• Title/Summary/Keyword: Material management

Search Result 3,193, Processing Time 0.027 seconds

Technical Analysis of Material Handling System in Production System (생산시스템에서의 물류시스템 기술분석)

  • Kim, Dong-Hun
    • 연구논문집
    • /
    • s.26
    • /
    • pp.57-68
    • /
    • 1996
  • Recently, a lot of researches on material handling system are actively studied for realization of FA(Factory Automation), FMS(Flexible Manufacturing System) and CIM(Computer Integrated Manufacturing). Management and application of material handling system are precondition technologies playing an important part in integration of production system including manufacturing. assemhly, and inspection cell. In this paper, the general situation of automation technology is investigated and technology level is analyzed in comparision with an advanced country. And the operation trend and part of material handling system including AS/RS, AGV, and Conveyor, are studied. And also technologies related to material handling system in the inside and outside of the country are studied.

  • PDF

A Study on the system Applied Air-Vent to Complex Lay Poly-Urethane Waterproofing Material and Air-Permeability Buffer Sheet of Disconnection Type (Web기반을 활용한 자재 조달 시스템 개선방안)

  • Lee, Im-Bae;Kim, Hong-Hyun;Yoon, Su-Won;Min, Kyung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.141-145
    • /
    • 2008
  • Because of world financial crisis, The Korea domestic construction industry has been damaged hugely on material supplying work. A current domestic material supply system can't react properly on a great rise of foreign exchange rate and raw material price, so the system has a problem which is not properly supplying material. To solve this problem, a more innovative material supply work system is seriously needed than ever. So this study wants to improve material supply system for supplying material right time, right place through applying a web-based system. Applying this, overall process of material-supply-work can be done on a web-based system for immediately understanding change of ordering and warehousing by material-supply-schedule to a domestic construction field.

  • PDF

Development of integrated waste management options for irradiated graphite

  • Wareing, Alan;Abrahamsen-Mills, Liam;Fowler, Linda;Grave, Michael;Jarvis, Richard;Metcalfe, Martin;Norris, Simon;Banford, Anthony William
    • Nuclear Engineering and Technology
    • /
    • v.49 no.5
    • /
    • pp.1010-1018
    • /
    • 2017
  • The European Treatment and Disposal of Irradiated Graphite and other Carbonaceous Waste project sought to develop best practices in the retrieval, treatment, and disposal of irradiated graphite including other irradiated carbonaceous waste such as structural material made of graphite, nongraphitized carbon bricks, and fuel coatings. Emphasis was given on legacy irradiated graphite, as this represents a significant inventory in respective national waste management programs. This paper provides an overview of the characteristics of graphite irradiated during its use, primarily as a moderator material, within nuclear reactors. It describes the potential techniques applicable to the retrieval, treatment, recycling/reuse, and disposal of these graphite wastes. Considering the lifecycle of nuclear graphite, from manufacture to final disposal, a number of waste management options have been developed. These options consider the techniques and technologies required to address each stage of the lifecycle, such as segregation, treatment, recycle, and ultimate disposal in a radioactive waste repository, providing a toolbox to aid operators and regulators to determine the most appropriate management strategy. It is noted that national waste management programs currently have, or are in the process of developing, respective approaches to irradiated graphite management. The output of the Treatment and Disposal of Irradiated Graphite and other Carbonaceous Waste project is intended to aid these considerations, rather than dictate them.

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF

Optimizing Urban Construction and Demolition Waste Management System Based on 4D-GIS and Internet Plus

  • Wang, Huiyue;Zhang, Tingning;Duan, Huabo;Zheng, Lina;Wang, Xiaohua;Wang, Jiayuan
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.321-327
    • /
    • 2017
  • China is experiencing the urbanization at an unprecedented speed and scale in human history. The continuing growth of China's big cities, both in city land and population, has already led to great challenges in China's urban planning and construction activities, such as the continuous increase of construction and demolition (C&D) waste. Therefore, how to characterize cities' construction activities, particularly dynamically quantify the flows of building materials and construction debris, has become a pressing problem to alleviate the current shortage of resources and realize urban sustainable development. Accordingly, this study is designed to employ 4D-GIS (four dimensions-Geographic Information System) and Internet Plus to offer new approach for accurate but dynamic C&D waste management. The present study established a spatio-temporal pattern and material metabolism evolution model to characterize the geo-distribution of C&D waste by combing material flow analysis (MFA) and 4D-GIS. In addition, this study developed a mobile application (APP) for C&D waste trading and information management, which could be more effective for stakeholders to obtain useful information. Moreover, a cloud database was built in the APP to disclose the flows of C&D waste by the monitoring information from vehicles at regional level. To summarize, these findings could provide basic data and management methods for the supply and reverse supply of building materials. Meanwhile, the methodologies are practical to C&D waste management and beyond.

  • PDF

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

A Study on Photoneutron Characteristics Generated from Target and Collimator of Electron Linear Accelerator for Container Security Inspection using MCNP6 Code (MCNP6 코드를 이용한 컨테이너 보안 검색용 전자 선형가속기 표적과 조준기에서 발생한 광중성자 특성에 관한 연구)

  • Lee, Chang-Ho;Kim, Jang-Oh;Lee, Yoon-Ji;Jeon, Chan-hee;Lee, Ji-Eun;Min, Byung-In
    • Journal of the Korean Society of Radiology
    • /
    • v.14 no.4
    • /
    • pp.455-465
    • /
    • 2020
  • The purpose of this study is to evaluate the photoneutron characteristics generated by the linear accelerator target and collimator. The computer simulation design firstly, consisted of a target, a single material target and a composite material target. Secondly, it consisted of a cone beam and a fan beam depending on the type of the collimator. Finally, the material of the fan beam collimator is composed of a single material composed of only lead (Pb) and a composite material collimator composed of tungsten (W) and lead (Pb). The research method calculated the photoneutron production rate and energy spectrum using F2 tally from the surface of a virtual sphere at a distance of 100 cm from the target. As a result, firstly the photoneutron production rate was 20% difference, depending on the target. Secondly, depending on the type of the collimator, there was a 10% difference. Finally, depending on the collimator material, there was a 40% difference. In the photoneutron energy spectrum, the average photoneutron flux tended to be similar to the photoneutron production rate. As a result, it was confirmed that the 9 MeV linear accelerator photoneutron are production increased more by the collimator than by the target, and by the material, not the type of the collimator. Selecting and operating targets and collimator with low photoneutron production will be the most active radiation protection. Therefore, it is considered that this research can be a useful data for introducing and operating and radiation protection of a linear accelerator for container security inspection.

A Method to Measure Damage Areas on Railway Accidents by the HAZMATs types using GIS Spatial Analysis (GIS 공간 분석기법을 활용한 위험물질별 철도사고 피해규모 자동추출방안에 관한 연구)

  • Park, Min-Kyu;Kim, Si-Gon;Lee, Won-Tae
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.35-42
    • /
    • 2010
  • Due to the industrialization and urbanization, the transport of hazardous materials increases, which rises possibilities in occurring prospective accidents in terms of hazardous material transport as well. This study applied the model developed from the previous research to analyze the scale of damage areas from the accidents related to hazardous material accidents, as well as suggested a method to measure automatically the scale of accident including casualties and environmental damage based on the guideline which suggests the quantities of hazardous materials exposed from an accident and was defined in the study of standardization for hazardous material classification. A buffering analysis technique of Geographic Information System (GIS) was applied for that. To apply the model which evaluates the scale of population and exposure to environment on each link, rail network, zones, rail accident data, rail freight trips, and locations of rivers etc were complied as a database for GIS analysis. In conclusion, a method to measure damage areas by the types of hazardous materials was introduced using a Clip and a Special Join technique for overlay analysis.

RFID Location Based Tree Management System (TMS) Using Insertion UHF RFID Tag and GPS (UHF RFID 태그와 GPS를 사용한 위치기반 수목관리용 RFID 시스템 구현)

  • Nam, Seahyeon;Chung, You Chung
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37C no.10
    • /
    • pp.909-914
    • /
    • 2012
  • The paper introduces the RFID location based Tree Management System (TMS) using UHF RFID tag and GPS. The bolt shape tag has been developed since the wood material has high dielectric constant. Since the characteristics and impedance of tag antenna can be changed by the material next to the tag, the plastic bolt shape tag antenna has to be carefully designed with consideration of the high dielectric constant of the wood material. The RFID TMS system has been utilized with the bolt shape tag antenna and GPS. The TMS system uses and links Google map to locate the location of the trees. Therefore, this system allow us to manage the trees economically and efficiently.