This paper is to be researched into ozone generation character of Bi-Ti-Si type high dielectric yield ceramic catalyst discharge tube. And conditions of basic experiment are the outside diameter of discharge tube : 52 mm, the length of discharge tube : 350 mm, the frequence : 900 Hz, the temperature of cooling water : 25 $^{\circ}C$, quantity of flow : 5, 10, 20 l/min, pressure : 1.2, 1.4, 1.6 atm, and distance of discharge gap : 0.4, 0.6, 0.8 mm. Ozone generation characteristics were measured to consumption power. At quantity of flow : 20 l/min, discharge gap : 0.6 mm, pressure : 1.6, and consumption power : 150 W, Maximum ozone generation efficiency of 175 g/kWh was obtained. Maximum ozone generation efficiency was measured below the flow quantity of 20 l/min at below pressure of 1.6 atm. However, Maximum ozone generation efficiency was measured over the flow quantity of 20 l/min at over pressure of 1.6 atm.
Minimizing the cylinder wear and the consumption rate of cylinder oil in a large two-stroke marine diesel engine is of great economic importance. In Korea, authors first developed a motor-driven cylinder lubricator for a Wartsila Switzerland large two-stroke diesel engine. The characteristic of the developed product is that can control automatically the oil feed rate with a load fluctuation by the motor drive and the offset cam. For manufacturing the reliable and useful products, however, it is necessary to investigate further characteristics and to improve performances as a cylinder lubricator. In this study, the effects of pump motor speed, plunger stroke and cylinder back pressure on oil feed rate, maximum discharge and delivery pressures are experimentally investigated by using the electronically controlled quill injection system and distributer in the developed cylinder lubricator. It is found that the oil feed rates of electronic control and mechanical type quills with the in-cylinder back pressure are differently characterized by the role of accumulator, the viscous resistance of contact area, etc. It can be also shown that the maximum discharge pressure of the electronic control quill is lower than the mechanical type one but the maximum discharge pressure difference of two types decreased as plunger stroke is small, and the maximum delivery pressures of two types increased as plunger stroke, motor speed and back pressure are elevated but the maximum delivery pressure of mechanical type is higher than the one of electronic control type.
Noticing that action of gaseous phase in insulating oil concerns to the discharging characteristics, I investigated the smalness pressure effects on quantity of the partial discharge and discharging pulse frequency. Tests are carried out between the niddle points in insulating oil at pressure being changed by gradual charge of inert gas Ar. At pressure as low as of 0.1-0.5 torr pulse frequency and maximum partial discharge reach peak while at pressure haigher than 20 torr no pulse is observed. The fact that pulse frequency has peak value at certain presure, which is changed either by charging Ar or by adding oil, implies that the action of gaseous phase depends on pressure. Test results are that partial discharge pulse are governed by pressure of Ar-charged oil, and less partial discharge pulses correspond to smaller bubbles whereas more partial descharge pulses correspond to larger bubbles.
The purpose of the study is to investigate the effect of H$_2$ pressure on partial discharge (PD) activity and aging rate in turbine generator winding insulations. A series of field tests and laboratory tests were peformed to investigate the effect of $H_2$ pressure on PD activity. Field tests were conducted at two unit turbine generators in two conditions, in $H_2$ pressure and in air atmosphere. Obtained results are as follows ; 1) ${\Delta}tan{\delta}$ and maximum partial discharge are reduced with increase of $H_2$ pressure and partial discharge inception voltage. 2) The reduction ratio of ${\Delta}tan{\delta}$ due to $H_2$ pressure is higher than one of PD magnitude. 3) Partial discharge pulses suffer from attenuation and distortion when transmitted along windings, because of the complex L-C network between windings. From the result, partial discharge pulses are subjected to resonance phenomena in a generator winding.
본 논문은 Ba-Ti-Si형 고유전체 세라믹촉매방전관의 오존발생특성에 관해 연구이다. 기본적인 실험조건은 방전관의 외부직경 52 mm, 방전관 길이 350 mm, 전원 주파수 900 Hz, 냉각수 온도 $25^{\circ}C$, 유량 5, 10, 20 L/min, 방전관 내부 압력 1.2, 1.4, 1.6 atm 그리고 방전관과 전극 사이는 0.4, 0.6, 0.8 mm이다. 그리고 실험결과의 특성들은 오실로스코프상에 나타난 리사쥬 도형의 값을 환산한 소비전력으로 유량 20 L/min, 방전간격 0.6 mm, 압력 1.6 atm 그리고 반응기 내의 무성방전에 사용된 소비전력 150 W에서 최대 오존발생효율 175 g/kWh를 얻을 수 있었다. 그리고 최대 오존발생효율 영역은 1.6 atm 이하의 압력에서는 유량 20 L/min 이하에서 측정되었다. 또한 최대 오존발생효율의 영역은 1.6 atm 이상의 압력에서는 유량 20 L/min 이상인 경우에 오존발생 효율이 높아졌다.
It is of great economic importance to minimize the cylinder wear and the consumption rate of cylinder oil in a large two-stroke diesel engine. The motor-driven cylinder lubricator was first developed fur a large two-stroke marine diesel engine made in $W{\ddot{a}}rtsil{\ddot{a}}a$ Switzerland Ltd. by the joint research of industry-university. In this study, the effects of revolution speed, plunger stroke and cylinder back pressure on maximum discharge and delivery pressures, delivery delay duration, and oil feed rate are experimentally investigated by the home-manufactured cylinder lubricator. The maximum discharge pressure with a spot of 0.03 m and the maximum loss pressure at spots of 5, 6.78 and i 0 m away from the end of lubricator slot are increased as plunger stroke, revolution speed and back pressure are elevated, and the delivery delay duration is shortened as plunger stroke, revolution speed and oil pipe length are increased. Also, oil feed rate is increased as plunger stroke and revolution speed are raised, but lowered as the back pressure is increased.
The discharge characteristics of a prototype ion source was investigated, which was developed and upgraded for the NBI (Neutral Beam Injection) heating system of KSTAR (Korea Superconducting Tokamak Advanced Research). The ion source was designed for the arc discharge of magnetic bucket chamber with multi-pole cusp fields. The ion source was discharged by the emission-limited mode with the control of filament heating voltage. The maximum ion density was 4 times larger than the previous discharge controlled by a space-charge-limited mode with fully heated filament. The plasma (ion) density and arc current were proportional to the filament voltage, but the discharge efficiency was inversely proportional to the operating pressure of hydrogen gas. The maximum ion density and arc current were obtained with constant arc voltage ($80{\sim}100V$), as $8{\times}10^{11}cm^{-3}$ and 1200 A, respectively. The estimated maximum beam current was about 35 A, extracted by the accelerating voltage of 80kV.
Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.
Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.
In the present study the glow discharge characteristics of $CO_2$ in a parallel plate electrode system were investigated, and the decomposition properties of $CO_2$ concerned with the discharge characteristics were discussed. The results show that $CO_2$ concentration decreases with increase in discharge power and decrease in gas pressure. The maximum conversion of $CO_2$ by glow discharge was 52% under the conditions of gas pressure, 10m Torr and 290W of discharge power.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.