• 제목/요약/키워드: Maximum section discharge rate

검색결과 6건 처리시간 0.023초

방전에너지에 따라 동전극과 흑연전극이 방전가공면에 미치는 영향 (Influence on EDM Surface with the Copper and Graphite Electrode According to the Discharge Energy)

  • 최재용;전언찬;정재현
    • 한국정밀공학회지
    • /
    • 제14권5호
    • /
    • pp.53-59
    • /
    • 1997
  • This study has been performed to inmvestigate MRR(metal removal rate), REW(relative electrode wear), surface roughness, heat transumutation layer and microhardness distribution in cross-section of the machined surface with various pulse-on duration and peak pulse current, using the copper and graphite electrode on the heat treated STD11 which is extensively used for metallic molding steel with the EDM. The results obtained are as follows; a) There exists critical pulse-on duration(If Ip equals 5A, .tau. on is 50 .mu. s) which shows the the maximum MRR in accordance with peak oulse current and the MRR decreases when the pulse-on duration exceeds the critical pulse-on during because of the abnormal electric discharge. b) Safe discharge is needed to make maximum of MRR and the metalic organization must be complicated for discharge induction. c) Graphite has much more benefits than copper electrode when rapid machining is done without electrode wear. d) The most external surface has the highest microhardness because of car- burizing from heat analysis of the dielectric fluid and the lower layar of the white covered layer has lower microhar dness than base matal because of softening.

  • PDF

낙동강수계 수질오염총량관리를 위한 유량조사 평가 (Evaluation on Actual Discharge Data for TMDL in Nakdong River Basin)

  • 김경훈;김용석;박배경;윤종수;신찬기
    • 환경위생공학
    • /
    • 제23권4호
    • /
    • pp.65-71
    • /
    • 2008
  • To drive efficiently total water pollution load management, needs to calculate the exact load emissions, pollution load allocation and implementation evaluation in each unit area of watershed and accurate and regular flow of data. For these reasons, the Nakdong River TMDL Research Center has produced directly or indirectly in the average interval of eight days (30 times or more / year) 41 points for unit area of the total water pollution load management and 8-point of municipal requirement for a total of 49 branches as a flow data in 2004 from August. This acquired the survey flow is evidence of trends and changes each point in the Nakdong River based on time, such as 10 years based on average design flow available to the foundation of the summit as the major water policy is to be utilized. This study was performed on actual discharge measuring data and introduced performance results each drainage basin of Nakdong River from 2004 to 2008 over the total of past five years.

공기연행 수치모형을 이용한 발전소 거품저감 수중방류구조 설계 (Design of the Submerged Outlet Structure for Reducing Foam at a Power Plant using a Numerical Model Simulating Air Entrainment)

  • 김지영;강금석;오영민;오상호
    • 한국해안·해양공학회논문집
    • /
    • 제20권5호
    • /
    • pp.452-460
    • /
    • 2008
  • 발전소의 냉각수 방류과정에서 대량으로 발생하는 거품의 제거를 위하여 지금까지 소포제와 확산방지 막에 의존해왔지만 유지보수나 비용 등의 문제로 안정적인 구조물에 의한 거품발생 방지 방안 마련이 요구되어왔다. 따라서 본 연구에서는 거품저감 구조물 설계 기술을 확보하기 위하여 공기연행 해석이 가능한 난류 수치 모형을 적용해 보았다. 방류수의 낙하양상에 따라 공기연행률의 차이가 있고 차단벽의 잠김 깊이와 통과 유속에 따라 연행공기의 유출률이 달라지므로 각 Case에 대한 비교를 통해 적정 단면을 설계할 필요가 있다. 본 연구에서는 단면 형상에 따른 공기 연행률과 유출률을 비교하여 거품의 발생 및 유출이 최소가 되는 단면을 찾았으며, 설계 기준은 현장 여건 특히, 바닥 수심고와 월류양상 등에 따라 달라질 수 있으나 수중 방류구 통과 유속은 1 m/s이내가 되도록 하고 차단벽의 잠김 깊이는 최소한 수중 방류구 단면의 수직고 이상은 되어야 함을 알 수 있었다.

드론 영상을 이용한 하천의 구간별 허용 저수량 산정 방법 개발 (Development of a Method for Calculating the Allowable Storage Capacity of Rivers by Using Drone Images)

  • 김한결;김재인;윤성주;김태정
    • 대한원격탐사학회지
    • /
    • 제34권2_1호
    • /
    • pp.203-211
    • /
    • 2018
  • 댐 방류는 장마 또는 가뭄 등을 원인으로 하천과 하천 주변 지역의 관리를 위해 시행되고 있다. 댐 방류는 하천에서 수용할 수 있는 저수량을 정확하게 파악하는 것이 전제되어야 한다. 따라서 하천의 허용 저수량 파악은 하천 주변 환경 관리에 중요한 요소라고 할 수 있다. 하지만 현재 하천의 허용 저수량 파악에 사용되고 있는 수위계측기, 영상을 이용한 방법들은 정확성, 효율성 등의 측면에서 한계점을 보인다. 따라서 이를 해결하기 위해 본 논문에서는 드론으로 촬영한 영상을 기반으로 하천의 허용 저수량을 자동으로 계산하는 방법을 제안한다. 본 논문이 제안하는 방법은 크게 두 단계로 수행된다. 첫 번째 단계에서는 드론 영상을 이용하여 하천의 3차원 모델을 생성한다. 이 생성 과정은 대응점 추출, 영상 표정, 영상 정합 단계로 구성된다. 두 번째 단계에서는 생성된 하천 3차원 모델과 대상지역의 도로 및 하천 레이어를 이용하여 하천 단면 분석을 통해 허용 저수량을 산정한다. 이 단계에서는 하천의 최대 수위를 결정하고 하천을 따라 단면 프로파일을 추출, 3D 모델을 사용하여 대상지역 전체에 대한 허용 유량을 산정한다. 제안한 방법을 실험하기 위하여 북한강 일대의 데이터를 사용하였고, 결과적으로 허용 저수량을 자동으로 추출할 수 있었다. 제안한 방법은 하천과 그 주변지역의 실시간 관리 및 드론 영상을 활용한 3D 모델 활용에 큰 도움이 될 것이라 기대된다.

Chopper Application for Magnetic Stimulation

  • Choi, Sun-Seob;Lee, Sun-Min;Kim, Jun-Hyoung;Kim, Whi-Young
    • Journal of Magnetics
    • /
    • 제15권4호
    • /
    • pp.213-220
    • /
    • 2010
  • Since the hypothalamus immediately reacts to a nerve by processing all the information from the human body and the external stimulus being conducted, it performs a significant role in internal secretion; thus, a diverse and rapid stimulus pulse is required. By detecting Zero Detector accurately via the application of AVR on-Chip (ATMEL) using commercial electricity, chopping generates a stimulus pulse to the brain using an IGBT gate to designate a new magnetic stimulation following treatment and diagnosis. To simplify and generate a diverse range of stimuli for the brain, chopping can be used as a free magnetic stimulator. Then, commercial frequency (60Hz) is chopped precisely at the first level of the leakage transformer to deliver an appropriate stimulus pulse towards the hypothalamus when necessary. Discharge becomes stable, and the chopping frequency and duty-ratio provide variety after authorizing a high-pressure chopping voltage at the second level of the magnetic stimulator. These methods have several aims. The first is to apply a variable stimulus pulse via accurate switching frequency control by a voltaic pulse or a pulse repetition rate, according to the diagnostic purpose for a given hypothalamus. Consequently, the efficiency tends to increase. This experiment was conducted at a maximum of 210 W, a magnetic induced amplitude of 0.1~2.5 Tesla, a pulse duration of $200{\sim}350\;{\mu}s$, magnetic inducement of 5 Hz, stimulus frequency of 0.1~60 Hz, and a duration of stimulus train of 1~10 sec.

청천시 오수량을 고려한 합류식 하수도 소류력 설계법과 이를 활용한 하수관거 개보수방안 (A combined sewer design method using tractive force considering wastewater flow on non-rainy days and its application for improvement methods of sewer)

  • 지현욱;유성수;송호면;강정희
    • 상하수도학회지
    • /
    • 제34권3호
    • /
    • pp.211-220
    • /
    • 2020
  • When domestic sewage and rainwater runoff are discharged into a single sewer pipe, it is called a "combined sewer system." The sewage design standards in Korea specify the flow velocity based only on the volume of rainfall; therefore, sedimentation occurs on non-rainy days owing to the reduced flow rate and velocity. This sedimentation reduces the discharge capacity, causes unpleasant odors, and exacerbates the problem of combined sewer overflow concentration. To address this problem, the amount of sewage on non-rainy days, not just the volume of rainfall, should also be considered. There are various theories on sedimentation in sewer movement. This study introduces a self-cleansing velocity based on tractive force theory. By applying a self-cleansing velocity equivalent to the critical shear stress of a sand particle, sedimentation can be reduced on non-rainy days. The amount of sewage changes according to the water use pattern of citizens. The design hourly maximum wastewater flow was considered as a representative value, and the velocity of this flow should be more than the self-cleansing velocity. This design method requires a steeper gradient than existing design criteria. Therefore, the existing sewer pipelines need to be improved and repaired accordingly. In this study, five types of improvement and repair methods that can maximize the use of existing pipelines and minimize the depth of excavation are proposed. The key technologies utilized are trenchless sewer rehabilitation and complex cross-section pipes. Trenchless sewer rehabilitation is a popular sewage repair method. However, it is complex because the cross-section pipes do not have a universal design and require continuous research and development. In an old metropolis with a combined sewer system, it is difficult to carry out excavation work; hence, the methods presented in this study may be useful in the future.