Journal of the Korean Society of Industry Convergence
/
v.24
no.1
/
pp.19-29
/
2021
In the Port Logistics system, Container Stowage planning is an important issue for cost-effective efficiency improvements. At present, Planners are mainly carrying out Stowage planning by manual or semi-automatically. However, as the trend of super-large container ships continues, it is difficult to calculate an efficient Stowage plan with manpower. With the recent rapid development of artificial intelligence-related technologies, many studies have been conducted to apply enhanced learning to optimization problems. Accordingly, in this paper, we intend to develop and present a Deep Q-Learning Network model for the Master Stowage planning of Container ships.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.4
/
pp.2799-2806
/
2015
This study aims to find out the better management plan for city master plannning as an ODA to accomplish the economic effect. For this study, the "Hai Phong New Town Development Project" and the "Modification of Hue City's Master Plan" were studied. The result of the case study shows that there was difference between the two projects which was the status of following projects. While those two projects were highly acclaimed, only Hue project had several projects. This is because of the understanding degree on ODA project of participants, the distinct characteristics of the recipient country; Vietnamese local and central government, and the difference of each project's main purpose. And the result of FGI shows that to accomplish economic effects of master planning project as ODA, the enthusiastic approach to find out following project from the beginning step of the master planning, the experience of project manager on ODA, the close association with the recipient country, and the positive support from the Koica especially, the local office were crucial.
Proceeding of Spring/Autumn Annual Conference of KHA
/
2005.11a
/
pp.189-192
/
2005
The purpose of this study is to analyze space composition and size of the Master Zone in the apartment unit plan. For this, we analyzed 435 samples by searching web-sites of the 5 main construction companies. The major results of this study are as follows. 1) Master Zone is organized 4 spaces such as main room, bathroom and make-up & dress room. Six types of Master Zone are classified with the composition of 4 spaces. 2) The size of the Master Zone is increased in proportion to the square meter. But the range of the ratio is small range of fluctuation as 20%${\sim}$30%. 3)The size and ratio of the each spaces of the Master Zone are analyzed. The size of bedroom is increased but the ratio is decreased. The size of bathroom is increased but the ratio is regular as 4%${\sim}$5%. The size of make-up and dressing room is generally increased but the range of the size and ratio is the most extensive. Through this analysis and research, this study would be provied the basic data for actual housing planning and to contribute to future trends of apartment houses.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.9
/
pp.6376-6384
/
2015
In practice of urban redevelopment promotion projects, since the decision-making is dependent on the verbal agreements between the participants, planning changes are frequently occur. A master plan can be utilized as an effective feedback and adjusting means for decisions. It is a difficult to establish a master plan quickly and effectively to consider the large number of information. Effective decision support system that can storage and retrieval information items systematically and efficiently necessary when planning master plan is required. In this study, a data-warehouse prototype that supports the master planning at early stage was suggested. A metadata index database was developed by identifying information items of base survey results and master plan cases. Also user interface for information searching was presented. The applicability of the prototype was evaluated by case application. It was found that the prototype allows effective searching of desired information through meta data.
Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
Journal of Construction Engineering and Project Management
/
v.5
no.2
/
pp.11-15
/
2015
The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).
The purpose of this study is to examine the characteristics of housing planning in 23 wards of the Tokyo Metropolitan Area. First, the present residential conditions in the 23 wards were investigated. And then we analyzed the basic purpose and individual policies of Housing Master Plan in the 4 wards. In this study, it was found that the basic purpose of Housing Master Plan can be classified into three parts: amenity, safety, and diversity. Analyzing the individual policies, it was found that the priority are given to safety and diversity out of the those three parts.
Journal of the Korean Institute of Landscape Architecture International Edition
/
no.1
/
pp.84-88
/
2001
Decision progress, plan content and planning division title of the master plan of the green in Kamakura City Japan were described. Conservation of the green and various effectiveness of the measure for realizing the green creation plan and the future development were discussed. It was indicated that the cooperation between citizens land owners and administration of the country, prefecture and city was important.
Recently the number of rural development plans are increased and projects supported by government are various. These makes rural plans important. But there are many gaps between proposed plan and implementation. These gaps were wasteful in terms of resource management. This study examines differences between plan and implementation and the reasons why they are occurred. For this purpose, we did a case study which is focused on the four-year implementation of 2004-2006 "Unique Experience Village Master Plan" of Seochon, Chungbuk. As a result, we verified facts of gaps and causes, and two major causes were detected : one is the absence of operating and managing body(such as promoter of project, village leader, residences), and the other is inadequate master plan.
Journal of the Korean Institute of Rural Architecture
/
v.4
no.3
/
pp.63-76
/
2002
The purpose of this research is planning the master plan of a rural village for rural-tourism type. The rural village area is faced on the moment of the change. A rural village only have not the thing, that the facility of the food manufacture. A rural village inhabitants need an environment improvement and income enlargement. And for the citizens need a space facility of a leisure, practical use, rest and experience in rural area. The government executed a project for this purpose. So, Sinchon village, San-chung were selected to an object village in Gyeong-nam. This investigation analyzed this village's planning elements, and established basic directions of village master plan.
A collision-free trajectory planning algorithm is proposed to optimally coordinate two robots working in a common 3-D workspace. Each link of the two robots is modeled as a line segment and by their motion priority, one of the two robots is chosen as the master and the other the slave. And the one-step-ahead minimum distance between the two robots is computed by moving the master to the next location on its specified trajectory. Then the nominal trajectory of the slave is modified such that the distance between the next locations of the master and the slave must be larger than a prespecified allowable minimum distance. Here the weighted sum of the trajectory error and the joint motions of the slave is minimized by using the linear programming technique under the constraints that joint angle and velocity limits are not violated. To show the validity of the proposed algorithm, a numerical example is illustrated by employing a two dof's and a three dof's planar robots.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.