The DC electric power system is the most important power source in a metro railway system. As metro railway system is expanded recently, the importance of DC electric power system is emphasized. Furthermore, the study for systemization and standardization of design and operation technique in DC electric power system is undergoing nowadays. For these studies, the development of standard analysis model for metro railway electric power system is required. In this paper, a standard analysis model for metro railway electric power system which is using PSCAD/EMTDC program is developed. The developed model is explained and the validity is shown by using the case studies.
A direct current electric power system is one of the most important power source in a metro railway system. As railway system is growing up today, the importance of DC electric power system is emphasized. The study for systemization and standardization of design and operation technique in DC electric power system is undergoing nowadays. For these studies, the development of standard analysis model for metro railway electric power system is required. In this paper, a standard analysis model for metro railway electric power system which is using PSCAD/EMTDC program is proposed. The proposed model is explained and the validity is shown by using the case studies.
With 34 years of accumulated operating experience, Seoul Metro has launched a project aimed at exporting second-hand trains(used EMU cars) to Vietnam while seeking measures for diversifying its business such as the construction of the metropolitan railways both at home and abroad, and operating business as a way of fiscal consolidation and management improvement. Therefore, Seoul Metro has moved ahead with this plan considering that there's no legal constraints on durable period of rolling stocks in advanced countries where the vehicles have been used for 35 years or longer than 40 years through renovation such as safety inspection and comprehensive maintenance program, and the railway systems for the replacement are expected to reach 838 cars by 2015 with growth of 100 cars a year. Seoul Metro strives to create value for boosting revenues and recycling resources by sending used EMUs to Vietnam. Seoul Metro will also provide under-developed countries with cars at a low price as well as share the accumulated railway technical know-how so that it can promote the national image and obtain the pre-emptive effect of metro railways in Vietnam.
Over the years, the Social Republic of Vietnam has demonstrated its high annual growth rate over 8%. In order to secure its sustainable economic growth, its has also demonstrated its sharp concerns on building up core infrastructures by luring foreign investments on a large scale, which would underpin the nation's economic propulsion. Among others, transport infrastructures and networks centering on railway systems are obviously seen as the most urgent to be built to continue its growth. Seoul Metro recently took a significant step forward in Vietnam to launch railway business by executing its export project of 6 units of metro cars to Hanoi as on July 10, 2008. Those 6 cars are scheduled to be put on the tracks linking Yen Bian, Hanoi with Ha Long, for demonstrative running, around October, 2008, carrying tourists on that 163kms of the National Railway line serving the region. A successful running on the track will duly entail further export of additional 54 units of Seoul Metro cars to Vietnam. In this thesis, description will be noted on the reuse and economic value of the Seoul Metro's de-commissioned metro cars, reflecting on the current urban railway law at home regulating the service life of rolling stocks domestically. This thesis will also study the points at issue, and the recommendable future orientation of the Vietnam railway business project.
This study aimed to reduce of traps incident of metro train door by suggesting preventive actions throughout analyzing why railway drivers and passengers commit unsafe behaviors which are human factors making occurrence of the incidents. The incident cases were analyzed and Incident Tree was structured by brainstorming with safety experts. In addition, the questionnaire survey was conducted for comparison with the analysis results. As the result, this study suggested driver's factors, passenger's factors, and public relation plan for safe use of metro in order to reduce the frequency of the incidents. For driver's factors, implementing job-rotation systems between railway and non-railway drivers, installing Object Detection Sensors between the metro doors and PSD, and flexible operation of dwell time were suggested. For passenger's factors, placing a platform safety person, installing a safety fence in front of the stairs and the elevators, and country wide public relations through mass media were suggested.
Risk-based railway safety management has been mandatory in Korea as by relevant laws and regulations enacted since the Railway Safety Act 2004. In particular, the Railway Vehicle Safety Guidance came into effect on Jan 1, 2008 specifies the details of methodology for hazard analysis, risk assessment and safety verification and validation. Fundamentals for success of the risk-based safety management are systematic hazard identification and risk assessment by use of reasonable risk assessment criteria, but the principle of risk-based safety management has not been applied in an effective way to introduction and maintenance of railway vehicle systems because definite risk assessment criteria have not been set down for each railway system or railway network. The purpose of this study is to suggest a risk matrix development principle for risk assessment of domestic urban metro vehicles by analyses of relevant rules and railway operating environment of Korea.
There have been recently introduced new types of urban metro vehicles called LRT (Light Rail Transit) running on elevated guideway such as Uijeongbu VAL(which stands for V$\acute{e}$hicule Automatique L$\acute{e}$ger: Automatic Light Rail Vehicle) system, Yong-In LIM(Linear Induction Motor) system, Incheon international airport MAGLEV(Magnetic Levitated Vehicle) system and Daegu monorail system. Most of accidents by the vehicles are bound to happen on elevated guideway. Therefore, it is of vital importance to analyze hazards related to vehicles running on elevated guideway and study emergency evacuation scenarios applicable in case of accidents on elevated guideway so as to secure the safety of the new types of urban metro vehicles. In this study, FTA(Fault Tree Analysis) model was developed to identify all possible hazards, and all possible evacuation scenarios were studied. It was also confirmed that each hazard can be corresponded to one or more evacuation scenarios. This result shows that passengers can be evacuated according to one of the scenarios identified in this study in case of an accident of "Train Stranded on Elevated Guideway".
This study analyzed passenger's access modes that connect to regional railway station and developed a model of access mode choice based on transit smart card data of Seoul station as a case study. The study boundary includes sixteen bus stops around the station. The results show that most passengers access to station have less than two transfers. Of total 15000, eighty percent of passengers use metro and the rest of people take a bus. Interestingly, it is found that almost same proportions of passengers use metro and bus for egress the station. Consequently, metro is found to be most likely used mode compared to bus for both access and egress trips.
Paris has one of the world's oldest metropolitan railway systems and was also a pioneer when it introduced the RER in the 70s. With planning objectives comparable to the GTX, the RER aimed at serving outer suburbs while fully crossing the city center at higher speeds than the Metro. Maybe more relevant is the comparison between the planned Grand Paris Express and GTX projects, in terms of their planning ambitions and their development framework. This article will introduce the main planning ideas behind the Metro and the RER in Paris, and try to draw relevant comparisons with the GTX plan. It will also present the plans and financing framework for the Grand Paris Express and compare it with the BTO scheme contemplated for GTX, and draw some recommendations for successful implementation.
이 논문에서는 도시철도의 최대수요전력 산출을 위한 근사모델을 제시한다. 전류 벡터 반복법을 활용하여 변전소의 최대수요전력을 계산할 경우에 기존의 방법으로는 수 많은 반복 조류계산이 필요하기 때문에 계산시간 제약으로 인해 실시간 적용이 어렵다는 문제가 있다. 본 논문에서는 모든 조건이 동일한 상태에서 전원 임피던스의 변화에 따른 변전소 최대수요 전력을 빠르게 산출하는 근사모델을 제시한다. 제시된 근사 모델에 의한 산출결과가 기존 모델과 거의 유사한 정확성을 보임을 시뮬레이션을 통해 예시한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.