to reach at the certain level of risk. First of all, Economic evaluations using cost and benefit for all the alternatives are performed. The alternatives exceeding B/C ratio greater than 1, each alternative is applied in the order of higher B/C ratio. this process is repeated when the level of risk is reduced as low as reasonably practical (ALARP). In order to determine the level of ALARP, Level of Service (LOS) for casuality risk at urban railway stations is proposed. The ALARP level is set to the LOS "C". Finally, a case study is applied to the Jongno 3-ga station, which is a highest risky station among all the stations operated by Seoul Metro and Seoul Metropolitan Rapid Transit Cooperation (SMRT).

Development of an Algorithm for Estimating Subway Platform Congestion Using Public Transportation Card Data (대중교통카드 자료를 활용한 도시철도 승강장 혼잡도 추정 알고리즘 개발)

  • Lee, Ho;Choi, Jin-Kyung
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.270-277
    • /
    • 2015
  • In some sections of the Seoul Metropolitan Subway, severe congestion can be observed during rush hours and on specific days. The subway operators have been conducting regular surveys to measure the level of congestion on trains: the results are then used to make plans for congestion reduction. However, the survey has so far focused just on train' congestion and has been unable to determine non-recurring congestion due to special events. This study develops an algorithm to estimate the platform congestion rate by time using individual public transportation card data. The algorithm is evaluated by comparison of the estimated congestion rate and the ground truth data that are actually observed at non-transfer subway stations on Seoul subway line 2. The error rates are within ${pm}2%$ and the performance of the algorithm is fairly good. However, varying walking times from gates to platforms, which are applied to both non-peak periods and peak time periods, are needed to improve the algorithm.

A Statistical Study on Doorway Flow-time for Designing Doors of Ui LRT (우이-신설 경전철 출입문 설계를 위한 승하차시간 분석 연구)

  • Oh, Suk-Mun;Jang, Hyeon-Mog;Shin, Han-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.2
    • /
    • pp.144-150
    • /
    • 2013
  • This paper presents an analysis of door design for the Ui LRT based on experiments to predict doorway flow-time and their analyses results. A similar railway vehicle (from Gimhae LRT) and operational conditions are utilized to assess the doorway flow-time through repetitive experiments. Design of the experiments consists of four scenarios, and the experiments are repeated 39 times in total. We use the results of the experiments to verify the design of doors of Ui LRT (e.g. the required number of doors and their width). Various statistical analyses are carried out for the flow-time with respect to the number of boarding/alighting passengers. We make three category levels of boarding/alighting passengers, and analyze the mean and variance for each category, and then carry out One-Way ANOVA to analyze how the number of boarding/alighting and onboard passengers impact flow-time. The results of this paper can be used for making decisions about doors of the LRT vehicle.

Evaluation of Track Irregularity Effect due to Adjacent Excavation on Serviced Railway Line (철도시설물 인접굴착공사에 따른 운행선 궤도의 궤도틀림 영향 평가)

  • Choi, Jung-Youl;Park, Dong-Ryong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.401-406
    • /
    • 2019
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, sleepers, and track elastic springs(ballast, rail pad). As a result of analyzing the track deformation level of the existing tracks due to the excavation work adjacent to the railway facilities, it was found that the track irregularity evaluation criteria (allowed values) of both conventional and high-speed railways lines were satisfied. Based on the numerical analysis using the track model, it was analyzed that the results of the prediction of the track irregularity due to the excavation work and the level of the track deformation occurring at the actual site could be approximated as closely as possible.

A Study to the Plan for Development of Maintenance applied RCM (RCM을 적용한 유지보수 시스템 구축에 관한 연구)

  • Oh, Ahn-Sup;Lee, Hun-Il;Shin, Kook-Ho;Shin, Kun-Young;Jang, Seong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.907-914
    • /
    • 2011
  • It has used for Rolling Stock Maintenance a number of maintenance system applied RCM in Railway(Korea Railroad Corporation, Seoul Metro, Korail Airport Railroad Corporation, etc) so far. Some institutions has been using develop Computational System including reliability process. A majority of the system has computerized maintenance work, but it is shown that developed focus on administrator and developer not user. SMRT(Seoul Metropolitan Rapid Transit Corporation) has developed computational system for maintenance in the '90s and saved many data about Maintenance Historical Data. However, this system reached the limits application of this data. Maintenance of computer systems is managed directly by the field staff and to introduce Reliability-centered maintenance SMRT was continually reviewed system development trends and supplement the existing system. To successfully operate RCM program should be gained full support in the whole company and field communicate, secure a reliable data from field and the most important take a patience. Our corporation will operate and develop successful RCM thorough review of these problems in the future.

  • PDF

A Study on System Engineering of Light Rail Transit Private Investment Projects (경량전철 민간투자사업의 시스템엔지니어링 연구)

  • Cha, Gi-Ho;Park, Jin-Jae;Lee, Jae-Hyeong;Chu, Dong-Su
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.517-544
    • /
    • 2011
  • Promote competition in local government and the construction of a subway construction in the vicious cycle of debt due to the operating deficit as a greater burden on local finances was leave. This government policy of public transport in the center of the metro construction costs affordable and to respond appropriately to public transport demand new transit LRT(Light rail Transit) by introducing the current Busan was the opening of Line 4, yongin line, Busan - Gimhae line, parliamentary and barge construction or ready for the opening. What is light rail, compared to the existing subway and cheaper construction cost, the existing road or bridge that runs along the track is installed, etc. Manless system construction cost and operating expenses as a possible new railway transportation has been a leading state-of-the-art mad. However, the domestic business system engineering of light rail-related companies in the developed countries are doing to advance to the national to the local engineering skills of the self-free, hurry will have to be secured. Therefore, this paper applies local light rail project on the status of the systems engineering analysis and based on this source of the latest engineering technology-intensive systems engineering to provide direction to the development of technology.

  • PDF