• Title/Summary/Keyword: Master Planning

Search Result 310, Processing Time 0.027 seconds

Development of an Application Software for the Die-Production Information Management (금형 생산관리를 위한 응용 소프트웨어의 개발)

  • Kong, Myung-Dal;Kim, Jung-Ja
    • IE interfaces
    • /
    • v.9 no.2
    • /
    • pp.143-158
    • /
    • 1996
  • This paper deals with the development of a software module for production planning and scheduling activities of an actual die-production management system. Scheduling problems, such as master schedule and detailed schedule, are the focal point of the whole article and they are considered in terms of operation procedures. Schedule-explosion module and load levelling module are the essential components of schedule management. The scheduling module allocates the resources, determines the process priority and the planned start and completion dates of processes. Rescheduling can be done to manipulate unforeseen situations that schedule is delayed owing to inducing defectives, machine breakdowns and lumpy demands. This study indicates a practical model for the die-producation management and helps to apply it for jobs in the real situation.

  • PDF

A Study on Strategic Allocation Algorithm to Make Sales Plan (판매계획 수립을 위한 전략적 할당 알고리듬에 대한 연구)

  • Kang, Chul-Won;Won, Dae-Il;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.16 no.2
    • /
    • pp.117-124
    • /
    • 2003
  • This study focuses on the detailed explanation of the strategic allocation algorithm which can be used as an ATP(Available To Promise) from the perspective of customers, and as a sales plan for sales organizations. A strategic allocation algorithm includes three methods depending on FIXED RATIO, RANK and DEMAND BASIS. In addition, further topics would be discussed regarding the method of system implementation utilizing strategic allocation algorithms and information flow with an aim to integrate such a sales plan into the e-Biz. This study aims to provide a new solution in order to secure emerging competitive factors in today's enterprise world; that is, an achievement of faster business processes. It is suggested that this new solution be implemented in order to achieve an efficient business environment by systemizing the decision making process which in the past was manually conducted.

A Study on Rural Theme Park Considering the Local Characteristics (지역적 특성을 고려한 농촌테마공원에 관한 연구)

  • Rhee, Shin-Ho;Choi, Se-Hyun;Yoon, Seong-Soo;Choi, Ae-Soon;Eom, Dae-Ho
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.3
    • /
    • pp.27-34
    • /
    • 2011
  • The definition of a rural theme park was presented and it's development directions were set up as grasping the problems of existing rural theme park. The creation method of a rural theme park was presented through the case study of a design planning. A rural theme park should be designed with consideration to regional characteristics based on the rural amenity. The characteristics of rural theme parks set by theme, unity, integrity, originality, and eco-friendly. And the visit reasons of rural theme park are rural experience, lodging, relaxation or recreation, comfort or easy, and food purchase. A case study area is around Geopo-Ri and Gueum-Ri Okcheon-Gun Chungcheongbuk-Do. The master plan of this area was prepared.

A Study on Student & Learning Support Spaces of Departmentalized Class System at Middle & High Schools in Chungbuk (충북지역 교과교실제 중·고등학교의 학생 및 학습지원공간 연구)

  • Jung, Jin-Ju;Lee, Ji-Young;Lee, Jae-Hyung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.2
    • /
    • pp.47-54
    • /
    • 2011
  • According to the master plan of the Ministry of Education, Science and Technology, departmentalized class system will be extended to all general middle & high schools by 2014 with the exception only of those having less than 6 classes located in small cities in rural areas. Under departmentalized class system, according to class timetable, students need to move from classroom to another classroom and areas where homebases, lounges, media spaces, rest places, and etc. This study has been undertaken to provide architectural data required in planning for student & learning support space for schools operating departmentalized class system, by investigating and analyzing cases in use at schools operating the system in Chungbuk area. As departmentalized class system is increasingly introduced, student & learning support space should be understood newly as spaces indispensable for students.

Improvement of Corner Contouring Accuracy of CNC Servo Systems with Communication Delay (통신지연을 갖는 CNC 서보 시스템에 대한 모서리 윤곽정확도 향상)

  • Lim, Jong-Hyup;Jee, Sung-Chul
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.28 no.2
    • /
    • pp.168-175
    • /
    • 2011
  • Contouring accuracy of CNC machine tools is very important for high-speed and high-precision machining. In particular, large contour error may occur during corner tracking. In order to reduce the corner contouring error, acceleration and deceleration control or tool-path planning methods have been suggested. However, they do not directly control the corner contouring error. In the meantime, network servo systems are widely used because of their easiness of building and cost effectiveness. Communication latency between the master controller and servo drives, however, may deteriorate contouring accuracy especially during corner tracking. This paper proposes a control strategy that can accurately calculate and directly control the corner contouring error. A prediction control is combined with the above control to cope with communication latency. The proposed control method is evaluated through computer simulation and experiments. The results show its validity and usefulness.

Achievements and Implications of Gae-Seong Development Project (개성공단 개발사업의 성과와 함의)

  • Heo, Ryoun
    • Journal of the Korean Geographical Society
    • /
    • v.46 no.4
    • /
    • pp.518-533
    • /
    • 2011
  • The purpose of this study is addressing the process of developing industrial complex in North Korea, especially in Gaeseong. The Gaeseong Industrial Complex(GIC) is the first project which is completed in North Korea by South Korean company. LH, the main developer of the project successfully made the various procedures, master planning, land acquiring, developing, attracting investment, managing SOC, for making the industrial complex competitive using its own know-how and experiences in South Korea. The New development experience of LH in Gaeseong Industrial Complex case would indicate various implications to us for making another developing project in North Korea.

Development of a Process Monitoring System for Real-Time Process Control (실시간 공정관리를 위한 공정모니터링 시스템 개발)

  • Lee, Jung-Hwan;Lee, Seung-Hoon;Oh, Hyun-Ok
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.1
    • /
    • pp.92-100
    • /
    • 2008
  • This paper develops a process monitoring system for real-time process control. The practical case is studied on a small and medium marine equipment company. For business process reengineering of the company, we adopt an approach based on information engineering methodology, which consists of four stages : planning, analysis, design, and implementation. The system is developed for Client/Server environment. We discuss the constructing of hardware system for real-time process control at low cost. The developed system is composed of interrelated modules for item master and BOM management, process control, facility management, SQC and work report.

A Study on the Changing Process in Hospital Architecture - A Case Study on the J University Hospital - (병원건축의 변화과정에 관한 연구 - J대학부속병원을 대상으로 -)

  • Choi, Kwang-Seok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.4
    • /
    • pp.21-30
    • /
    • 2008
  • Domestic hospital architectures were developed with the nation's industrialization after 1960s. Particularly, with the rapidly growing healthcare demands according to The National Health Insurance Plan which was introduced in 1977 and expanded to entire nation in 1989, the number of healthcare facility is also increasing according to the expansion of the existing facilities and construction of new buildings. Now, twenty to thirty years were past since that growing period of healthcare architecture. Many hospitals are facing on the phase of restructuring and modernization for their resources. J university hospital is a representative case of hospital development which the growth of facility was stopped by insufficient site area. This study, analysing its past statistics and drawing data of that hospital, presents the characteristics of the changes and basic data of the master planning for the future hospital development.

  • PDF

Comparative Study of Master Plan for Open Spaces in Japan and China -A Comparison of Planning Drafts and Their Processes-

  • Shen, Yue;Saitoh, Yohei;Kinoshita, Takeshi;Ye, Kyungrock
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.53-58
    • /
    • 2001
  • The study made a comparison of the draft making process and implementation of open spaces in Japan and China, and pointed out the issues to be solved. In summary, we discovered that the Japanese plan emphasizes joint conduct and cooperation between residents and corporation/organization, while the Chinese plan is characterized by its active usage of administrative lines. Regarding the policies of their plans, there are many similarities in the basic issues for both countries. The study clarified the differences in measures responding to geographical and systematic features of each country.

  • PDF

A Study on the Use and Provision of Urban Parks in Kwang Ju City (광주시 도시공원의 이용과 공급에 관한 연구)

  • 오병태
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.22 no.4
    • /
    • pp.1-21
    • /
    • 1995
  • Parks in Kwang Ju ar determined by the development of a housing project under the regulations of land development rather than the planning approach of park provision. This study tries to identify who is the provider of parks, to estimate the size of urban parks per person in the area of the housing project, to look at the spatial allocation patterns of park provision and to identify the character profiles of users and the social profile of an ares(Dong). This research has produced the following major conclusions : 1. The city government should set up a master plan of park provision to control park delivery system to avoid maldistribution. 2. A positive discrimination policy should be introduced to disadvantaged areas in terms of park provision. 3. The null hypothesis - there is no relationship between distance and park Use - is rejected by the correlation rate of 0.4984. 4. The ratio of parks per a person ; 10.43㎡/person in 1990 has decreased to 10.41㎡ /person in 1994. This means that the increase of parks in terms of quantity could not catch up the increase of population.

  • PDF