• 제목/요약/키워드: Mega-projects

검색결과 64건 처리시간 0.026초

새만금사업의 지속가능한 발전방안 연구: 전라북도 지자체를 중심으로 (A Study of Saemangeum Project's Sustainable Development: Focused on local governments of Jeollabukdo)

  • 김강훈
    • 한국시스템다이내믹스연구
    • /
    • 제11권4호
    • /
    • pp.25-59
    • /
    • 2010
  • The Korean government has operated various mega-development projects in order to help nation progress into the future. However, many problems and concerns have been raised on the mega-projects' delay and failure in South Korea. Moreover, there are many technical and executive problems; such as trial and error of development work, failure of validity test, complicated decision-making processes, and so on. With these concerns and problems to mega-development projects, finding a sustainable development from mega-projects is becoming a new issue in the field of mega-development projects. Therefore, the main purpose of this study is to investigate whether or not most mega-development projects conducted by the government exactly corresponds with sustainable development (such as environmental soundness, economic efficiency and social equity) focusing on Saemangeum project. Using causal loop analysis, this study gives some significant results to us. First, for environmental soundness, both central and local government should ensure water-purity control system for farming, industry, leisure, and others. Second, for economic efficiency, both governments not only have to secure a budget for completion of infrastructure of the Saemangeum project but also support financial assistance to Saemangeum project. Third, for social equity, three local governments (i.e., Gunsan, Gimje, and Buan) should stop debate and conflict with regard to an administrative district of Saemangeum region. Finally, most politicians should not use Saemangeum project for political means. Rather, they should recognize the project as a motive power for economic development of Jeollabukdo.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제12권1호
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

대형 혁신과제 추진방법에 대한 연구 (A Study on Mega-Y Project Innovation Activities)

  • 성수경;김준석;변재현
    • 품질경영학회지
    • /
    • 제38권4호
    • /
    • pp.531-539
    • /
    • 2010
  • Mega-Y project is very important for a company to gain a competitive advantage in markets or to achieve drastic change in the internal processes. It stems from the company strategy and annual management goals or key performance measures, and is proceeded by the cross-functional team. This paper presents the success factors and implementation process of the Mega-Y projects. The implementation process is presented in 5 steps, including project selection, cross-functional team building, establishment of the master plan, development and execution of sub-projects, and project completion. A case study on the cost reduction project of aircraft development is presented to help for the practitioners to deploy the implementation process introduced in this paper.

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

대형 건설사업에서의 사업관리정보시스템 구축에 관한 연구 (A Study on the Development of Project Management Information System for Mega Project)

  • 윤은상;이화기
    • 산업경영시스템학회지
    • /
    • 제22권50호
    • /
    • pp.243-255
    • /
    • 1999
  • A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.

  • PDF

EVALUATING CRITICAL SUCCESS FACTORS FOR ACCURATE FIRST COST ESTIMATES OF LARGE-SCALE CONSTRUCTION PROJECTS

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.354-360
    • /
    • 2009
  • The demands for large-scale construction projects such as Mega-projects are largely increasing due to the rapid growth of increasing populations as well as the need to replace existing buildings and infrastructure. Increasing costs of materials, supplies, and labors require the first cost estimates at the preliminary planning stage to be as accurate as possible. This paper presents the results obtained from the survey on evaluating nine critical success factors that influence the accurate first cost estimates for large-scale projects from practical experiences. It then examines the current cost structures of construction companies for large-scale projects, followed by the causes for cost and schedule overrun. Twenty completed surveys were collected and the Analytic Hierarchy Process was applied to analyze the data. The results indicate that technology issues, the contract type, and social and environmental impacts are the significant leading factors for accurate first cost estimates of large-scale construction projects.

  • PDF

지능형 종합사업관리 시스템 플랫폼 디자인 방안에 관한 연구 (A Platform Design Study of Intelligent Program Management Information System (iPMIS))

  • 염지웅;김주형;안병주;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.716-719
    • /
    • 2008
  • 용산 국제 업무지구, 인천 송도국제도시, 일본의 록본기힐즈, 미드타운 등 최근의 국내 외의 건설프로젝트의 유형은 주거, 상업, 업무, 공공, 문화, 여가 등이 복합되어 수평 및 수직적인 공간에 입체적으로 배치되는 입체 복합 공간 개발이 주류를 이루고 있다. 입체 복합 공간 개발에서의 메가프로젝트는 다양한 참여주체 간의 복잡한 이해관계, 민간 및 공공 개발 영역의 혼재, 운영유지 및 자산 관리의 중요성 등 복합적이고 상호 조율된 가치를 추구한다. 따라서 이런 메가프로젝트를 성공적으로 수행하기 위해서는 기존의 단위 또는 다중프로젝트관리 시스템과는 다른 종합사업관리 시스템이 필요하다. 이에 본 연구는 메가프로젝트 수행을 위한 지능형 종합사업관리 시스템의 플랫폼 디자인 방안을 제시하여 실제 프로그램 개발에 도움을 주고자 한다.

  • PDF

대규모 건설프로젝트의 진도율 측정 프레임워크 개발에 관한 연구 (Development of Progress Measurement Framework for Mega Construction Project)

  • 고성진;지석호;김진우;송준호
    • 대한토목학회논문집
    • /
    • 제37권2호
    • /
    • pp.419-425
    • /
    • 2017
  • 다양한 시설의 건설, 다수 이해관계자의 참여, 긴 사업기간 등의 복잡성으로 인해 대규모 건설프로젝트는 이를 관리함에 있어 어려움이 있다. 효과적인 대규모 프로젝트관리를 위해서는 합리적인 진도율 측정이 중요하고, 이를 위한 다양한 방법들이 제안되었다. 하지만 기존의 방법들은 단일 또는 일부 시설의 건설 프로젝트로 한정하였기 때문에 다양한 시설들을 건설하는 대규모 프로젝트에 적용하는 데 한계가 있다. 따라서 본 연구는 대규모 건설프로젝트의 특성을 반영한 진도율 측정 프레임워크를 제안함을 목표로 한다. 프레임워크는 작업분류체계 개발, 주요시설별과 하위시설별 가중치 산정, 통합 진도율 산정으로 총 4가지 단계로 이루어져 있다. 본 프레임워크를 검증하기 위해서 세종시를 대상으로 사례연구를 수행하였고, 활용 가능성을 검증할 수 있었다. 본 연구를 바탕으로 대규모 건설프로젝트의 진도율을 보다 합리적으로 측정할 수 있고 효과적인 프로젝트관리가 이루어질 것으로 기대된다.

A STUDY ON DEVELOPING DECISION SUPPORT MODULES OF iPMIS(INTELLIGENT PROGRAM MANAGEMEN INFORMATION SYSTEM) FROM ONTOLOGICAL PERSPECTIVE

  • Jae-Bok Lim;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.717-724
    • /
    • 2009
  • Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.

  • PDF