초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교 (Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction)

  • 이태희;고용호;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권4호
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발 (Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment)

  • 김민주;김태훈;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

  • PDF

컨테이너항만 운영 효율 향상을 위한 장비 배차 최적화 (Optimizing the Vehicle Dispatching for Enhancing Operation Efficiency of Container Terminal)

  • 홍동희;김귀정
    • 한국융합학회논문지
    • /
    • 제8권10호
    • /
    • pp.19-28
    • /
    • 2017
  • 최근 컨테이너 항만에서는 점점 컨테이너선의 대형화에 따라 증가하는 물동량을 처리하기 위해, 하역장비들의 효율적인 배차 계획과 대기시간 최소화를 통해 작업 생산성을 높이는 다양한 방법들을 적용하고 있다. 본 연구에서는 생산성을 높이는 방법으로 기존 휴리스틱 방법론을 개선한 최적화 모형인 솔버(Solvers)를 적용하였다. 실험 계획은 6개의 샘플 문제를 통해 두 가지 목적함수인 공차주행시간 최소화와 지연시간 최소화의 수행 결과를 기존의 휴리스틱 방법론의 결과와 비교하는 것이다. 실험 결과 두 가지 목적함수 모두 6개의 샘플 문제 중에서 4개의 샘플 문제에서 최적화 모형이 휴리스틱 방법론보다 평균 5.3% 향상된 결과를 도출하였다.

웹사이클론을 이용한 조닝모듈 개발에 관한 연구 (A Study on Zoning Model Using Web-Cyclone)

  • 곽한성;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.115-117
    • /
    • 2012
  • Task based modeling is essential in a construction operation simulation modeling. It allows dealing with local variables or delay factors that affect productivity and improves the reusability of existing operation models. An operation model can secure reality only if it reflects the real construction processes by effectively dealing with zoning issue. However, system users have some difficulties in modeling a construction operation that is consisted of several processes having different production units. Zoning is a major modeling issue when the task based modeling method is implemented using the existing discrete event simulation systems. This paper highlights the difficulty and presents a new method that complements the zoning issues attributed to different production units. The method is described in detail by presenting the flow of entities. It is confirmed that the zoning method effectively deals with the unbalance of production units between processes and facilitates to model an operation model having processes with different production units. The "Zoning module" contributes to increasing accuracy of simulation result.

  • PDF

선삭 공정에서의 고능률 가공을 위한 주축 회전수의 최적화 (Spindle Speed Optimization for High-Efficiency Machining in Turning Process)

  • 조재완;강유구;김석일
    • 한국정밀공학회지
    • /
    • 제26권1호
    • /
    • pp.138-145
    • /
    • 2009
  • High-efficiency and high-quality machining has become a fact of life for numerous machine shops in recent years. And high-efficiency machining is the most significant tool to enhance productivity. In this study, to achieve high-efficiency machining in turning process, a spindle speed optimization method was proposed based on a cutting power model. The cutting force and power were estimated from the cutting parameters such as specific cutting force, feed, depth of cut, and spindle speed. The time delay due to the acceleration or deceleration of spindle was considered to predict a more accurate machining time. Especially, the good agreement between the predicted and measured cutting forces showed the reliability of the proposed optimization method, and the effectiveness of the proposed optimization method was demonstrated through the simulation results associated with the productivity enhancement in turning process

비용-일정 통합관리를 통한 건축공사 실적관리 (Performance Management through Time-Cost Integration in Construction Project)

  • 김동진;임형철;최정석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.379-382
    • /
    • 2001
  • 국내 건설프로젝트는 공정관리와 원가관리의 이원적 관리체계를 가지고 있으며, 공정관리는 아직 그 체계가 미흡하고 상대적으로 관리의 중요도가 낮게 평가되고 있는 현실이다. 현재의 원가위주의 관리체계로는 프로젝트 진행과정상의 수행성과를 정확히 파악하기 어려우며, 이에 따라 공기지연, 공사비초과, 생산성저하 둥의 문제가 야기되고 있다. 따라서 프로젝트를 계획된 기간과 비용안에 효율적으로 완성하기 위해서는 비용과 일정의 통합관리를 통한 정확한 실적관리기법의 도입이 요구된다. 이에 본 연구에서는 실공정을 중심으로 한 실적관리를 통해 프로젝트의 성과를 정확히 파악하여 성공적 프로젝트 수행을 위한 방안으로 비용과 일정의 통합관리를 통한 실적관리 모델을 제시하였다.

  • PDF

AI 컴포넌트 추상화 모델 기반 자율형 IoT 통합개발환경 구현 (Implementation of Autonomous IoT Integrated Development Environment based on AI Component Abstract Model)

  • 김서연;윤영선;은성배;차신;정진만
    • 한국인터넷방송통신학회논문지
    • /
    • 제21권5호
    • /
    • pp.71-77
    • /
    • 2021
  • 최근 이질적인 하드웨어 특성을 고려한 IoT 응용 지원 프레임워크의 효율적인 프로그램 개발이 요구되고 있다. 또한, 인간의 뇌를 모사하여 스스로 학습 및 자율적 컴퓨팅이 가능한 뉴로모픽 아키텍처의 발전으로 하드웨어 지원의 범위가 넓어지고 있다. 하지만 기존 대부분의 IoT 통합개발환경에서는 AI(Artificial Intelligence) 기능을 지원하거나 뉴로모픽 아키텍처와 같은 다양한 하드웨어와 결합된 서비스 지원이 어렵다. 본 논문에서는 2세대 인공 신경망 및 3세대 스파이킹 신경망 모델을 모두 지원하는 AI 컴포넌트 추상화 모델을 설계하고 제안 모델 기반의 자율형 IoT 통합개발환경을 구현하였다. IoT 개발자는 AI 및 스파이킹 신경망에 대한 지식이 없어도 제안 기법을 통해 자동으로 AI 컴포넌트를 생성할 수 있으며 런타임에 따라 코드 변환이 유연하여 개발 생산성이 높다. 제안 기법의 실험을 진행하여 가상 컴포넌트 계층으로 인한 변환 지연시간이 발생할 수 있으나 차이가 크지 않음을 확인하였다.