• 제목/요약/키워드: Measuring performance

검색결과 3,141건 처리시간 0.03초

선박의 항해중 종합내항성능지표에 관한 연구 (A Study of the Integrated Seakeeping Performance Index in Seaways)

  • 김순갑;공길영
    • 한국항해학회지
    • /
    • 제21권2호
    • /
    • pp.1-9
    • /
    • 1997
  • This paper presented a method of evaluating navigational safety of a ship by means fo the integrted seakeeping performance index(ISPI). The ISPI is defined by measuring only any one factor through the medium of relative dangerousness of the other factors for evaluating seakeeping performance. This evaluation method can be applied to the ships for any types and loading conditions. In devloping the practical evaluation system of navigational safety, it is expected to be useful to solve the difficulties in measuring factors by sensors. The results are also useful for devloping the optimum type of ship by applying at the initial design phase.

  • PDF

A Research Model for Measuring ERP Performance

  • Kang, Yang-Suk;Hong, Soon-Goo;Choi, Hyung-Rim;Kim, Jong-Weon
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 2007년도 춘계학술대회
    • /
    • pp.160-162
    • /
    • 2007
  • The overall objective of this paper is to suggest the research model for measuring the ERP performance in Korean manufacturing firms. To this end, the previous research papers on the ERP measurement were reviewed and the 356 questionnaires are collected. In particular, the effects of mediation variables including a firm size, user satisfaction, and usage will be tested.

  • PDF

On the Robustness of Watermarking in the Frequency Domain for Still Images

  • Miyazaki, Akio;Ejima, Masataka
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2000년도 ITC-CSCC -2
    • /
    • pp.861-864
    • /
    • 2000
  • This paper aims to establish fundamentals of measuring and evaluating the performance of water-marking systems. We first present the general model of a watermarking method for still images. Based on this model, we propose a statistical method of measuring the performance and robustness of the watermarking system. Then, the DCT-based watermarking system is analyzed and its performance is evaluated by using the proposed method.

  • PDF

Integrating Balanced Scorecard and Analytic Hierarchy Process Techniques for Evaluating Corporate Performance

  • Sohn, Myung-Ho;Park, Sungbum;Lee, Heeseok
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.111-115
    • /
    • 2001
  • A good business performance measurement system is an effective tool io sustained growth in profits. Although interest in creating performance measurement models is widespread, a well-designed system is rare. To be successful in today's competitive environment, a performance measurement system should incorporate strategic success factors and contain financial and non-financial measuring index to carry out strategic management. In the 1990s, Kaplan & Norton introduced a concept called the Balanced Scorecard. The Balanced Scorecard supplements traditional financial measures with criteria that measured performance from three additional perspectives - those perspectives of customers, internal business processes, and learning and growth. This paper presents five measuring index criteria for each perspective. To calculate the relative priority for These measuring index, we investigate weights investigated by interviews with management consultant. Then, AHP method is employed for calculating priority weight. Our evaluation model may be referred to as the Balanced Analytic Hierarchical Performance Model(BAHPM) in the sense that the analytic hierarchical scheme, along with the AHP, is applied. The BAHPM is the first kind of analytical model to cover a wide variety of measures. In comparison with previous evaluation models, our model shows strengths in structural flexibility, ease of incorporating feedback, group evaluation capacity, participation promotion, sensitivity analysis, and computational simplicity. A prototype based on the BAHPM can be applied to various industry sectors.

  • PDF

고성능 필터를 이용한 접지저항 측정시스템의 설계 (Design of the Ground Resistance Measuring System using high Performance Filter System)

  • 이기홍;정재기;주형준
    • 조명전기설비학회논문지
    • /
    • 제15권6호
    • /
    • pp.43-48
    • /
    • 2001
  • 본 논문에서는 지중의 노이즈들로부터 영향을 받지않는 접지저항 측정시스템을 설계하였다. 일반적으로 기존 의 접지저항 측정기는 지중에 노이즈가 잠재되어 있을 경우, 접지저항 측정신호가 영향을 받아 정확한 접지저항을 측정하기 어렵다. 따라서 본 논문에서는 L-C공진필터와 마이크로프로세서를 이용하여 지중의 잡음환경에서도 정확히 접지저항을 측정할 수 있는 접지저항 측정기를 설계하였다. 또한 현장시험을 통해 설계된 접지저항측정기가 지중의 노이즈로부터 영향을 받지않음을 입증하였다.

  • PDF

뇌보호 설비를 위한 접지임피던스 측정기 개발 (Development of Ground Impedance Measuring Instrument for Lightning Protection System)

  • 이태형;조성철;엄주홍
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전기물성,응용부문
    • /
    • pp.194-195
    • /
    • 2006
  • This study evaluated the impedance characteristics of earth termination system and developed a variable frequency-typed inverter (measuring tool) for the utilization in ground design for lightning protection. The variable-frequency-typed inverter were composed of rectification part, voltage adjuster, IGBT controller and measuring part. Meanwhile, the square wave signal of variable frequency converted its frequency up to lightning surge band by using an IGBT after rectifying an alternating current (AC). It conducted performance evaluation of ground impedance of actual earth termination system by using the developed measuring tool for ground impedance and confirmed that such impedance-oriented performance evaluation was effective in the design of lightning protection.

  • PDF

Design of the Ground Resistance Measuring System to the Earth-Noise

  • Jung Min-Jae;Joo Hyung-Jun;Lee Ki-Hong;Oh Sung-Up;Jung Jae-Ki;Seong Se-Jin
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.566-570
    • /
    • 2001
  • Generally, grounding systems are responsible for the safe operation of a power system. Their performance guarantees equipment protection and personnel safety under condition of the limited ground potential rise and touch voltages as well as step voltages under ground fault conditions. Therefore, it is necessary to measure the ground resistance frequently for checking the performance of grounding system, In this paper the ground resistance measuring system using digital signal processor and high-performance L-C resonant band pass filter is presented. The signal current magnitude for measuring ground resistance in this system is $10^{-1}[A]\;to\;5\times10^{-2}[A]$ and the current frequency is 30[Hz].

  • PDF

Lightscape를 이용한 광선반 창호시스템의 채광성능평가 (Daylighting Performance Evaluation of Lightshelf Window System by Lightscape)

  • 문기훈;김정태
    • KIEAE Journal
    • /
    • 제4권4호
    • /
    • pp.45-52
    • /
    • 2004
  • Simulation of daylighting by computer program is a method to avoid unnecessary efforts in manufacture of its testing models, to reduce its measuring tolerances and be able to provide variations of various weather conditions as well. Many simulation programs on daylighting have been released freely or commercialized for selling, however, a demonstration of their availability and validity as a tool for evaluating daylighting performance is required since each one has its own characteristics. The objectives of this study lie in suggesting an application method of evaluation tools and demonstration of limits and characteristics so as to more easily determine the daylightingperformance in the very initial stages of planning for an arbitrary office space in which windows with daylight access are built. We produced scale model of the general light inducing type side lighting with lightshelfand ceiling, and the luminance (at 78 measuring points) and illuminance (at 84 measuring points) were measured in a clear sky. And a comparison of the measured values and the calculated values from a computer simulation using the Lightscape program was performed.

터널계측용 록볼트축력계와 지중변위계의 불량원인 파악과 검증방법에 대한 연구 (A study on the methods of identifying and verifying the causes of defects on rock bolt stressmeter and rod extensometer)

  • 김영배;노원석;이성원;전훈민;이강일
    • 한국터널지하공간학회 논문집
    • /
    • 제24권5호
    • /
    • pp.411-429
    • /
    • 2022
  • NATM 터널에서 계측은 필수 불가결한 요소이나 계측기의 신뢰도를 검증할 방법, 절차, 규정 등에 대한 연구가 부족함으로 인해 터널에서 계측기가 성능검증 절차 없이 설치 및 적용되고 있다. 본 연구에서는 국내외 계측 검·교정 관련 규정을 조사하고 공인 인정기준의 필요성을 제시하였다. 또한 터널계측기 중 록볼트 축력계와 지중변위계를 대상으로 계측기의 불량원인을 외관검사로 파악하였으며 성능검사를 위해 단계별 하중 재하가 가능한 검증 장치를 개발하여 국내 9개 계측제조업체의 정밀계측기 불량원인을 파악하였다. 개별센서 위주의 성능테스트도 중요하나 완제품 상태에서 검증 절차를 통과해야 함이 필수적이므로 이에 따른 성능검사 방법과 절차를 제시하였다. 본 연구를 통하여 향후 계측기 성능검증을 위한 관련 규정 마련과 현장에서 계측기를 선정하는 데 도움이 될 것으로 판단된다.

KTX 견인, 재동성능용 계측시스템 구축 (Development of Measurement System for Traction and Braking Performances in KTX)

  • 김석원;한영재;김영국;박찬경;최강윤;김종영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(I)
    • /
    • pp.216-223
    • /
    • 2003
  • In this paper, we introduce the software and hardware of the measuring system for performances of traction and braking in KTX(Korea Train eXpress). The measuring system focuses on the verification of the performance and acquisition of test data. The software controls the hardware of the measuring system, performs the analysis and calculation of measurement data and acts as interface between users and the hardware. For this purpose, three programs, such as a measuring program, a back-up program and a post-processing program, have developed.

  • PDF